Schedule and Priorities 2018 / 2019

Slides:



Advertisements
Similar presentations
Soft X-ray Self-Seeding
Advertisements

Hal Tompkins FEE/FEL June 16, FEE/FEL Commissioning Overview By Hal Tompkins Photon Beam Systems Deputy.
The BESSY Soft X-Ray SASE FEL (Free Electron Laser)
1 John Arthur 1 FEH Status CXI Review June 3, 2009 FEH Layout, Status John Arthur – LCLS Expt’l Facilities Div June 3, 2009.
October 30, 2007 Heinz-Dieter Nuhn, SLAC / LCLS Undulator Commissioning Plans 1 Undulator Commissioning Plans Heinz-Dieter Nuhn,
James Welch October 30, FEL Commissioning Plans J. Welch, et. al. FEL Commissioning Plans J. Welch, et. al. Accelerator.
Richard M. Bionta XTOD October 12, 2004 UCRL-PRES-XXXXX X Ray Transport, Optics, and Diagnostics, Overview Facility Advisory Committee.
1 Michael Rowen 1 SXR Instrument FAC SXR Instrument Michael Rowen – Engineering Physicist June 9, 2009.
John Arthur Photon October 12, Photon Systems Update John Arthur SLAC 1.
Hal Tompkins Photon October 30, LCLS Photon Systems Installation and Commissioning Presentation to Facility Advisory.
NOvA meeting PIP Update W. Pellico. PIP Goals and Scope (Provided in 2011 – Directorate S. H. / DOE Talk ) Goals: Specific to the issues surrounding the.
Status of LCLS A. Brachmann, SLAC National Accelerator Laboratory.
Impact on Project Planning and Cost. Agenda CERN Project Budget Planning Summary E. Gschwendtner, 9 April
Introduction Riko Wichmann, XFEL Project Office (XPO) XFEL Technical Reviews.
The Stripping Foil Test Stand in the Linac4 Transfer Line
Perspectives of imaging of single macromolecular complexes at the European XFEL Evgeny Saldin.
Updated Overview of Run II Upgrade Plan Beam Instrumentation Bob Webber Run II Luminosity Upgrade Review February 2004.
Lessons Learned From the First Operation of the LCLS for Users Presented by Josef Frisch For the LCLS March 14, 2010.
PAL-XFEL Commissioning Plan ver. 1.1, August 2015 PAL-XFEL Beam Dynamics Group.
Laser Line work package (WP6) AWAKE Technical Board meeting 19 May 2014.
ELENA installation progress F. Butin / ELENA collaboration.
LCLS Commissioning & Operations High Level Software
Jan 2016 Solar Lunar Data.
LCLS-II: An upgrade for the LINAC Coherent Light Source
LCLS efforts: Self-seeding -- status report
Introducing European XFEL Enlightening Science
LLRF'15 Workshop, Shanghai, Nov. 4, 2015
Tango status at Elettra
ART-Review Schedule, Strategies and Conclusion
Experimental Facilities Planning
Operation and Safety ART Review Harald Sinn.
Communication and Documentation Needs exemplified on WP 71
EuCARD2 proposal LLRF Optimization at FLASH
Eric Boyd SRP XHEXP1 Meeting 29,09,2017
LCLS Commissioning & Operations High Level Software
LCLS Instrument Development
LCLS-II-HE FEL Facility Overview
Appendix C New Administration General Assembly Session
Steps towards beam commissioning: Photon Diagnostics
Revised Commissioning Strategy


LCLS-II-HE FEL Facility Overview
VLA to EVLA Transition Plan
Laboratory Directed Research and Development (LDRD) Proposal
Non-user time 2/7 of total
Diagnostics overview and FB for the XFEL bunch compressors
Hal Tompkins – Photon Beam Systems Deputy June 8, 2009
CMX scope and functionalities
Advanced Research Electron Accelerator Laboratory
XFEL bunch compressors
John N. Galayda – Director of LCLS Construction March 30, 2009

Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
LCLS-II Cryoplant Controls Workshop.
Text for section 1 1 Text for section 2 2 Text for section 3 3
PIXEL Project Status John Arthur Photon Instrumentation for
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Hal Tompkins – Photon Beam Systems Deputy May 14, 2009
European XFEL Status Winni Decking, DESY
ThomX – Commissioning Meeting – 25/01/2018
Laser Und XFEL.EU Experiment
LCLS Instrument MIE Project: Staffing, Schedule
Change Management E2E Roadmap
Presentation transcript:

Schedule and Priorities 2018 / 2019

Current 2018 schedule

Scope 2018/19 / Order of priorities SASE1 tunnel operation SASE1 instrument operation SASE3 tunnel readiness  SASE3 tunnel operation SASE2 tunnel readiness  SASE2 tunnel operation SASE3 instrument readiness  SASE3 instr. operation SASE2 instrument readiness  SASE2 instr. Operation SASE1 tunnel & instrument completion SASE3 tunnel & instrument completion SASE2 tunnel & instrument completion

