Barrel stave allocation on the PP0 exhaust fitting

Slides:



Advertisements
Similar presentations
ATLAS UPGRADE BARREL END SERVICES – Work on trying to reduce mass of cooling in R/PHI TJ Fraser UCL Assuming cooling pipes have to be directed.
Advertisements

Barrel services minimum space allocation in Z ‘Strawman’ layout and Spider… layout WARM and COLD GAP versions Services envelope in Z: In order to reserve.
Fig. 4-1, p Fig. 4-2, p. 109 Fig. 4-3, p. 110.
Z x 725 Sensor Mark 140 x Sensor Coordinates Bump Bond Pad Ø = 12/ FE PAD#2 110 x 210 LM Structure FE Chip Coordinates Bump.
T h e G a s L a w s. T H E G A S L A W S z B o y l e ‘ s L a w z D a l t o n ‘ s L a w z C h a r l e s ‘ L a w z T h e C o m b i n e d G a s L a w z B.
P.464. Table 13-1, p.465 Fig. 13-1, p.466 Fig. 13-2, p.467.
P449. p450 Figure 15-1 p451 Figure 15-2 p453 Figure 15-2a p453.
Fig. 11-1, p p. 360 Fig. 11-2, p. 361 Fig. 11-3, p. 361.
Problem Solving. Model Drawing Steps: 1.Read the entire problem. 2.Decide who is involved in the problem. 3.Decide what is involved in the problem. 4.Draw.
This session will resume in 15 minutes. This session will resume in 14 minutes.
Table 6-1, p Fig. 6-1, p. 162 p. 163 Fig. 6-2, p. 164.
1 times table 2 times table 3 times table 4 times table 5 times table
Geometry Scale. Geometry Scale is used when something that is drawn on paper is too large to fit, or is too small to be seen. For now we are going to.
Comparison of cooling services at barrel end Description SCT Barrel Upgrade ID barrel one end one end Total number of staves/rows 176 Staves/rows serviced.
SLHC - WP7 Barrel UPDATE on LAYOUT OF SERVICES AT THE BARREL ENDS OPTO PCBS: Sketches describe options after discussion with Tony Weidberg ( ) Preference.
ATLAS Upgrade ID Barrel: Services around ‘outer cylinder’ TJF updated According to the drawing ‘Preparation outer cylinder volume reservation’
H OW TO MAKE A TOMSON GUN By Rhys Leverington. S TEP Cut the base out this is going to be the bit that holds the barrel. Then start to.
ATLAS Pixel Detector September 2003 Services E. Anderssen LBNL Service Connectivity from Module to PP1b Eric Anderssen LBNL Pixel Services Meeting, CERN.
+2.5 V 30 A +5.8 V 3 A -3.6 V 25 A +4 V 100 A +4 V 100 A Controller TGC1 subrack organization +4 V 65 A Controller First 84 HP (19”) subrack Controller:
Price (2000 dollars per barrel) Year. Quantity (millions of barrels per day) Year.
9.13 Surface Integrals Arclength:.
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
Rebecca Duttry.   Resume Resume  Community Service Form 1 Community Service Form 1  Community Service Form 2 Community Service Form 2  Job Shadow.
Tables Learning Support
M. Gilchriese - September 2000 Pixel Insertable Layouts September 2000.
15th January 2014 WP4 Meeting Oxford1 EoS PCB Mike Dawson University of Oxford.
Bell Ringer Simplify the following Using Properties to Simplify Expressions.
第四部分 生态系统生态学 生态系统的主要类型与分布 高建芳
ПЕЧЕНЬ 9. Закладка печени в период эмбрионального развития.
The reading is 7.38 mm. The reading is 7.72 mm.
10 mm is the same as... 1 cm. 20 mm is the same as... 2 cm.
Get Genuine Vintage Side Tables from reliable furniture company.
PANDA Yoke of the Magnet
Multiplication table. x
Future tube procurement Richard French
PANDA Collaboration Meeting , BINP Sergey Pivovarov.
Resumes.
Times Tables.
Who Wants To Be A Millionaire?
مدیریت استراتژيک منابع انسانی
14.3: One-Sided Limits and Continuity
More on Limits.
How tall is the table?.
Dots 5 × TABLES MULTIPLICATION.
Dots 5 × TABLES MULTIPLICATION.
Dots 2 × TABLES MULTIPLICATION.
6.9 Modeling With Polynomial Functions
Engineering Drawings Geant4 Fine Geometry Geant4 Coarse Geometry
#. shop now P1080P · /' '
Write Polynomial Functions and Models
5 × 7 = × 7 = 70 9 × 7 = CONNECTIONS IN 7 × TABLE
5 × 8 = 40 4 × 8 = 32 9 × 8 = CONNECTIONS IN 8 × TABLE
Dots 3 × TABLES MULTIPLICATION.
It’s Time for a Break!!!.
Dots 6 × TABLES MULTIPLICATION.
4 × 6 = 24 8 × 6 = 48 7 × 6 = CONNECTIONS IN 6 × TABLE
5 × 6 = 30 2 × 6 = 12 7 × 6 = CONNECTIONS IN 6 × TABLE
Ռազմավարական կառավարում
Dots 2 × TABLES MULTIPLICATION.
Figure 11-1.
10 × 8 = 80 5 × 8 = 40 6 × 8 = CONNECTIONS IN 8 × TABLE MULTIPLICATION.
3 × 12 = 36 6 × 12 = 72 7 × 12 = CONNECTIONS IN 12 × TABLE
Figure Overview.
3 times tables.
6 times tables.
5 × 12 = × 12 = × 12 = CONNECTIONS IN 12 × TABLE MULTIPLICATION.
Squares and Square Roots
5 × 9 = 45 6 × 9 = 54 7 × 9 = CONNECTIONS IN 9 × TABLE
3 × 7 = 21 6 × 7 = 42 7 × 7 = CONNECTIONS IN 7 × TABLE
Pps Download Center ©
Presentation transcript:

