Dana Engineering, Inc., PSC UMCDF OPERATIONAL READINESS REVIEW

Slides:



Advertisements
Similar presentations
Session No. 4 Implementing the State’s Safety Programme Implementing Service Providers SMS
Advertisements

Organizational Governance
Metro Muncipal Agreement Program
Managing the Health and Safety of Contractors
Effective Contract Management Planning
COST CONTROLS OF CAPITAL COSTS THROUGHOUT THE DESIGN PHASE Presented by Planning & Management Services, Inc Federal Way, WA (near Seattle) Western Winter.
Core principles in the ASX CGC document. Which one do you think is the most important and least important? Presented by Casey Chan Ethics Governance &
More CMM Part Two : Details.
How a Large Company Used the Principles to Establish its Corporate Information Governance Robin Woolen, MBA, IGP President / Principal.
BIOMASS POWER PLANT Jo-Carroll Energy, Inc. (NFP).
© The McGraw-Hill Companies, Inc., 2008 McGraw-Hill/Irwin 1-1 Financial Accounting THIRTEENTH EDITION Williams Haka Bettner Carcello.
Environmental Management Systems An Overview With Practical Applications.
ANNUAL RISK MANAGEMENT DISCLOSURE REQUIREMENTS Public Sector Risk Management Forum Presenter: Risk Management Support | 28 August 2014.
Departmental Initiative to Enhance Activity-level Work Planning and Control DOE and DOE Contractors Industrial Hygiene Meeting in Conjunction with the.
Purpose of the Standards
TRU Waste Processing Center Culture and Successful Implementation of an ISO Certified Environmental Management System Presented at the DOE ISM Conference.
Chapter One Introduction to Managerial Accounting COPYRIGHT © 2012 Nelson Education Ltd.
Pre-Project Planning Lessons from the Construction Industry Institute Construction Industry Institute Michael Davis, P. Eng, PMP Ontario Power Generation.
Environmental Management Services
Session No. 3 ICAO Safety Management Standards ICAO SMS Framework
INFORMATION SECURITY GOVERNANCE (ISG) Relates to the security of information systems Is an element of corporate governance.
Fire Department Accreditation and Self Assessment Overview
PMP® Exam Preparation Course
D-1 McGraw-Hill/Irwin ©2005 by the McGraw-Hill Companies, Inc. All rights reserved. Module D Internal, Governmental, and Fraud Audits “I predict that audit.
ISM Workshop 1 Independent Oversight Perspectives Michael A. Kilpatrick Deputy Director Office of Security and Safety Performance Assurance.
CORPORATE COMPLIANCE Tim Timmons Vice President Compliance and Regulatory Services Health Future, LLC.
Nov Readiness Review Course Implementation Plan - Mod 8 Screening or Scoping Meeting (ORR vs RA, Authorization Authority (AA) Defined, Startup Notification.
1 DOE IMPLEMENTATION WORKSHOP ASSESSING MY EMS Steven R. Woodbury
Agency Risk Management & Internal Control Standards (ARMICS)
ISM at the Savannah River Site Department of Energy Best Practices Workshop Lesson Learned Program Bill Luce, Manager Regulatory Services Washington Savannah.
10/20/ The ISMS Compliance in 2009 GRC-ISMS Module for ISO Certification.
Holistic Approach to Security
Geoffrey L. Beausoleil Assistant Manager, Office of Operational Support DOE Idaho Operations Office September 12, 2006 Presentation to DOE ISM Champions.
© The McGraw-Hill Companies, Inc., 2008 McGraw-Hill/Irwin Principles of Accounting (Accounting 1 for BBA - Undergraduate) SBS Victor Yerris, PhD
Using ISMS Principles and Functions in Developing an ARRA Readiness Review Process Presented by Linda K. Rogers Assessments & Readiness Programs Manager.
ISM at the Savannah River Site Department of Energy Best Practices Workshop Facility Evaluation Board Steve Johnson, Manager Operations Evaluation Department.
Nuclear Security Culture William Tobey Workshop on Strengthening the Culture of Nuclear Safety and Security, Sao Paulo, Brazil August 25-26, 2014.
Copyright © 2013 by The McGraw-Hill Companies, Inc. All rights reserved.McGraw-Hill/Irwin.
International Atomic Energy Agency Roles and responsibilities for development of disposal facilities Phil Metcalf Workshop on Strategy and Methodologies.
OTC Pres Project Del P5 12/08 Page 1 Project Delivery Performance Improvement Report to the Oregon Transportation Commission Jeff Gower, State Construction.
APPROACH TO A FULLY INTEGRATED PERFORMANCE ASSURANCE SYSTEM Integrated Safety Management Summit Knoxville, TN August 24-27, 2009 Presented by: Gary Grant.
An Overview THE AUDIT PROCESS. MAJOR PHASES IN AN AUDIT Client acceptance and retention Establish terms of the engagement Plan the audit Consider internal.
Revision N° 11ICAO Safety Management Systems (SMS) Course01/01/08 Module N° 9 – SMS operation.
Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of McGraw-Hill Education.
ICAJ/PAB - Improving Compliance with International Standards on Auditing Planning an audit of financial statements 19 July 2014.
Vanguard For Army Transformation PM BCT 1 Predicting What the Future Holds Risk Management PM Brigade Combat Team.
The Lead Agency Council Sports Trust (Sport Otago) Cluster of clubs Interested parties / other.
California Department of Public Health California Department of Public Health Accreditation Readiness Team (ART) Orientation Office of Quality Performance.
Pipeline Safety Management Systems
TOP Practices in Post Award Administration
Lisa Hoebelheinrich, JD, CHRC Associate Vice Chancellor, Compliance
CPA Gilberto Rivera, VP Compliance and Operational Risk
The Readiness Review Process – Mod 2
Presented by Jean Fecteau OEO Fiscal Analyst
Chapter 10 Making it Stick.
THE GOVERNANCE OF CHANGE
Identify the Risk of Not Doing BA
Readiness Review Course
Role of the Board William St. John President & CEO 20/20 Foresight
Audit Planning and Analytical Procedures
The ORR/RA Pre-Visit and Other Prior Planning Items May 2005 Revision
Capital Asset Projects executed by the
A Framework for Control
By Jeff Burklo, Director
Safety Management System Implementation
Adding Value Across the Board
The Elements of appropriate Internal Controls
Internal Audit Who? What? When? How? Why? In brief . . .
Strategic Management and
Strategic Management and
Presentation transcript:

