Identifying, notifying concerned parties in Spain

Slides:



Advertisements
Similar presentations
PUBLISH NOTIFY / TAKE COMMENTS ANSWER ENQUIRIES Notification Obligations 1.Statement on Implementation 2.Notification of Technical Regulations or Conformity.
Advertisements

Paulo Manso CDM EB September, 2011 Proceeder for Submission & Approval Standardized Baselines.
WTO, Trade and Environment Division
Transparency and Domestic Regulation Mina Mashayekhi Division on International Trade UNCTAD.
Flow-chart explaining information exchange and document dissemination under the IPPC IPP Training WS – Handout no. 4a.
Joint Aarhus Convention/Cartagena Protocol on Biosafety workshop on public awareness, access to information and public participation regarding living modified.
Rule-Making Book II EU Administrative Procedures – The ReNEUAL Draft Model Rules 2014 Brussels, May th Herwig C.H. Hofmann University of Luxembourg.
GATS & Telecom Transparency. Key Ingredients for Reform }Clearly set out policies in laws, regulations, licenses, contracts }Make all processes open.
Interaction between EIA and Articles 6.3 and 6.4 of Habitats Directive Yvonne Scannell Law School, Trinity College, Dublin Arthur Cox, Solicitors, Dublin.
Sources of Law Dr Y Scannell. Different kinds of law International European Domestic or Irish law Common law – the law made by the courts throughout the.
Public participation – steps of the procedure PARTICIPATORY AND PROCEDURAL RIGHTS IN ENVIRONMENTAL MATTERS Warsaw, 4-6 March 2015.
Current Status of Public Participation in the EIA Process in China Seoul Korea, June 2007 By Zhao Xinfeng Appraisal Center for Environment and Engineering,
Hellenic Ministry for the Environment, Spatial Planning and Public Works Greek Experience on the Implementation of EPER REPORTING IN GREECE Η ΕΛΛΗΝΙΚΗ.
Implementing the Second Pillar of the Aarhus Convention: Problems Identified in the National Implementation Reports Magda Tóth Nagy, Senior Expert Geneva,
National MSP in the Mediterranean Sea: Spain (and Portugal)
UNECE and OSCE joint event, Almaty, May 2012
The Aarhus & Espoo Conventions Making implementation work for stakeholders.
Regional Policy Major projects approval process in Brendan Smyth DG REGIO.
CHAPTER 3 SCOPING AND AGENCY COORDINATION. Scoping - the procedure for determining the appropriate level of study of a proposed project/activity - process.
Access to Information and Public Participation in Developing and Operating PRTR Systems Magda Tóth Nagy Public Participation Programme October 15-16, 2007.
1 Workshop on the Directive 96/61/EC concerning (IPPC) Integrated pollution prevention and control INFRA Public participation & access to environmental.
Jerzy Jendrośka Implementing the Aarhus Convention’s provisions in national legislation and practice: experience of countries of the UNECE region in the.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.1 Steps in the Licensing Process Geoff Vaughan University.
Task Force on Access to Justice Eighth meeting Geneva, June 2015 Scope of review EECCA countries (selected issues) Dmytro Skrylnikov Bureau of Environmental.
Opole University1 Jerzy Jendrośka The opinions of the Aarhus Compliance Committee as guidance for public participation procedures EIA and SEE transposition.
Jerzy Jendrośka Energy security and legal requirements for environmental protection, public involvement and transboundary co-operation Scientific support.
The application of certain restrictions on access to environmental information in accordance with AC Personal Data Ana Barreira Instituto.
State of implementation of the decision III/6f regarding Ukraine (MOP 2, June, , 2008, Riga, Latvia)
Recent developments in EU legislation relevant to the future development of article 6 of the Aarhus Convention European Commission, DG Environment, A2.
Opole University1 Jerzy Jendrośka Public participation in the findings of the Compliance Committee The Aarhus Convention Expert Group on Public Participation.
SUPPORTED BY THE EUROPEAN UNION’S OBNOVA AND PHARE PROGRAMMES Public Involvement EIA TRAINING RESOURCE MANUAL FOR SOUTH EASTERN EUROPE.
DG ENV Environmental assessment procedures for energy infrastructure projects of common interest (PCIs)
Early public participation In Decision-Making Process Nana Aghlemashvili Chief Specialist of the Legal Department.
Peter Lukáč Ministry of Environment of the Slovak Republic Department of Environmental Assessment.
Albania - Identification and notification of the public concerned in Decision Making : Best practices and Challenges Aarhus Convention Task Force on Public.
Tracy McCracken SPS Technical Advisor East Africa Region United States Agency for International Development (USAID) Kenya and East Aferica/Office of Regional.
EROL MERTCAN RAPPORTEUR, SMALL GROUP OF LEGAL EXPERTS Revision of Article 9 by the Small Group of Legal Experts following WGD-6.
LEGISLATIVE PROCESS IN BANGLADESH By Kazi Arifuzzaman, Deputy Secretary, Legislative and Parliamentary Affairs Division, Ministry of Law, Justice & Parliamentary.
TAIEX-REGIO Workshop on Applying the Partnership Principle in the European Structural and Investment Funds Bratislava, 20/05/2016 Involvement of Partners.
The Aarhus Convention Reporting Mechanism National Implementation Reports 2011 Experience and lessons learned Aphrodite Smagadi, Aarhus Convention secretariat.
Public Participation in Biofuels Voluntary
Dr. José Ignacio Cubero Marcos University of the Basque Country
INTEGRATED PERMITTING PROCEDURE IN THE CZECH REPUBLIC
Overview of public participation in strategic decision-making in the UNECE area David Aspinwall.
Jerzy Jendrośka Maastricht Recommendations on Public Participation
The Final Decision in the Environmental Impact Assessment Procedure in Ukraine as a Multilateral Agreement Tretiak Taras Associate Professor of National.
Overview of the WTO SPS Agreement and the role of
14-16 September 2016, Wrocław, Poland
A Race to the Bottom A Context for the Madness
Establishing the Infrastructure for Radiation Safety Preparatory Actions and Initial Regulatory Activities.
Jerzy Jendrośka Public particiption
Towards Modern Environmental Impact Assessment (EIA) in Uzbekistan
Towards Modern Environmental Impact Assessment (EIA) in Uzbekistan
Jerzy Jendrośka Transboundary procedures
DG Environment, Unit D.2 Marine Environment and Water Industry
IPP Training WS – Handout no. 4a
Presentation to Local Authorities
Exchange of information with the WP.29 secretariat
Overview of standards-related obligations and reporting by Mongolia
Public Participation in Czech Republic
Magdalena Bar Annual EELF Conference 2016
EU Food Safety Requirements: - Hygiene of Foodstuffs -
The Aarhus Convention and Biosafety
IPP Training, IAPSC & IPPC/FAO/FAORAF
EU-Project: Trade and Private Sector Development (TPSD)
Meeting of PAP/RAC Focal Points, Split, Croatia, 8-9 May 2019
The Aarhus Convention Reporting Mechanism
Article 9 of theAarhus Convention: overview
IPP Training, IICA & IPPC/FAO, Trinidad & Tobago
REPUBLIC OF CROATIA MINISTRY OF ENVIRONMANTAL AND NATURE PROTECTION
Presentation transcript:

