AARNA Progress Report-June 2017 MAHENDRA HOMES PVT LTD. AARNA Progress Report-June 2017
T1-T2 Block-B up to Terrace Tower-1,2 Block-B T1-T2 Block-B up to Terrace
CLUB HOUSE -Tower-1,2 Block-A ,Block B Club house Terrace floor , Swimming Fool
Tower-B block-B1 Block B1-North Elevation Bock-B1 West Elevation Bock-B1 East Elevation Block B1-South Elevation
B2-South Elevation B2-East Elevation B2-West Elevation B2-West side Tower-2 Block-B2 B2-South Elevation B2-East Elevation B2-West Elevation B2-West side
Tower-1 Block-A A1 Up to terrace Floor
TOWER-1 BLOCK A Bock-A1 West Elevation Bock-A1 North Elevation
Block –A Middle Podium Block A Middle Podium Column Footing concreting Work in progress
TOWER-2 BLOCK A Tower-2 Block A 4rd Floor roof pour-2 shuttering & Reinforcement work in progress
TOWER-2 BLOCK A Tower-2 Block A up to 5th Floor
TOWER -1&2 BLOCK- A ,BLOCK -B OVER VIEW