Cheyenne Regional Freight Mobility Plan AMPO PRESENTATION OCTOBER 2016 Cheyenne Regional Freight Mobility Plan
AMPO PRESENTATION OCTOBER 2016
AMPO PRESENTATION OCTOBER 2016
AMPO PRESENTATION OCTOBER 2016
AMPO PRESENTATION OCTOBER 2016
AMPO PRESENTATION OCTOBER 2016
Energy/Environment Trends and Issues AMPO PRESENTATION OCTOBER 2016 Energy/Environment Trends and Issues
Technology Trends and Issues AMPO PRESENTATION OCTOBER 2016 Technology Trends and Issues Key Trends: ITS / Advanced Traffic Operations Technology Autonomous Vehicles / Smart Vehicles / Connected Vehicles
Laramie County Location Quotients AMPO PRESENTATION OCTOBER 2016 Laramie County Location Quotients
2014 Laramie County Sector Employment AMPO PRESENTATION OCTOBER 2016 2014 Laramie County Sector Employment
AMPO PRESENTATION OCTOBER 2016 Mode Share
AMPO PRESENTATION OCTOBER 2016 S. W. O. T. Approach Freight Activity What regional assets are viewed as a weakness? Freight activity can result in conflicts = threats How can the regions strengths be turned into opportunities regional jobs and economic vitality
Identifying Traffic/Infrastructure Issues AMPO PRESENTATION OCTOBER 2016 Identifying Traffic/Infrastructure Issues
Identifying Traffic/Infrastructure Issues AMPO PRESENTATION OCTOBER 2016 Identifying Traffic/Infrastructure Issues
Regional Freight Forum AMPO PRESENTATION OCTOBER 2016 Regional Freight Forum
Proposed Action Projects AMPO PRESENTATION OCTOBER 2016 Proposed Action Projects Selection? Input from Regional Freight Forum, Driver Break Room Surveys, and One-on-One Interviews Near-Term, Mid-Term, and Long-Term
Goals and Performance Measures AMPO PRESENTATION OCTOBER 2016 Goals and Performance Measures Goal 1: SAFETY - Measure: Reduce crash rates on regional truck route system Goal 2: INFRASTRUCTURE CONDITION - Measure: Reduce deficient miles of excessive rut depth, pavement serviceability and roughness; reduce structurally deficient and low clearance bridges. Goal 3: CONGESTION REDUCTION - Measure: Address traffic bottlenecks and reduced delays by reducing the number of intersections with LOS E or F on regional truck route. Goal 4: SYSTEM RELIABILITY - Measure: Minimize rail-vehicle delays by addressing higher volumes at-grade railroad crossings. - Measure: Parking spaces available for truck parking during weather closures on Interstate. Goal 5: FREIGHT MOVEMENT AND ECONOMIC VITALITY - Measure: Reduce rail delays and address design deficiencies at interstate interchanges and along routes that are part of the national freight network.
AMPO PRESENTATION OCTOBER 2016 S.W.O.T.
AMPO PRESENTATION OCTOBER 2016 S.W.O.T.
AMPO PRESENTATION OCTOBER 2016 S.W.O.T.
AMPO PRESENTATION OCTOBER 2016 S.W.O.T.
AMPO PRESENTATION OCTOBER 2016
Tom Mason, Director of the Cheyenne MPO AMPO PRESENTATION OCTOBER 2016 Tom Mason, Director of the Cheyenne MPO TMason@CheyenneMPO.org 307.637.6299 Darci Hendon, PE HendonD@AyresAssociates.com 307.634.9888 ext. 3593