2. SCRF General Preparation for the AD&I Preparation for AAP Review

Slides:



Advertisements
Similar presentations
E. KAKO (KEK) 2010' Sept. 10 KEK Global Design Effort 1 Operational Results from STF-VTS and Cryomodule Tests at KEK Eiji Kako (KEK, Japan)
Advertisements

SCRF Cavity R&D Goal and ILC Operational Gradient Akira Yamamoto: Prepared for discussions at Cavity Webex Meeting, July 20, , A. Yamamoto1SCRF.
April SCRF Meeting FNAL08 S.Fukuda 1 HLRF Summary and Work Assignment S. FUKUDA KEK.
Progress of ILC cavity gradient database and yield C.M. Ginsburg On behalf of the ILC Database Group Baseline Assessment Workshop, Tsukuba/WebEx September.
Superconducting Accelerating Cryo-Module Tests at DESY International Workshop on Linear Colliders 2010 (ECFA-CLIC-ILC Joint Meeting) Denis Kostin, MHF-SL,
Dark Current Measurements and Simulations Chris Adolphsen 2/4/15.
ILC PM Meeting S0 Webex Global Design Effort 1 S0/S1 Next Steps Lutz Lilje GDE.
September 29, 2009LCWA09 GDE Plenary (M Ross) Linear Collider Workshop of the Americas: ‘LCWA09’ Meeting Goals: –R & D, –Engineering Design, –Accelerator.
Cavity Gradient Yield Plots Update, August, 2009 As reported by Akira Yamamoto to the EC and the ILCSC August, 13, 2009 On behalf of the ILC Cavity Global.
Akira Yamamoto Project Manager, SCRF To be presented, April 19, 2009 AAP Review – SCRF Introduction AAP-SCRF-Introduction.
Jim Kerby, Fermilab for Rongli Geng and the S0 Cavity Team 23 May 2010 Current Status of SCRF Cavity Development SCRF Cavity Technology and Industrialization.
Cavity Yield Re-Evaluation Plan C.M. Ginsburg (Fermilab) July 10, 2009 (Essentially a copy of presentation June 24, 2009 to SCRF-ML WebEx meeting with.
E. KAKO (KEK) 2009' Dec. 22 S1-G Webex meeting Global Design Effort 1 Final Results of KEK Cavities for S1-Global Eiji Kako (KEK, Japan)
SCRF Monthly WebEx Meeting June 30, 2010 Agenda 1.Report from PMs (5 min.) 2.General Report from Group Leaders(15 min.) 3.Special Discussions 1.TDP R&D.
Update on Global Cavity Database and Yield Evaluation DESY Database Group: D. Gall (DESY) V. Gubarev (DESY) S. Yasar (DESY) 28.Mar.2010Yamamoto/Ginsburg.
Akira Yamamoto Project Manager, SCRF To be presented, April 19, 2009 AAP Review – SCRF Summary and Discussion AAP-SCRF-Summary.
SCRF Monthly WebEx Meeting Agenda 1. Report from PMs (15 min.) 2. Report from GLs (10 min.) 1. Progress Reports and Discussions: TOPIX (each.
Cavity Gradient for the R&D and ILC Operation Akira Yamamoto ILC-GDE SCRF Presented at the AD&I meeting held at DESY, Dec. 2-3, 2009 A, Yamamoto,
R.L. Geng, KEK September 9, 2010 Global Design Effort 1 Near Term ILC Gradient R&D R&D Specification and Standardization Gradient Gradient Yield/Scatter.
AAP Review on SCRF to be prepared Akira Yamamoto, Marc Ross, and Nick Walker ILC-GDE Project Managers To be presented at ILC-10, Beijing, March 26, 2010.
ML Planning for ILC08 First Pass + SCRF agenda Chris Adolphsen Hitoshi Hayano.
Cavity status; recent KEK activities : Hayano (1)STF CM-1 cavities are; MHI MV/m for CM-1 ILC cryomodule (3-rd VT) MHI MV/m for.
ILC-BAW1 ML Accelerator Operational Gradient Introduction Akira Yamamoto, Marc Ross and Nick Walker GDE Project Managers Reported at BAW1, held at KEK,
Fermilab 2 Dec 2009CM Ginsburg Global Cavity Database Report C.M. Ginsburg (Fermilab) On behalf of the database group (as part of S0 effort):
Harry Carter – LCFOA Meeting 5/1/06 1 LCFOA Technical Briefings: Cryomodules H. Carter Fermilab Technical Division.
1.Report from PMs 2.Report from GLs 3.Special report and discussions 1.SCRF report at AAP and response from AAP (C. Ginsburg, R. Geng) 2.S1-Global assembly.
Cavity Database Status J. Kerby with thanks to the Cavity Database Team MLSCRF Webex 9 Dec 2009.
A Satellite Meeting at IPAC-2010 SCRF Cavity Technology and Industrialization Date : May 23, 2010, a full-day meeting, prior to IPAC-2010 Place: Int. Conf.
