Superconducting RF Crab Cavities

Slides:



Advertisements
Similar presentations
All experimenters meeting – July 7, 2014 LHC Crab Cavity Overview Tom Nicol – Fermilab All Experimenter’s Meeting July 7, It’s a group effort –
Advertisements

Fabrication Progress for LHC Superconducting Crab Cavities April 17, 2015.
Material choice Ofelia Capatina OC, Material choices Discuss material choices for – Helium tank – Flanges, joints, bellow OC,
Status of the SPL cavities at CERN I.Aviles & N. Valverde on behalf of SPL team 1I. Aviles & N. ValverdeLund, 11 December 2013.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Fabrication Progress for LHC Superconducting Crab Cavities July 10, 2015.
G. Olry, H-M Gassot, S. Rousselot (IPN Orsay) EuCARD-SRF annual review 2011, 4-5 May, IPN, Orsay Unité mixte de recherche CNRS-IN2P3 Université Paris-Sud.
Cryomodule Concept for the ODU RF Dipole Crab Cavity Tom Nicol* - Fermilab December 10, 2013 * With lots of help from HyeKyoung, Tom J, Shrikant, Ofelia,
LARP Rotatable Collimator Prototype Assembly completed and all mechanical tests successful: Cooling tubes now twist, under vacuum, as jaws turn, with R~1.
Ofelia Capatina on behalf of the CERN specification team
Dr. Michael Peiniger Superconducting RF activities at RI Research Instruments with a focus on EXFEL cavity production.
SPL cryo-module conceptual design review Cavity, helium vessel and tuner assembly N. Valverde, G. Arnau, S. Atieh, I. Aviles, O. Capatina, M. Esposito,
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
1 HIGH ENERGY ACCELERATOR RESEARCH ORGANIZATION ILC08/ NAKAI HIrotaka KEK Material Property Study for High Pressure Code in KEK NAKAI Hirotaka (KEK)
RF power & FPC status Eric Montesinos, CERN BE-RF on behalf of all people involved, great thanks to all of them !
KEKB Crab Development K. Hosoyama (KEK) Crab Cavity for HER Crab Cavity for LER Crab Cavity for KEKB History of Crab Cavity R&D Characteristics of Crab.
Status of crab crossing studies Presented by NAKANISHI Kota (KEK) 2008/1/25.
Summary of WG 2 - cavities W. Weingarten 15th SPL Collaboration Meeting CERN - 25/26 Nov Cavity WG.
Mechanical Issues SPL cavities/cryomodules Workshop CERN 30 Sep. 2009
HL-LHC Standards and Best Practices Workshop (11-13 June 2014)
1 Status of the CLIC two-beam module program A. Samochkine, G. Riddone Acknowledgements to the Module WG members 4 February 2014 CLIC Workshop 2014 (3-7.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
CERN status - Nb cavity – Manufacturing 1 15/Nevember/2010, Ofelia Capatina EN/MME 1 SPL Cavity Working Group Meeting TaskExternal Company CERN Provide.
1.3GHz Input Coupler for ILC
Status of Activities at CERN
Test plan for SPL short cryomodule O. Brunner, W. Weingarten WW 1SPL cryo-module meeting 19 October 2010.
20 years of high average Fundamental Power Coupler designs at CERN CWRF workshop 2014, Trieste Eric Montesinos, CERN-RF, on behalf of many colleagues CWRF.
Eric Montesinos - CERN - First SPL collaboration meeting - CERN December 11th 2008 First SPL collaboration meeting Experience with the LHC Main power Coupler.
FNAL efforts on LHC Crab Cavity R&D (Proposals for R&D sub-tasks, resources and schedule) Nikolay Solyak.
HL-LHC Crab Cavity Review Debriefing Comments from LARP June 30, 2014.
SPL cavity design by IPN Orsay Guillaume OLRY November rd SPL collaboration meeting.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
S. Atieh EN-MME Manufacturing R&D for SPL β =1 cavities at CERN on behalf of the SPL cavities mechanical design and manufacturing team.
TD26CC PLANS FROM CIEMAT Laura Sánchez on behalf Electrical Engineering Group of CIEMAT.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Material for Crab cavities ordered and foreseen S. Langeslag & P. Freijedo Menendez Material summarized in
HiLumi-LHC/LARP Crab Cavity System External Review – May Work partly supported by the EU FP7 HiLumi LHC grant agreement No and by the.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
1 - NbTi-Nb transitions for the extremities (Clé et Bords droites): DESIGN OF THE WELDING CONFIGURATIONS & SAMPLES FOR TESTING AND QUALIFICATIONS: - Tuning.
SPL cryomodule specification meeting, CERN 19th October 2010 SPL cryomodule specification: Goals of the meeting SPL cryomodule specification: Goals of.
Mechanical design considerations for beta=1 cavities OC, 28/July/20111SRF2011 Chicago O. Capatina, S. Atieh, I. Aviles Santillana, G. Arnau Izquierdo,
Spoke section of the ESS linac: - the Spoke cryomodules - the cryogenic distribution system P. DUTHIL (CNRS-IN2P3 IPN Orsay / Division Accélérateurs) on.
Engineering of the power prototype of the ESRF HOM damped cavity* V. Serrière, J. Jacob, A. Triantafyllou, A.K. Bandyopadhyay, L. Goirand, B. Ogier * This.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
ESS Cryomodule Status Meeting – Introduction | | Christine Darve Introduction to Cryomodules for the ESS 2013 January, 9 th Christine Darve.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
CERN – ENGINEERING DEPARTMENT: A. Dallocchio on behalf of EN-MME
CERN – ENGINEERING DEPARTMENT: A. Dallocchio on behalf of EN-MME
CERN – Zanon discussions
Quality assurance for Manufacturing Dressed Cavities for SPS prototype cryomodule C. Parente (HL-LHC Technical Quality Officer) Date:
Preparation of functional/engineering specifications for HL-LHC
WP5 Elliptical cavities
Crab Cavities Contribution from the U.S.
T5.2: Harmonization - Material and Component Reference
Crab Cavities: In-house Production Extremities
Crab Cavity HOM Coupler Specification Drawings & Tolerances
Complementary ISTC Projects #3888, 3889p
CERN Engineering Specification
Crab Cavity R&D Plan Kirk 1 6/Dec/2016
Superconducting Cavities: Development/Production
HL-LHC-UK: UK contribution to HL-LHC Crab Cavities and evolution
Hollow e- lens, Cryogenic aspects
Cavity + He Vessel interface
UK RFD Pre-Series cryomodule
SRF Section Cuvée 2014.
Operation experience of cryogenic system and cryomodules for the superconducting linear accelerator at IUAC, New Delhi. T S Datta ( On behalf of Cryogenics.
DQW HOM Update and Recent Developments
SPS-DQW HOM Measurements
Crab – RFD prototype: Fabrication Status Update
Magnetic shielding and thermal shielding
Presentation transcript:

Superconducting RF Crab Cavities Marco Garlaschè – CERN EN/MME On behalf of the Crab Cavities Team HiLumi LHC Goes To Industry Workshop CERN, Geneva, Switzerland – 26 June, 2015

Crab Cavities: Why? Currently in LHC, at a given experiment… …the AIM… Collision Point 26/06/2015 2φ …the AIM… to increase the number of collisions between the two LHC beams by reducing the crossing angle φ HiLumi 2 Industries - Garlaschè

Superconducting Radio-Frequency Cavities, a.k.a. CRAB Cavities Crab Cavities: Why? 26/06/2015 …the ANSWER… Superconducting Radio-Frequency Cavities, a.k.a. CRAB Cavities HiLumi 2 Industries - Garlaschè

Crab Cavities: Where & When? LHC Point 1 Modules to be installed on each IP side & beam LHC Point 5 SPS Test (before LS2) 2x Prototype Modules SM18 Area (~2016) Initial testing: CRAB cavities, clean room & handling facilities.. 26/06/2015 HiLumi 2 Industries - Garlaschè

Crab Cavities: What? 300 K > T > 80 K 80 K > T > 2 K 2 K …a Module is… Cryostat embedding 2x CRAB cavities auxiliary systems 300 K > T > 80 K 26/06/2015 80 K > T > 2 K 2 K 2 K BEAM HiLumi 2 Industries - Garlaschè

Bottom-Up View: Cavities RFD Cavity DQW Cavity 900 mm 26/06/2015 2x designs! Highly non-axialsymmetrical Niobium cavities 650 mm Technologies Involved: Forming of 3÷4mm-thick Niobium sheets non axisymm. shapes, high aspect ratios, profile tolerance ~ 0.5mm EB-welding (strict requirements …): Nb/Nb & Nb/NbTi Brazing (or other) of Nb to S.Steel Interest for Suppliers Needed Not Needed Much Welcome HiLumi 2 Industries - Garlaschè

Manufacturing R&D with companies SPL Project forming & welding of Cu  Nb CRABS Initial tests qualification of forming and RF 26/06/2015 Nb/SS CERN CERN HiLumi 2 Industries - Garlaschè

HOMs & FPCs1 Input/Output systems for power management inside cavities Cu Al2O3 620 mm 200 mm Nb SS Coaxial line 26/06/2015 Input/Output systems for power management inside cavities Technologies Involved: Mix turning + milling + assembly of Cu and Nb parts (assembly profile ~0.3mm) Brazing of vacuum-air interfaces embedding Ceramic + Cu + S.Steel 1 High Order Mode Dampers, Fundamental Power Couplers HiLumi 2 Industries - Garlaschè

Magnetic Shieldings & He Vessel TSHIELD= 80K÷300K TSHIELD= 2K 26/06/2015 Helium Vessel: Machining (Titanium Gr.2) Assembly + Titanium TIG welding Supply of Titanium bellows 900 mm Magnetic Shielding alloy: Forming + assembly Annealing treatment Supply of raw Material (Nb, NbTi, Magn. Shielding, St. Steel, Titanium) HiLumi 2 Industries - Garlaschè

Cryostat Manufacturing of Cryostat and Auxiliary systems 1700 mm Sheet metal working of tank (precision interfaces) Cryo Line (welds tight at 2K) Ti/S.Steel direct transitions (also @ 2K) SS Bellows and vacuum equip. Thermal shielding with Helium cooling + MLI … 1700 mm 26/06/2015 2900 mm HiLumi 2 Industries - Garlaschè

Electronics and Power supplies Courtesy E. Montesinos 26/06/2015 SPS Test Series HiLumi 2 Industries - Garlaschè

Passive/active Tuning System Not Forgetting… Passive/active Tuning System (ref. Kurt Artoos) FSI1 Alignment System (ref. Mateusz Sosin) Actuation 26/06/2015 1 Frequency Scanning Interferometry HiLumi 2 Industries - Garlaschè

Not Forgetting… Active Alignment @ SPS Test: motorized & remotely-controlled supporting systems 26/06/2015 HiLumi 2 Industries - Garlaschè

Accelerating Science and Innovation Thank you for your attention! Accelerating Science and Innovation 14