LSST PROJECT PHASE #2 BASE FACILITY AND DATA CENTER CONSTRUCTION

Slides:



Advertisements
Similar presentations
February 10, 2010 Sarasota Memorial Health Care System Management Council February 10, 2010.
Advertisements

Alliant Energy Field Renovation. September 2005 Work area blocked off Pitching mound is flattened.
Bond Construction Update Citizen’s Oversight Committee Long Beach Community College District January 25, 2010 EDUCATE  ENGAGE  EMPOWER 1.
Business Park Project: Business Park Project: ‏ Logistic Park, Industrial Park, Gas Station, Shopping Center, Office Building, Restaurant and Motel ON.
Administration & Finance November 18, 2014 Utility Corridor and Roadway Relocation Project Update (UCRR)
Cassidy Elementary – Renovation Architect: Tate.Hill.Jacobs: Architects General Contractor: D.W. Wilburn, Inc. Substantial Completion Date:August, 2010.
UPCOMING MTA CAPITAL CONSTRUCTION SOLICITATIONS
Bond Construction Update Facilities Advisory Committee Long Beach Community College District April 14, 2010 EDUCATE  ENGAGE  EMPOWER 1.
Bob Law FAC Oct 24, Sector 20 Project Overview Sector 20 Site Plan Description Organizational Chart Schedule Cost.
Blue Prints.
CONSTRUCTION BLUEPRINT READING
1 MICE - INFRASTRUCTURE MICO meeting 7 th February 2008 Tim Hayler.
Architect Drawing of New Entrance. Location Location of Phase II Construction Project – Old tennis courts west of the existing building.
Building Plans.
Wolverhampton City Centre Metro Extension. Introduction  Background New Tram and Depot Extension Birmingham City Centre Extension Original Wolverhampton.
Cargo Dock 16: Pre-Bid Meeting Presentation June 13, 2013.
Phillips Ave. Fire Station. The Fire Station: Phillips Ave. Fire Station RFP to be issued  Retain Historic Building  Allow Residential Use – Single.
Chapter 16 Site Preparation. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Identify tasks required.
Planning Construction Chapter 15. Private Sector  Most buildings and other structures are built for ordinary people. These people make up the private.
Planning Commission Public Hearing: SUB Proposed 6-lot Subdivision at Bland Circle December 2, 2015.
Bond Construction Update Facilities Advisory Committee Long Beach Community College District April 26, 2010 EDUCATE  ENGAGE  EMPOWER 1.
8/31/05DR Lynch1 HBD Preparations in the IR Don Lynch.
Cassidy Elementary – Renovation Architect: Tate.Hill.Jacobs: Architects General Contractor: D.W. Wilburn, Inc. Substantial Completion Date:August, 2010.
Bond Construction Update Facilities Advisory Committee Long Beach Community College District April 6, 2011 EDUCATE  ENGAGE  EMPOWER 1.
1 BROOKHAVEN SCIENCE ASSOCIATES Accelerator Systems Installation F. Willeke, ASD Director 6 th ASAC October 22-23, 2009.
January 28, A new power station, privately owned, is established in the Gaza Strip The Israel Electric Company receives a concession.
March 22, –  Design Concept & Hall Layout  Access Tunnel  Top heading Tunnel  Displacement of detector hall by push-pull operation.
Contents Jason Tarrant STFC Aim of Presentation to show: l Problem of compressors located at south shield wall l Description of compressor layout and services.
I-80 San Pablo Dam Road Interchange Project – Phase 1.
Second Street Closure for Construction of B21 1/16/16 – 1/31/16.
Bond Construction Update Facilities Advisory Committee Long Beach Community College District March 3, 2010 EDUCATE  ENGAGE  EMPOWER 1.
Miller Driscoll Building Committee Construction Update Thursday April 7, :00 PM - 7:00 PM Presented by: Turner Construction, CMA 1 Additions & Alterations.
January 2009 Phase IVB Construction Photographs by Brent Anderson.
Siting/Conventional Facilities Jonathan Hunt PIP-II Machine Advisory Committee 9 March 2015.
Harrisburg Overpass Construction Update July 7, 2015.
CBETA Technical Review
Chicago Transit Authority Energy Initiatives
Update of MVD services and requests
Energy Savings Projects
Industrial Zone Alatau district of Almaty
Local communities and municipalities
Facility Concept Design and Study
New Bridge Construction
January 2016 December 2017 July 2015 June October 2014 Commencement of first contracts and site construction December 2017 Grand openning.
IA 122 RECONSTRUCTION PRE-BID MEETING
Pinole-Hercules Water Pollution Control Plant Upgrade Project
Moraga community Foundation
Minuteman Vocational Technical Regional High School Progress
ICE 101 APPLICATION GUIDE INTALLATION AND OPERATIONAL CONSIDERATIONS.
A r d m o r e T r a n s i t C e n t e r
Parkland/Brookdale Interceptor Replacement
Facilities Modernization Program
Davisville Junior Public School / Spectrum Alternative Senior School
August 28, 2018.
Minuteman Vocational Technical Regional High School Progress
WAREHOUSE RENTALS OF GEORGIA
ARIZONA WATER COMPANY East Sedona Water Storage Facility
New Public Transport Infrastructure
Project Aerial Site Plan
An Introduction to Subway Construction Technology
URBAN TRAIL PROJECT UPDATES
Harbour Island Force Main Replacement
A133 IPSWICH ROAD SCHEME COMMUNICATION UPDATE ( )
A133 IPSWICH ROAD SCHEME COMMUNICATION UPDATE ( )
The Collapse of Gaza's Electricity System – Well-Planned and
Fueling the Future of the Fairbanks North Star Borough
On-Site Facilities for Pre-production deployment
Steps To Prepare Site For Site Work Construction Calhoun GA.
May 9, 2019.
Presentation transcript:

LSST PROJECT PHASE #2 BASE FACILITY AND DATA CENTER CONSTRUCTION

AS PREPARATION OF THE SITE FOR THE LOCATION OF THE BASE FACILITY AND DATA CENTER HAS BEEN NECESSARY TO PERFORM A SERIE OF PREVIOUS WORKS TO THE CONSTRUCTION OF THE BUILDINGS, AS INDICATED: .- RELOCATION OF ELECTRICAL LINES .- RELOCATION OF COMMUNICATION LINES .- SECTOR WATER MATRIX TO INTERVENE .- GAS LINES .- SEWAGE SYSTEM .- RELOCATION OF SMALL FIRE STATION .- DEMOLITION OF NORTH SIDE OF THE MOTEL .- PARTIAL WAREHOUSE RELOCATION .- INTALLATION OF HALF VOLTAGE LINES AND LOW CURRENTS. .- REMOVE OF ARBORIC SPECIES AND TRANSPLANT OF PALMERAS SOUTH SECTOR MODULUX BUILDING.

RELOCATION OF UTILITIES .- ELECTRICAL LINES .- COMMUNICATION LINES .- WATER MATRIX .- GAS LINES .- RED FIRE .- SEWAGE SYSTEM

DUCT EXCAVATION AND INSTALLATION Excavation and installation of electrical and communication ducts. Electrical ducts 2 of diameters. 75 mm. Communication ducts 2 of diameters. 110 mm. Depth of excavation: 500 mm. and 800 mm. in the street.

MOTEL SECTION TO DEMOLISH The Motel section that was necessary demolishing corresponds to the north side section with a total of 5 rooms and a kitchenette.

MOTEL DEMOLISHING PROCESS .- July 4th: Start demolition of the Motel, work lasted 3 days.

DEMOLITION AND REMOVAL OF WAREHOUSE The partial removal was a necessary work to create space for the Base Facility and Data Center construction.

LOCATION FOR THE NEW WAREHOUSE SITE Foundations and slab work to rearm the warehouse

FRONT FACE Y DOCK LEVELER ` FRONT FACE Y DOCK LEVELER Dock leveler : .- 6000 lbs Capacity .-Maximum height lift 1600 mm. .-Measurements: 1500 x 2000 mm.

INSIDE NEW OFFICE AND WAREHOUSE RESTROOM Along with the move to the Warehouse new location, office and restroom were remodeled.

EXCAVATION ROUTES FOR HALF VOLTAGE LINES AND LOW CURRENTS The new Facility and Data Center installations require a new electrical connection that must be channeling with Half Voltage Lines and Low Currents until the new technical room.

ROUTE AND EXCAVATIONS FOR HALF VOLTAGE LINES AND LOW CURRENTS OF NEW CONNECTION Start of works: September 1st, 2017 and still in progress.

EXCAVATION ROUTE AND DUCT CONFIGURATIONS Excavation routes for the channeling of Half Voltage ducts and Low Currents according to EE.TT. Depth of Excavation: 650 mm in Green areas 800 mm. in cross streets. Half Voltage Ducts 05 ducts of PVC Schedule 80 Diameters .90 mm. 01 Duct of PVC schedule 40 Diameters. 50mm. 03 Ducts of PVC schedule 80 Diameters. 75 mm.

PREPARATION FOR TECHNICAL PLATFORM It’s necessary to eradicate some Tree species and to relocate Palmeras. .- 03 Aromos Tree .- 04 Almend Tree .- Remove and transplant 09 Palmeras in the hill

CUT AND DIMENTIONS OF TECHNICAL PLATFORM

TREES MUST BE REMOVE

ALL THE INTERVENTION AND BOTHERS THAT WILL CAUSE CONSTRUCTION PROCESS WILL BE IN BENEFIT OF OBTAINING THIS RESULT.