Dana Engineering, Inc., PSC UMCDF OPERATIONAL READINESS REVIEW Umatilla Chemical Disposal Facility www.DanaEngineering.com (509) 582-0126 By: William Dana, P.E.

Dana Engineering, Inc., PSC UMCDF OPERATIONAL READINESS REVIEW Dept of Army, Policy Statement # 28 “Preoperational Surveys and Operational Readiness Evaluations (ORE’s)” AMENDED POLICY More Active Contractor Role in Certifying the Facility Contractor Develop the Acceptance Criteria More Continuous Process over Time (ORR followed by RA’s) Government in “Oversight Role” Relative to the Contractor defined process www.DanaEngineering.com (509) 582-0126

Dana Engineering, Inc., PSC UMCDF OPERATIONAL READINESS REVIEW Policy Statement #28 Government Responsibilities Director, U.S. Army Chemical Materials Agency (CMA) Approval Authority for Initial Operations CMA Staff Offices- Provide Oversight Site Field Office- “ORR Oversight Plan” >90 Days, the Risk Management Directorate (RMD) Verifies System Readiness Prior to Restart www.DanaEngineering.com (509) 582-0126

Dana Engineering, Inc., PSC UMCDF OPERATIONAL READINESS REVIEW Policy Statement #28 New Contractor Responsibilities The Contractor develops ORR Plan ORR Board Chairman is a contractor employee Contractor Conducts Tests and Demonstrations Contractor Certifies Readiness (not D.O.D.) www.DanaEngineering.com (509) 582-0126

Dana Engineering, Inc., PSC UMCDF OPERATIONAL READINESS REVIEW Policy Statement #28 ORR Board Members: -Sys. Contractor -Regulatory Field Office -Stakeholders - and - Consultants Determine Schedule of Startup Activities (not PM) Approve Objectives and Criteria Formal Board Meetings & Documented Decisions Board certifies Readiness To: Program Mgr for Elimination of Chemical Weapons PM-ECW Findings Categorized: as 1,2,3,or 4 of significance “Senior” ORR Board Members can “Rock the Boat” www.DanaEngineering.com (509) 582-0126