1. SASE1 tunnel operation Tasks & effort required to operate the tunnel: (including items for Day-1 or required to meet promises in Call for Proposals) Accelerator: Achieve >0.5 mJ and good pointing stability (matching our optics) Accelerator / XFEL: Improve undulator controls & adjustments / reduce losses Accelerator: Good understanding of the FEL gain curve (?) Accelerator: Working kicker magnets Accelerator / Diagnostics: Measurement of the spectral jitter and bandwidth Optics: Installation & commissioning of distribution mirror cooling Diagnostics Complete commissioning of MCP, Hirex, K-Mono (now 50%) (required for improvements of the accelerator) CAS & ITDM: Tunnel DAQ reliability / commissioning Vaccuum & CAS: Final implementation of vacuum controls. FXE: Installation & commissioning of diamond grating FXE: Commissioning of 4 bounce monochromator AE & SPB: Pulse picker has to be comissioned with beam SPB: Update attenuator foils

2. SASE1 instrument operation Tasks & efforts required to operate the instruments: (including items for Day-1 or required to meet promises in Call for Proposals) October: SPB: AGIPD (re)cabling works done, CSS, laser table & vacuum works partially done, … CAS: Exchange of data between DOOCS and Karabo: Established, currently testing and bugfixing. CAS: Improve Control Software: Scan tool being tested @ FXE, overall stability was increased. ITDM: Improve DAQ: Data storage and handling, detector performance waiting for opportunity to conduct high speed test (300/512 bunches) December: ITDM: Test of new storage system + expansion of InfiniBand network AE: Test of train builder (at least LPD) Accelerator & SPB/SFX: Improvement of the focal properties From beginning of 2018: SPB: KB-mirror installation, integration & commissioning

Achieve first lasing: 1st attempt in Nov. 17  Q1 2018 3. SASE3 tunnel readiness Achieve first lasing: 1st attempt in Nov. 17  Q1 2018 Diagnostics: XGM, FEL- & SR-Imager are (almost) ready for commissioning Vacuum: Vacuum in XTD10 up to absorber completely done Vacuum: Local test of vacuum system with controls, interlock etc. done General vacuum sector interlock test has still to be done Major works finished XTD4+10 : End of Jan. 18 Vacuum & Optics: Beam shutters, mirrors, soft X-ray Monochromators cabling was already started Diagnostics: MCP (30% inst. done), Pop-Ins, K-Mono (50%) Simultaneous operation of SASE1+3: End of Q1 2018 To be discussed with Acc. and incorporated into schedule

Achieve first lasing: 1st attempt in Mar. 18  Apr.-May 4. SASE2 tunnel readiness Achieve first lasing: 1st attempt in Mar. 18  Apr.-May Beam shutters, XGM, FEL-&SR-Imager, Vacuum in XTD1+6 up to XTD6 absorber Test of entire vacuum system, with controls, interlock etc. required Major works finished XTD1+6: Apr. 18  End of Q2 2018 Vacuum & Optics: Mirrors, Split&Delay Unit, High resolution monochromator, CRLs Diagnostics: 2nd XGM, MCP, Pop-Ins and other Imagers Simultaneous operation of SASE1+3+2: End of Q2 2018 To be discussed with Acc. and incorporated into schedule

5. SASE3 instrument readiness TGA AC ready until Feb. / Apr. 18, Elec. ready until Mar. 18 Instrument installation Major time of installation: Feb. – Apr. 18 Beckhoff electronics Cabling Phase II done until Jan.18 Day 1 hardware BH done until Feb. 18 Beckhoff electronics E2E done until Jul. 18 Instrument commissioning without beam Installation of Rad. Saf. Interlocks in Apr. 18 …

6. SASE2 instrument readiness TGA AC ready until Mar. / Apr. 18, Electricity ready until Apr. 18 Instrument installation Major time of installation: Q4 2017 - Q1 2018 AGIPD ready for installation in Feb. 18 Beckhoff electronics (MID / HED Opt. / HED) Cabling Phase II done until May / July / Sep. 18 Day 1 hardware BH done until Feb. / Mar. / June 18 Beckhoff electronics E2E done until Sep. 18 / Oct. 18 / Jan. 19 Instrument commissioning without beam Installation of Rad. Saf. Interlocks in July 18 Installation of Laser Interlocks ???

7. SASE1 tunnel & instrument completion … FXE: Jungfrau detector planning, cabling, integration & commissioning SPB/SFX: AGIPD4M detector planning, cabling, integration & commissioning Additional work regarding downstream region (day 2 / SFX)

8. SASE3 tunnel & instrument completion Undulators: Self-seeding, Circular polarization undulator, Helical afterburner Diagnostics: Full PES operation, Exit-Slit Imagers … SCS: SQS: Third experiment (TR-XPES):

9. SASE2 tunnel & instrument completion Undulators: Self-seeding, … Diagnostics: Hirex? … MID: HED / HIBEF-UC: (Third experiment:)