Identifying, notifying concerned parties in Spain Obstacles, challenges and good practices in relation to public participation in decision-making: Identifying, notifying concerned parties in Spain 6th meeting of the TF on Public Participation 10-11 February 2016 Ana Barreira Instituto Internacional de Derecho y Medio Ambiente e-mail: ana.barreira@iidma.org www.iidma.org

Relevant Aarhus Convention provision Article 6.2. 2. The public concerned shall be informed, either by public notice or individually as appropriate, early in an environmental decision-making procedure, and in an adequate, timely and effective manner, inter alia, of:. Criteria for notice: Effective notice: tools for notification Adequate notice: notification to be given to the whole public concerned (identifying) early enough Timely: time frames between having access to document, preparing comments and submitting them

Identification of concerned public in Spain “concerned public” in an administrative procedure are consulted at different stages of granting a permit including permits within Annex I of the AC In general, there is no previous identification of “concerned public” although there are a few specific provisions which require it: Under EIA Law if the promoter requests the competent body to prepare a scoping document to prepare the EI Study, then the competent body has to identify and consult the concerned administrations and public (main national and local NGOs mainly), if not the competent body has to identify and consult the concerned administrations and public on the EI Study When the development of a project requires the occupation of private property and rights and/or taking of that property and rights, Law on Eminent Domain of 1956 (or compulsory acqusition) and its Regulation establishes a procedure which entails the obligation of the promoter to identify the names and address of the owners

Public notice to concerned public Effective notice Under Law on Administrative procedure, public consultation is announced in official journals (State and regional). This announcement or “public notice” is not only addressed to “concerned parties” but also to the public in general. Public notices in main news papers at the State and regional levels also take place In some cases notices are also published in the electronic offices of certain Administrations

Public notice to concerned parties Is the general practice of notification to concerned public adequate? Does effectively targets at least the public concerned with the decision? Yes and No Does it take place at en early stage of the proceeding? Normally takes place once the Administration has received the application from the promoter containing the relevant documents ( EI Study, application for an IPPC permit…) The notification always refers to the project under consultation

Public notice to concerned public (timely) IPPC Law 16/2002 and Law on EIA provide that public consultation or participation shall be common to IPPC permit procedure, EIA and substantive authorization within a 30 days timeframe Some cases: Combined cycle power plant UGS Project Wind farm project Publication in OJ Consulting docs Preparing comments & sending those

Public notice to concerned public Under the Spanish Law on EIA a specific consultation procedure for concerned public is provided requiring a personal notification Most of the time not all concerned public is identified and if the concerned public wants to obtain such a consideration is required to file an application for such a recognizition

Conclusions Good practices on concerned public identification are found in the Law on Eminent Domain and to certain extent in Law on EIA Obstacles on “timely” notification is found in EIA and IPPC Laws The fact that most of the times notifications are collectively done through official journals for concerned public and the public in general remains a challenge