I-84 Waterbury Project Project Overview July 2017.

Slides:



Advertisements
Similar presentations
Capital Beltway HOT Lanes Project Project Update March 2009.
Advertisements

The presentation will follow this format:
March 1, Why an interchange at this location? TH 15 Corridor Study 2007 Nine Signalized intersections Six in Top 50 High Crash Cost Study outcome.
Pedestrian Considerations in Work Zones… St. Peter Main Street Reconstruct.
Grade Separation Alternative
Route 50 Widening Design/Build Project. 2  Virginia Department of Transportation  Shirley Contracting Company  Dewberry  Fairfax and Loudoun Counties.
6 th Street Water Main And Street Reconstruction 2013.
Capilano Road Improvement Project WELCOME TO THE OPEN HOUSE.
75 Express Lanes Segment D Construction From South of Sheridan Street to North of Griffin Road Presentation to Ivanhoe Community August 27, 2014.
S.R. 256 Road Reconstruction Project From City of Austin to S.R. 203 Thursday, February 6, 2014 Austin Elementary School 6:00 p.m.
WTBA/ WisDOT Contractor /Engineer Conference January 21 and 22, 2009 Local Government Involvement on WisDOT Projects Craig J. Treadway, P.E., NE Region.
Two Point Perspective Directions Follow the power point through the steps to complete each perspective problem. Look for the lines that are blue for the.
In association with: THOMAS ROAD STREETSCAPE 73 RD STREET TO HAYDEN ROAD PROJECT NO. T0606 City of Scottsdale.
Instructions for using this template. Remember this is Jeopardy, so where I have written “Answer” this is the prompt the students will see, and where.
May 13 th, 2014 Portage County, Ohio Tallmadge Road Corridor and Interchange Improvement Project.
Exit Quiz Road Signs Recognition
New Mississippi River Bridge EWGCOG Presentation New Mississippi River Bridge EWGCOG Presentation January 8, 2007.
Poplar Street Bridge City Arch River Consultant Presentation December 16, 2011 Room 160, St. Louis District Office.
Schools Jobs Revenues Services Recreation Environment Transportation Transportation Connectivity Housing Public Safety Pontiac’s.
WVDOT GTI SECTION Status Update for Miss Utility.
Environmental Assessment Public Information Meeting – September 2010 Realignment of a Portion of a Utah Lake Drainage Basin Water Delivery System (ULS)
Road To Success US 41 WIS 441 Tri-County. Road To Success DBE Workshop and Secretary’s Golden Shovel Awards February 18, 2015.
Page Avenue What has it done for the region? A comparison of traffic volumes from Fall 2003 to Fall 2004 What has it done for the region? A comparison.
Interstate 435 and Front Street Interchange Improvements This presentation will probably involve audience discussion, which will create action items. Use.
Alameda Creek Bridge Replacement Scoping Meeting March 4, 2014.
Nick Johnson, PE Senior Project Manager October 1, 2012.
ILLINOIS ROUTE 23 (LaSalle St.) DOWNTOWN RE-ALIGNMENT December 2, 2008.
Route 1 Project Study Report Overview. A report that describes the transportation problem and identifies the project scope, schedule and estimated cost.
DRAFT 1 Significant Changes for the 2006 Constrained Long-Range Plan March 3, 2006.
Street Design Construction White Bear Avenue Reconstruction Jesse Farrell, P.E &
1 MD 5 (Point Lookout Road) Leonardtown (Phase 1) Intersection Reconstruction At Abell and Moakley Streets Informational Meeting January 19, 2016.
Safety Signs. Traffic Light Ahead Slow down and prepare to stop.
Traffic Signs Part Two. What do these 2 signs tell you?
I-80 San Pablo Dam Road Interchange Project – Phase 1.
Test Site Spirio Rd Left Turn #1 Scored Right Turn #1 Scored Right Turn #2 Scored Right Turn #3 at Stop Light, Scored.
Scranton/Carter Road Reconstruction
The I-465 West Leg Reconstruction Project
S.R. 44 Corridor Management Plan S.R. 44 Corridor Management Plan
I-15 North Phase 4 Scoping & Project Management Assistance
MnDOT PROJECT UPDATE Trunk Highway 169 Improvements Fall 2016 – Fall 2017 Mayor & Council Members - Thank you for giving us this opportunity to give.
Interstate 15 North Phase 4 Cost Estimates 09/03/2015
Interstate 15 North Phase 4
2017 Reconstruction of Northfield Street
I-15 North Phase 4 Scoping & Project Management Assistance
Infrastructure Investment Needs
Jeffrey Keirn Illinois Department of Transportation
Stark St Beaver Creek Culvert Project Updates
IA 122 RECONSTRUCTION PRE-BID MEETING
US26: Cornelius Pass Rd -185th Ave
Highway 169 Bridge Replacement & Pavement Resurfacing
I-69 Southwest/I-610 West Loop Interchange Reconstruction
CH 42 & TH 13 Construction Update
SR422 Section 29M, Berks Co. West Shore Bypass Reconstruction
STATE SUEE AND ONE WAY CORRIDORS
I-295/Malcolm X Avenue Interchange Improvement Project
Paris & DALLAS DISTRICT corridor PROJECTs update
Contract 60X10 Informational Meeting Weber I-55
West Hills Road Projects Update
Capital Budget Presentation
One Point & Two Point Perspective
Protected Bicycle Lanes Finally Pedal Their Way to KC…
Design Standards.
Signs and Markings Pop Quiz
Commissioners Presentation
Road Signs.
Metropolitan District | mndot.gov
Access Hatch Replacement Phase 4
Spring field Airport to Fort Leonard Wood
Ron Hancock, PE NCDOT State Construction Engineer
Presentation transcript:

I-84 Waterbury Project Project Overview July 2017

I-84 Waterbury Project Team Lochner AECOM AI Engineers, Inc. Comprehensive Environmental, Inc. Louis Berger I-84 Constructors, J. V.