Cavity Yield Re-Evaluation Plan C.M. Ginsburg (Fermilab) June 24, 2009.
ILC Cavity Gradient R&D Plan Proposal for Release 5 Rongli Geng for ILC Cavity Group 2jun2010 ILC SCRF WebEx Meeting 6/2/20101ILC SCRF WebEx Meeting.
TILC09 SCRF Session Global Design Effort 1 EU Status TILC09 SCRF Session Lutz Lilje DESY.
(1)[12~13/Dec/2009] Optical inspection (2)[14/Dec] frequency & field flatness measurement (3)[10/Mar/2010] pre-EP (5μm) (4)[11/Mar] EP1 (100μm) (5)[11/Mar]
E. KAKO (KEK) 2009' Oct. 26 ILC KEK Global Design Effort 1 Cavity Preparation for S1-Global Eiji Kako (KEK, Japan)
Rolf Lange DESY ILC Workshop 1-June-07 XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser Module Industrialisation for XFEL How to proceed.
ILC Accelerator Operational Gradient Akira Yamamoto: SCRF Webex Meeting, July 28, , A. Yamamoto1SCRF Cavity Meeting.
SCRF Cavity WebEx Meeting May 17, 2010 Reports from PM (10 min.) – Brief report from ILC-PAC – Industrialization workshop as IPAC satellite meeting, Kyoto,
23-April-13 ECFA LC2013 Global Design Effort 1 Barry Barish ECFA LC2013 DESY Hamburg, Germany 27-May-13 GDE The path to a TDR.
Progress and Plans for R&D and the Conceptual Design of the ILC Main Linacs H. Hayano, KEK PAC2005 5/18/2005.
2 nd Workshop of the IHEP 1.3 GHz SRF R&D Project and 2nd IHEP-KEK 1.3 GHz SRF Meeting Opening Remark J. Gao December 2-3, 2009, IHEP, Beijing, China.
Summary of SCRF Meeting Fermilab, April 21-25, 2008 April 25, 2008 General Summary and Further Plan: 4/21: Cavity: Gradient R&D, performance, diagnostics.
ILC Gradient R&D Rongli Geng Jefferson Lab ILC Main Linac WebEx Meeting July 28, 2010.
CFS / Global – 09 June, 2010 PM Report: SB2009: –4 two-day workshops form the core of ‘TOP LEVEL CHANGE CONTROL’ –  as advised by AAP, PAC and etc –Written.
Nan Phinney SLAC ILC Worldwide Event, Fermilab, June 12, 2013 (Many slides courtesy of Marc Ross, Akira Yamamoto, Barry Barish) ILC Accelerator A 25-year.
Start of S2 Milestone Work H. Padamsee. Intro At KEK S2 meeting we decided to make a list of milestones and eventually cost S2 activities I tried to start.
SCRF Monthly WebEx Meeting March 9, Report from PMs (15 min.) 1.Acknowledgements for completing S1-Global cold/RF test (A. Y.) 2.GDE meeting plan.
PM Report CFS /Gbl ILC PAC (19-20 May) Agenda: –Akira, Rongli, Hitoshi H, Marc, Nick, Toshiaki, Mark P., Peter G. –Nick will report on Design.
SCRF: Monthly WebEx Meeting Oct., 19, 2011
Rongli Geng ILC Cavity Group Meeting October 25, 2011
SCRF WebEx Monthly Meeting Agenda and Reports from PM
SCRF Monthly WebEx Meeting May 6, 2010
ILC10 Beijing Global Design Effort
Cavity Gradient R&D Status and Future Plans for TDP-2
Rongli Geng Jefferson Lab & GDE
SCRF Monthly WebEx Meeting Sept. 22, 2010
for the FNAL/ANL, JLab, and Cornell cavity teams
Evolving an ILC focused SCRF Facility from the XFEL Infrastructure
SCRF Monthly WebEx Meeting May 20, 2009
S1-G cryomodule assembly status
European-XFEL summary: Cavities/Modules performance
SCRF Monthly WebEx Meeting Jan. 12, 2010
BAW Prep S1 Global Status Pilot Plant Status
Yamamoto WG3: ML-SCRF Parallel Session,
WG3: Main Linac SCRF(cavity,cryomodule)
Highlights from EU Global Design Effort
Matthias Liepe Zachary Conway CLASSE, Cornell University June 1, 2009
Nick Walker (DESY) EU GDE Meeting Oxford
Barry Barish JSPS - Sendai 12-Sept-11
Retreatment of Superconducting Cavities for the European XFEL
Barry Barish Paris ICHEP 24-July-10
Summary of the maximum SCRF voltage in XFEL
Presentation transcript:

2. SCRF General Preparation for the AD&I Preparation for AAP Review SB2009 document, and DESY meeting, Dec. 2-3, Cavity gradient (operational) to be re-evaluated by Quarter-1, 2009 Preparation for AAP Review at Oxford, Jan. 6-8, 2010, Next SCRF meeting Dec. 9, 2009: last meeting before SB2009, AAP A. Yamamoto 09.11.11 SCRF WebEx meeting

