LIU Wire Scanner Series Costs

Slides:



Advertisements
Similar presentations
IEFC Workshop – 22/03/2011 JJ Gras on behalf of BE-BI 1.
Advertisements

TE-MPE-EM Costing Betty Magnin 29/11/ Costing History Operational budgets Invoicing Cost balancing over fiscal year 2 29/11/2012.
Multi-Turn Extraction / L.Ducimetière / Kicker options for MTE Prepared by L.Ducimetière, L.Sermeus Outline: Reminder : Present MTE dedicated.
PSB extraction and transfer kickers 01/10/2014 LIU-PS ABT review1 L. Ducimetière, L. Sermeus.
SPS New Wire Scanner Mechanics Review
AWAKE RF Synchronization and LLRF Budget Review Reported by Wolfgang Hofle Acknowledgement: A. Butterworth, H. Damerau, S. Doebbert, J. Molendijk, S. Rey.
Impact on Project Planning and Cost. Agenda CERN Project Budget Planning Summary E. Gschwendtner, 9 April
HIE-ISOLDE contribution packages M. Pasini BE/RF.
17.March.2005 C. A. Martins, CERN AB/PO 1 Power converter for the TT2 mercury target project by Carlos DE ALMEIDA MARTINS (AB/PO)
ATLAS Endcap Muon System WBS 3.5 Frank Taylor MIT M&O Request FY06 Toronto August 3, 2005 V1.1.
F. Savary. Click here to add footer 2 Outline Context Constraints & Boundary conditions Project plan Production strategy A few words on QA Conclusions.
The Construction of the LHC Detector Gas Systems ? Ferdi Hahn PH-TA1-GS Detector Steering Meeting 4th of June 2004.
Financial Matters Ferdinand HAHN. Content Short Reminder: Definition of Maintenance and Operation Fund (MOF) in the MoU MOF in 2011 (Budget – Contributions.
BWSRE, B.Dehning 1 Bernd Dehning CERN BE-BI
Assembly Organisation and Duration. Work Site Organisation STORAGE SMA18 UNLOADING CLEAN ROOM CERN-SITE CLEANING MANUFACTURE DIRTY TRIAL ASSEMBLY ISO7.
NEW FAST WIRE SCANNER Manufacturing review Emilien Rigutto
LIU-ABT systems: SPS B.Balhan, J.Borburgh, H.Day 20 th November 2015.
Next Steps, Priorities, Strategy for Spares Ray Veness.
ABT LIU Project Review 2015 BI.KSW: Magnet November 20 th 2015 L. Feliciano TE/ABT.
High Order Mode Suppressors (HOMS) for SPS TWC200 (Sébastien Calvo, David Bastard) 25 November 2015 LIU-SPS Coordination Meeting.
Thermosiphon project management and quality assurance EN/CV/DC Presentation done by Elena Perez Rodriguez For further information contact
RRB scrutiny Report: Muons. Internal scrutiny group for RRB report Internal scrutiny group composition – J. Shank, G. Mikenberg, F. Taylor, H. Kroha,
Beam Wire Scanner for PS/SPS/PSB Mechanical 3D Model Review (for BE/RF-ABP Impedance meeting 02.Nov.2015) Dmitry Gudkov Mechanical Engineer BE/BI-ML.
CMS Upgrade Workshop, FNAL, Oct 28-30, O.Prokofiev Update ME4/2 Chambers and Tooling A construction of new ME4/2 prototype at CERN Factory tooling,
Status of Contributions, Draft Budget Request for 2005 and Outlook for the Longer Term Future Martyn Davenport 8 TH October 2004 CAST FRC-D
18, 19, 20 February 2002 Power Converters for magnets (PBS 1.2.3) R. GENAND SL/PO 1 Power Converters for Magnets –Introduction –Specification Magnet characteristics.
PSB Reference Magnet (for the 2.0 GeV upgrade) A.Newborough 16 th October 2014.
Brief Status of LHC Experimental Vacuum Project Ray Veness CERN TE/VSC.
ECR - PSB: New KSW magnet in 16L1 Luis Feliciano, 4 th February.
Beam Wire Scanner for PS/SPS/PSB Current status and Schedule Dmitry Gudkov BE-BI-ML.
Service Agreements Emmanuel Tsesmelis CERN / TS-LEA RRB Scrutiny Group 31 August 2006.
Beam Wire Scanner for PS/SPS/PSB Motor Selection Dmitry Gudkov BE-BI-ML.
TCDI Project Budget Update François-Xavier Nuiry May 10 th 2015 EN-STI-TCD.
Cost and schedule for ELENA Beam Transfer Systems W. Bartmann, J. Borburgh, E. Carlier, L. Ducimetiere, T. Fowler, M. Hourican, R. Ostojic, L. Sermeus.
PSB extraction and transfer kickers LIU TE-ABT review, 20 November L. Sermeus.
Wim Weterings Remy Noulibos
Vacuum System P. Chiggiato TE-VSC
News and Introduction from CERN June 15th, 2005
LIU Wire Scanner Project
LIU – EVM status and next steps
AFC 2017 (and 2018) AFC timeline:
CONS and HL-LHC day Analysis of needs from BE-CO
Update on the Critical Path of the PS Booster Schedule for the EYETS
Brief Status SPS Prototype PSB Prototype Installed in LS1
AD Horn upgrade HV generators
LIU Wire Scanner Milestones June 2017
LIU – EVM status and next steps
Working plan for 2017 Acquisition and Control Electronics
Fast Wire Scanner Prototype Mechanical Design
EC Activities Status for the LIU
AWAKE proposals for BE/BI
EN/HE activities for LIU
4th FRC meeting, Antti Onnela, CERN-PH-DT
Wire Scanner Mechanics
Status of the BI Work Package in the LIU-PSB frame
Consolidation and Upgrade of the LHC Experimental Vacuum Systems
ELENA electron cooler and SEM grids status
Renovation of the 45-year old PS magnets
Beam Wire Scanner for PSB
Beam Wire Scanners (PS prototype and LIU series)
Communication and Documentation Needs exemplified on WP 71
Linac4-PSB 160 MeV connection readiness review ( TE/VSC )
Preparations for a Lehman Review
CONSOLIDATION CPS-BL SYSTEM
HIE-ISOLDE contribution packages
Project management Ray Veness.
LIU-SPS review for BI (no BWS)
ATS Consolidation Day 22nd May 2019 Beam Instrumentation
East Hall under construction
Status of the BI Work Package in the LIU-PSB frame
Presentation transcript:

LIU Wire Scanner Series Costs Ray, Federico, Dmitry, William, Jonathan, Jose

Contents Basis of costing Cost of series electronics, acquisition and control Cost of series mechanics Other series costs Cost analysis Total series costs Existing EVM costs Analysis and options

Basis of costing Assume standard CERN costing, i.e. No overhead for staff or existing infrastructure, No charge for other CERN services such as vacuum qualification and installation Include all billed costs Cabling, design office, cleaning and leak detection, Costing includes Additional FSU dedicated to the assembly, test, installation of the series Cost for the preparation of a dedicated assembly area (as requested to LIU) Costing does not currently include Fellows, students funded by LIU

Electronics, acquisition and control Slides from Federico, Jonathan, Jose

BWS series for LIU. Cost estimate Project Start Project Finish Cost (18 tanks+18 instruments, no spares) Cost (21 tanks + 22 instruments) Mon 14/11/16 Mon 02/07/18 CHF 1,301,723 CHF 1,430,328 Task Cost (21 tanks + 22 instruments) Cost (18 tanks+18 instruments, no spares) Design of BWS for PS, SPS, PSB CHF 18,360.00 Critical raw material purchase CHF 95,000.00 Production Group 1 - Vacuum tanks* CHF 305,760.00 CHF 263,760.00 Production Group 2 - Stepped chamber + shaft** CHF 226,724.00 CHF 188,724.00 Production Group 3 - Conventional machining CHF 93,640.00 CHF 77,640.00 Production Group 4 - Acquisition Mechanics CHF 51,800.00 Special Components CHF 73,272.00 CHF 65,272.00 Commercial components purchase CHF 326,350.00 CHF 305,600.00 Supporting systems + fixation CHF 89,080.00 Auxiliary vacuum pipes CHF 106,632.00 Assembly of instruments CHF 20,400.00 CHF 19,125.00 Vacuum qualification CHF 10,560.00 CHF 9,000.00 Calibration CHF 5,100.00 CHF 4,590.00 Installation CHF 7,650.00 CHF 7,140.00 *1 x Vacuum tank = 14000 CHF **1 x Stepped chamber + shaft = 9500 CHF Courtesy: Dmitry Gudkov

Other costs Dedicated assembly area: Prototype PS scanners Could be in B.283, currently occupied by BL section, but there is room to share Would need significant renovation – perhaps the installation of a closed semi-clean area. First cost estimate at 50-100 kCHF Would need to be operational by end 2017 Prototype PS scanners Requested by the project for installation in YETS 17-18 Mechanical materials ordered, production scheduled for 2 instruments + 2 tanks Estimate cost ~150 kCHF

Total series costs ‘Baseline’ series estimate is the sum of the estimates from mechanics and electronics plus assembly area Unit costs: ~72 kCHF for the mechanics ~61 kCHF for the electronics (control, acquisition, cabling) ~133 kCHF for an installed, working instrument Includes the spares agreed with the project Should be a ‘reasonable upper bound’, but excluding any margin for unforeseen technical or other issues Baseline estimate (kCHF) Series electronics 1379 Series mechanics 1430 Assembly area 100 Total series 2909

Existing situation in APT Includes Costs of development and design, Prototypes in the SPS, PSB, SPS budget situation (*) is not clear Budget code is mixed with the LIU BGI Budgeted series production costs are: ~50 kCHF for mechanics (cf. 72 estimate) ~15 kCHF for electronics (cf. 61 estimate) ‘Paid’ numbers do not include costs for the PS prototypes Budget (kCHF) Paid (kCHF) PSB (64023) 970 403 PS (64033) 500 49 SPS (64040)* 532 666 Totals 2002 1118

Budget scenarios ‘Baseline’ scenario Baseline cost with all spares and FSU manpower Includes costs already paid in APT for BWS (and BGI) ‘Series only’ scenario Baseline cost with no spares (-129 kCHF for mechanics, -158 kCHF for electronics) or FSU (-150 kCHF) No budget or costs for design and prototyping (‘clean slate’ for the series production Budget (kCHF) Cost (kCHF) Baseline cost 2909 Design + proto 1118 PS protos 250 Baseline budget 2002 Totals 4277 Balance -2275 Budget (kCHF) Cost (kCHF) Baseline cost 2472 Design + proto PS protos 250 Baseline budget 1514 Totals 2722 Balance -1208

Issues with APT The cost of design and development was underestimated 488 kCHF budget in APT, ~1370 expected cost Only 220 kCHF was budgeted for a PSB prototype, whereas they have been installed in all 3 machine The series costs estimates are higher than expected, particularly the electronics 44% increase for mechanics, but 400% for electronics