Project Overview 8 Highway Bridges One Pedestrian Bridge 7 Culverts (4 Over Watercourses) One Pedestrian Bridge (Over the Mad River) 7 Culverts 20 Retaining Walls Replacing/Upgrading Traffic Signals New Highway Illumination, Signs and Pavement Markings Replacing/Relocating Sanitary Sewer, Potable Water and Other Utilities

Project Description 2.7 Miles of Highway Reconstruction to Provide a Continuous Third Lane from Washington Street to Pierpont Road Washington Street Pierpont Road Hamilton Ave. Interchange East Main St. Harpers Ferry Rd. Plank Rd. Click – realignment of highway in the vicinity of Harpers Ferry Road to remove existing sharp ‘S’ curve Click – interchange ramp configuration Click – State and local road reconstruction Click – relocation of Mad River and Beaver Pond Brook Plank Rd. East Scott Rd. Hamilton Ave. Scott Rd. Interchange Realignment of I-84 Harpers Ferry Rd. Interchange Reidville Dr.

Project Description 2.7 Miles of Highway Reconstruction to Provide a Continuous Third Lane Including Realignment of I-84 to Remove Existing “S” Curve Washington Street Pierpont Road Hamilton Ave. Interchange Click – realignment of highway in the vicinity of Harpers Ferry Road to remove existing sharp ‘S’ curve Click – interchange ramp configuration Click – State and local road reconstruction Click – relocation of Mad River and Beaver Pond Brook Original Alignment of I-84 Realignment of I-84 Scott Rd. Interchange Harpers Ferry Rd. Interchange

Project Description Relocation of Mad River and Beaver Pond Brook Washington Street Pierpont Road Hamilton Ave. Interchange East Main St. Click – realignment of highway in the vicinity of Harpers Ferry Road to remove existing sharp ‘S’ curve Click – interchange ramp configuration Click – State and local road reconstruction Click – relocation of Mad River and Beaver Pond Brook Beaver Pond Brook Hamilton Ave. Scott Rd. Interchange Mad River Harpers Ferry Rd. Interchange Reidville Dr.

Project Description Interchange Ramp Configuration Washington Street Pierpont Road Hamilton Ave. Interchange Harpers Ferry Rd. Click – realignment of highway in the vicinity of Harpers Ferry Road to remove existing sharp ‘S’ curve Click – interchange ramp configuration Click – State and local road reconstruction Click – relocation of Mad River and Beaver Pond Brook Scott Rd. Hamilton Ave. Scott Rd. Interchange Harpers Ferry Rd. Interchange

Project Description State and Local Road Reconstruction Washington Street Pierpont Road East Main St. Harpers Ferry Rd. Plank Rd. Click – realignment of highway in the vicinity of Harpers Ferry Road to remove existing sharp ‘S’ curve Click – interchange ramp configuration Click – State and local road reconstruction Click – relocation of Mad River and Beaver Pond Brook Plank Road East Hamilton Ave. Scott Rd. Reidville Dr.

Realigning I-84 Existing “S” Curve Future EB 25 Off Ramp Bridges – Blue boxes are links to each bridge To return to this slide after viewing a bridge click on the Bridges box below the H button in the top right Future I-84 Alignment

8 New Highway Bridges Bridge 1228 Scott Road over I-84 Bridge 6591 New EB 25 On Ramp Bridge 5774 Future I-84 over Mad River eastern crossing Bridge 1226 Harpers Ferry Rd. over I-84 Bridge 6284 EB 25 Off Ramp over Mad River Bridge 1224 I-84 over Mad River western crossing Bridges – Blue boxes are links to each bridge To return to this slide after viewing a bridge click on the Bridges box below the H button in the top right Bridge 6590 New WB 25 On Ramp Bridge 04321 Hamilton Ave. over I-84

1 New Pedestrian Bridge Bridge 1228 Scott Road over I-84 Bridge 6591 New EB 25 On Ramp Bridge 5774 Future I-84 over Mad River eastern crossing Bridge 1226 Harpers Ferry Rd. over I-84 Bridge 6284 EB 25 Off Ramp over Mad River Bridge 1224 I-84 over Mad River western crossing Pedestrian Bridge Over Mad River Bridges – Blue boxes are links to each bridge To return to this slide after viewing a bridge click on the Bridges box below the H button in the top right Bridge 6590 New WB 25 On Ramp Bridge 04321 Hamilton Ave. over I-84

Website: I-84waterbury.com Phone: 203-725-3089 Email: info@i-84waterbury.com