Global Plan for SCRF R&D Year 07 2008 2009 2010 2011 2012 Phase TDP-1 TDP-2 Cavity Gradient in v. test to reach 35 MV/m  Yield 50%  Yield 90% Cavity-string to reach 31.5 MV/m, with one-cryomodule Global effort for string assembly and test (DESY, FNAL, INFN, KEK) System Test with beam acceleration FLASH (DESY) , NML (FNAL) STF2 (KEK, extend beyond 2012) Preparation for Industrialization Production Technology R&D A. Yamamoto 09.11.11 SCRF WebEx meeting

New Production Yield after 1st and 2nd Pass (RF) Test Yield at 35 MV/m: 22 % at 1st pass 33 % at up to 2nd pass 1st pass 2nd pass improvement degradation ILC Operation at <31.5 MV/m> Yield reaching ~ 40 % Reported by C. Ginsburg and GDB team A. Yamamoto 09.11.11 SCRF WebEx meeting

Alternate Yield Plot SCRF WebEx meeting Yield is estimated assuming a specific lower cut-off in cavity performance, below which cavities are assumed 'rejected’. Error bar is +/- one RMS value (standard deviation of the population) of the remaining (accepted) cavities (gradient above cut-off). Additional bars (min, max) inidcated the minimum and maximum gradients in the remaining (accepted) cavities. A. Yamamoto 09.11.11 SCRF WebEx meeting

Progress and Prospect of Cavity Gradient Yield Statistics PAC-09 Last/Best 2009-05 FALC 1st Pass 2009-07 ALCPG 2nd Pass 2009-10 To be added (2009-11) Coming Prod. Y. (2010-06) Research cavities DESY 9 (AC) 16 (ZA) 8 (AC) 7 (ZA) 14 (AC/ZA) 10 (Prod-4) 5 8 (large G.) JLAB FNAL/ANL/Cornell 4 (AE) 1 (KE-LL5) 1 (JL-2) 7 (AC) ~ 5 (AE) 12 (AC) 6 (AE) 6 (NW) (including large-G) KEK/IHEP 5 (MH) 2 (MH) ~5 (LL) 1 (IHEP) Sum 39 22 21 20 25 ~ 20 G-Sum 41 66 Statistics for Production Yield in Progress to reach > 60, within TDP-1. We may need to have separate statistics for ‘production’ and for ‘research’, A. Yamamoto 09.11.11 SCRF WebEx meeting

Cavity Gradient Study - Status Yield at 35 MV/m (w/ established vendors: RI, Zanon) 22 % at 1st pass (statistics 22) 33 % at 2nd pass (statistics 21, as of 2009-07)) Average Gradient reaching 30 MV/m DESY Prod-4 data to be added, (10 more statistics) New statistics coming (w/ potential vendors) AES: to be counted from #5 (to be confirmed) MHI: to be counted from #5 (to be confirmed) Selecting statistics needed for ‘Production Yield’ to evaluate readiness of industrialization and cost Note: Numbers of Cavities for ‘gradient research’: need to be separately counted. A. Yamamoto 09.11.11 SCRF WebEx meeting

AES-JLAB/FNAL Progress Reported by R. Geng A. Yamamoto 09.11.11 SCRF WebEx meeting

Achievement with Contribution of basic R&D for surface conditions 洗浄 Possible reasons for improvement: ・Water rinsing (increased flow rate, time) ・Detergent rinsing. ・EP solution condition (aged). A. Yamamoto 09.11.11 SCRF WebEx meeting

S1 Goal: Achieved at DESY/XFEL Average field gradient at CMTB : > 31.5 MV/m - First XFEL prototype module exceeds 31.5 MV/m average - Module will see beam in FLASH in 2010 (av. of 30MV/m) - Cryostat (cryomodule cold-mass) contributed by IHEP A. Yamamoto 09.11.11 SCRF WebEx meeting

A Proposal for Re-baseline Cavity Gradient and Yield, in TDP-2 S0: Maximum gradient of 35 MV/m (@ Q0 = 8E9) in vert. test Keep R&D goal: yield of 90 % at 35 MV/m, and Recognize that the yield may be acceptable to be ~ 50 % with the +/-20 % distribution (i. e., b/w 28 and 42 MV/m) of the gradient. S1: Cavity-string: E = <31.5 MV/m> (@ Q0 = 1E10) in cryomodule Keep the ‘averaged field gradient’ in cryomodule string, and Recognize Acceptable gradient spread of ~ 20 % in operation See the recent progress at DESY PXFEL cryomodule test result S2: Cryomodule string w/ RF operationability Need to re-evaluate the level of operational margin to be required in accelerator beam operation, It may need to take into account to determine the ILC operational field gradient, (>> we need to discuss it) A. Yamamoto 09.11.11 SCRF WebEx meeting