Barrel stave allocation on the PP0 exhaust fitting

A side L1-B04-S2 L2-B06-S2 L2-B04-S1 L1-B02-S2 L2-B02-S2 L2-B26-S2 20 mm 211 mm L1-B04-S2 L2-B06-S2 L2-B04-S1 L1-B02-S2 L2-B02-S2 L2-B26-S2 L1-B19-S1 L2-B24-S2 L1-B17-S1 L2-B22-S2 L1-B15-S2 L2-B18-S1 L1-B13-S2 L2-B20-S1 L2-B14-S2 L1-B11-S1 L2-B16-S1 L1-B08-S2 L2-B12-S2 L1-B09-S2 L2-B08-S2 L1-B06-S2 L2-B10-S1 A1 A2 A3 A4 A5 A6 A7 A8

C side L2-B07-S1 L0-B03-S2 L1-B05-S1 L2-B09-S1 L0-B04-S1 L0-B02-S2 20 mm L2-B11-S2 L1-B03-S1 L0-B05-S1 C3 L2-B03-S1 C2 L2-B13-S1 211 mm L0-B01-S1 L1-B10-S1 C1 C4 L1-B01-S2 L2-B01-S1 L2-B15-S1 L0-B11-S1 C5 C8 L0-B06-S2 L2-B25-S2 L1-B12-S1 L0-B10-S2 C6 C7 L2-B17-S1 L1-B18-S1 L2-B23-S2 L0-B07-S2 L1-B16-S2 L2-B19-S1 L0-B09-S1 L1-B14-S2 L2-B21-S1 L0-B08-S2

Resume table The exhaust location on each octant are numbered in the same direction than the octant one 1 2 3 4 5 5 4 3 2 1 C3 C2 A2 A1