Bruce Fergusson, CIH, CIEC, PE (retired) Air Source Technology, Inc.

Slides:



Advertisements
Similar presentations
OBAR SYSTEMS PROVIDING VOC AND RADON SERVICES SINCE 1985
Advertisements

THE HELP PROCESS. Professional medical equipment project management is the systematic, knowledgeable process through which all items of capital equipment.
TESTING AND BALANCING IN HEALTHCARE FACILITIES. What is Test & Balance The art of establishing air and water flows to meet design criteria. Total System.
Acquisition Office The Acquisition Process Acquisition Staff.
MAJORS COST ESTIMATING TOOL WORKSHOP January 19, 2012 Cost Estimating Tool Overview.
Managing a Successful Mechanical System project Following design – what next?
Why Dilution may not always be a Solution Winnie Cheng, Regional Radiation Specialist AARST 2014 International Radon Symposium Charleston, South Carolina.
Info1409 De Montfort University Lecture 3 The Systems Development Life Cycle Systems Analysis & Design Academic Year 2008/9.
IS4799 Information Systems and Cybersecurity Capstone Project
Medicaid Management Information System (MMIS) Replacement Planning Phase.
Hide-A-Way Lake, Inc. Low Pressure Sewer System Prepared by Dungan Engineering, P.A.
0-1 Team # Status Report (1 of 4) Client Contact –Point 1 –Point 2 Team Meetings –Point 1 –Point 2 Team Organization –Point 1 –Point 2 Team #: Team Name.
CUTTHROAT ENERGY Preliminary Design Review. Sponsored by:
0-1 Team # Status Report (1 of 4) Client Contact –Status Point 1 –Status Point 2 Team Meetings –Status Point 1 –Status Point 2 Team Organization –Description.
Subcontracting. Subcontractors % of work is subbed –Significant impact on costs and schedule –Want to develop a working relationship with good.
David Saenz FAC November 11, 2008 SLAC National Accelerator Laboratory 1 Far Experimental Hutches David Saenz Project Manager.
Work Plan Presentation Template CONFIDENTIAL The use or disclosure of information presented in this document is strictly prohibited.
EMBA Project Scope Management J. S. Chou, P.E., PhD.
Like it never even happened. ® NATIONAL AGREEMENT Alfa Insurance SERVPRO ® Industries, Inc.
Vapor Intrusion What the Future Holds January 15, 2015 Hans Neve Supervisor Minnesota Pollution Control Agency David Jones Supervisor Minnesota Department.
Doing Business in India Acme Manufacturing Company Auburn Hills MI USA.
Mitigation Dust Loading REMP Air Samplers. Dust Loading Definition / Symptoms Accumulation of loose particulate matter on air sampling particulate filter.
Torrance Unified School District Bond Measure Y Bond Measure Z Quarterly Construction Update September 30, 2009.
Construction Cost Estimating Class #2: The Estimating Process Prof. Ralph V. Locurcio, PE.
Project Status Report Presenter Name Presentation Date.
1 DPW Presentation to the Portfolio Committees on Correctional Services and Public Works Kimberley Correctional Centre 24 November 2010.
1 Second Safety Council Meeting Tucson, AZ April 10-11, 2014 Name of Meeting Location Date - Change in Slide Master Safety in the Procurement Process Bill.
CON 4003 CVE 4073/5073 Construction Cost Estimating Class #2: The Estimating Process Prof. Ralph V. Locurcio, PE.
PROJECT PHASES ACT Objective To provide an understanding of the design & construction process and the roles of the different participants in this.
OBAR SYSTEMS PROVIDING RADON SERVICES SINCE 1985 Over 20,000 systems installed since 1985 NJDEP Licensed contractor Mitigation services for air and water.
Reliable Power Reliable Markets Reliable People Ancillary Services: 2008 Preliminary Cost Forecast 2007 Budget Review Process August 28, 2007 Commercial.
Submittals. Submittals key to quality management of project Document or product turned in by construction team to verify that what they plan to purchase,
Program / Project Review PROGRAM/PROJECT REVIEW FORM
© 2006 Cisco Systems, Inc. All rights reserved. CUDN v1.1—3-1 Developing a High-Level Design Final Design and Implementation.
Allowances, Unit Prices, and Alternates ACT
New Audit Structure Illinois Radon Stakeholders Meeting April 24, 2015 Melinda Lewis IEMA Radon Program.
Conceptional Design Review Group 9 – Department of Health William Allred.
Introduction to Project Management
Rigid Foam Anelise Williamson MEEN Prime Flex 985 Urethane Resin Lightweight, rigid foam Two components.
Presented to: By: Date: Federal Aviation Administration Runway Safety Nextgen Initiatives Capstone 3 Industry Day Paul S. Erway, AJS-4SW, Runway Safety.
OBAR SYSTEMS PROVIDING VOC AND RADON SERVICES SINCE 1985 Over 30,000 systems installed since 1985 NJDEP Licensed contractor Mitigation services for air.
PRESENTED AND PREPARED BY CITY OF MISSOULA PUBLIC WORKS DEPARTMENT.
Day 4 Part 2 Technician’s Guide & Workbook for Home Evaluation and Performance Improvement.
ENGINEERING n MANAGEMENT n ENVIRONMENTAL
Camera PDR/CD1 Planning 19 September 2008
LNBA Subgroup: Avoided Transmission Value
Installation Procurement Package
Vendor Statements of Work: Your Role as an IT Professional
Sun City Lift Station Odor Control Improvements
Distributed software development
Audie Murphy Road Sewage Lift Station Award of Construction Contracts
Planning Geomagnetic Disturbance Task Force (PGDTF) Update to the ROS
Preliminary Power Point Slides
Case Road Sewer Joe Mouawad, P.E. October 27, 2016.
Perris Water Filtration Plant Membrane Upgrade – Phase I
College II Tank Interior Recoating Award of Construction Contracts
PRE-BID MEETING ITB UNDP Design and Construction of a new medical warehouse in Bissau, Guinea Bissau 15th August 2017 Presented by Antoine Fadoul UNDP-
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
RDG 530 Enthusiastic Studysnaptutorial.com
DEFINING THE PROJECT CHAPTER 4.
Copyright © Simon Wallace
David Salazar, Chief Facilities Executive
مسئولیتهای پزشکی درانجام اقدامات تشخیصی و درمانی (رابطه حقوقی پزشک و بیمار)
دکتر سعید غلامزاده مدیرکل پزشکی قانونی استان فارس
End of Fieldwork Debriefing
SWEN 5230 Your Project Title
Task: View Approval History
Draft P802.11p D3.0 Redline Authors: August 2007 Date:
Thing / Person:____________________ Dates:_________________
Contract Award for the Colorado Street Bridge Suicide Mitigation Enhancements Project City Council May 20, 2019 Item # 7.
Presentation transcript:

Bruce Fergusson, CIH, CIEC, PE (retired) Air Source Technology, Inc. FOLLOW-UP REPORT: ALTERNATIVE APPROACHES TO MANAGING SCHOOL MITIGATION AND SUB-SLAB DIAGNOSTIC TESTING Bruce Fergusson, CIH, CIEC, PE (retired) Air Source Technology, Inc. bfergusson@airsourcetechnology.com The 2017 International Radon Symposium™

Recap: Alternative Process Mitigation Review (Case Study) The 2017 International Radon Symposium™

Recap: Alternative Process Radon Measurement Issues Would you want to send your children to a school that had been tested as radon safe/compliant in August? The 2017 International Radon Symposium™

Recap: Alternative Process ASD System Performance Deliverable: Interim ASD System Performance Deliverable: Pressure Final Mitigation Systems Performance Deliverable: Radon The 2017 International Radon Symposium™

Recap: Alternative Process The 2017 International Radon Symposium™

Recap: Alternative Process Performance-Based Specification AARST/ASTM Installation Defined Scope Of Work (Owner “warranty of slab definition) Known Change Order Costs Preliminary Completion Date The 2017 International Radon Symposium™

Recap: Alternative Process ASD System Performance Deliverable: Interim ASD System Performance Deliverable: Pressure Final Mitigation Systems Performance Deliverable: Radon The 2017 International Radon Symposium™

Recap: Alternative Process Factors to Define Process Success Expedited Remedy Higher Confidence in Remedy Project Cost Management The 2017 International Radon Symposium™

Recap: Alternative Process Results Expedited Remedy Higher Confidence in Remedy Project Cost Management The 2017 International Radon Symposium™

Pre-Bid Slab Diagnostics Mitigation Review (Case Study) Pre-Bid Slab Diagnostics Radon Measurements Quote Management Documentation The 2017 International Radon Symposium™

Pre-Bid Slab Diagnostics Mitigation Review (Case Study) Pre-Bid Slab Diagnostics The 2017 International Radon Symposium™

Mitigation Review Radon Measurements (Case Study) The 2017 International Radon Symposium™

Mitigation Review Quote Management (Case Study) The 2017 International Radon Symposium™

Mitigation Review Documentation (Case Study) The 2017 International Radon Symposium™

Recap: Alternative Process Mitigation Review & Results Process Review Process Results Mitigation Review & Results (Case Study) The 2017 International Radon Symposium™

Bruce Fergusson, CIH, CIEC, PE (retired) Air Source Technology, Inc. FOLLOW-UP REPORT: ALTERNATIVE APPROACHES TO MANAGING SCHOOL MITIGATION AND SUB-SLAB DIAGNOSTIC TESTING Bruce Fergusson, CIH, CIEC, PE (retired) Air Source Technology, Inc. bfergusson@airsourcetechnology.com 859-299-0046 The 2017 International Radon Symposium™