Dana Engineering, Inc., PSC UMCDF OPERATIONAL READINESS REVIEW Policy Statement #28 (ORR Plans) The System Contractor Prepares: ORR Program Plan (069) ORR Campaign Plans (Operations) (068) Objectives and Criteria Readiness Assessment Plans (RA) – which enhance the ORR Campaign Plan(s) Readiness Assessment Checklists (RACK) Integrated Operations Demonstrations (IOD’s) – system desk instruction, checklists & report forms www.DanaEngineering.com (509) 582-0126

Dana Engineering, Inc., PSC UMCDF OPERATIONAL READINESS REVIEW D.O.D. ORR BOARD MEMBERS QUOTES: UMCDF ORR Process was a “Breath of Fresh Air” “No Substitute for a ORR Readiness Manager who is: Aware of Status at all times (good tracking systems) “Stick to the Process” & “Do it Right” Excellent Readiness Manager is absolutely essential Readiness Manager must report to God (Plant Manager) & NOT to other Lower Managers or Vice Presidents Get to the Bottom of the Issues (especially if somebody has “bad breath”) The Emphasis is on “Personal Accountability” www.DanaEngineering.com (509) 582-0126

Dana Engineering, Inc., PSC UMCDF OPERATIONAL READINESS REVIEW D.O.D. ORR BOARD MEMBERS QUOTES: D.O.D. ORR is “big picture” organizational review D.O.D. Readiness Assessments done on individual evolutions Objectives and Criteria must be: Consistent & Not Redundant (avoidance of “Motherhood” criteria like in 425.1) D.O.D. ORR Process was single level (“neat, clean, simple”) [as contrasted to (Contractor + D.O.E.) double ORR’s. The D.O.D-ORR is done by the the System Contractor & “Oversight” done by Regulatory Authority] Biggest Criticism: “In a double layered process the Contractor spends too much Time & Money, so they “don’t get second guessed by D.O.E.” www.DanaEngineering.com (509) 582-0126

Dana Engineering, Inc., PSC UMCDF OPERATIONAL READINESS REVIEW D.O.D. ORR BOARD MEMBERS QUOTES: “Good oversight by D.O.E. should give D.O.E. the assurance that the Contractor’s ORR process will prevent D.O.E. from finding significant issues”. “The D.O.D. ORR process eliminates the need for a secondary government ORR” “D.O.D. ORR demands performance from the Contractor”. “Trust the Contractor” and make him Accountable www.DanaEngineering.com (509) 582-0126

Dana Engineering, Inc., PSC UMCDF OPERATIONAL READINESS REVIEW UMCDF ORR PROGRAM PLAN DIFFERENCES NOTE: Similarities include CRADS, Findings, Affidavits D.O.D. Criteria basis: Lessons learned, Other sites, Pol. 28 D.O.D. ORR’s- broad functional areas & processes D.O.D. Readiness Assessments (RA) for critical systems ORR also Re-visits RA identified weaknesses Readiness Assessment Checklist (RACK) for low risk systems readiness reviews (formal ORR or RA not required) D.O.D. Objectives and criteria are specific to the facility The Contractor declares readiness & prepares the report. The Regulator authorizes Startup www.DanaEngineering.com (509) 582-0126

Dana Engineering, Inc., PSC UMCDF OPERATIONAL READINESS REVIEW UMCDF ORR CAMPAIGN PLAN DIFFERENCES 5 Phases of ORR were developed in the ORR Campaign Plan to coincide with an aggressive achievable schedule Mini-reports were prepared at the end of each phase www.DanaEngineering.com (509) 582-0126

Dana Engineering, Inc., PSC UMCDF OPERATIONAL READINESS REVIEW SUMMARY OF D.O.D. MAJOR DIFFERENCES D.O.D. ORR a Continuous Process A D.O.D. Contractor “Quality” ORR till it is right No redundant D.O.D. ORR (Oversight only) Readiness Manager reports to God ORR Board is firmly in control of the processes Readiness Assessment Checklists (RACK) for low-risk systems Emphasis on department managers personal accountability D.O.D. ORR is “Big Picture” plus: RA’s are done on “Systems” Affidavit criteria is targeted to the Facility Phased mini-ORR’s follow Facility Organizational Maturity www.DanaEngineering.com (509) 582-0126

Dana Engineering, Inc., PSC UMCDF OPERATIONAL READINESS REVIEW Umatilla Chemical Disposal Facility Construction Photo Dana Engineering, Inc. is an independent and highly experienced Engineering and Operational Readiness Review Professional Service Corporation. We also specialize in Root Cause Analysis investigations and organizational Value Mapping processes. www.DanaEngineering.com