Test box for ProtoDUNE SP – Integration Test

Slides:



Advertisements
Similar presentations
How to center the top roller Current Situation The slider is not centered because the bottom slider was not placed at 6 o’clock ?!
Advertisements

Xenon Detector Status Liquid Xenon Group. 1 Outline Cryostat construction –Honeycomb panel test at Pisa –Assembly –Cryogenic test at SIMIC –Leak test.
19th – 20th of September 2007Cryogenic Expert Meeting at GSI, Jan Patrick Meier1/11 Cryogenic Experts Meeting at GSI, 2007 The SIS 100 Cryogenic Jumper.
Design of the T962 Cryostat L. Bartoszek BARTOSZEK ENGINEERING 5/10/07.
Manchester 09/sept/2008A.Falou & P.Cornebise {LAL-Orsay}1 CALICE Meeting/ Manchester Sept 2008 SLAB Integration & Thermal Measurements.
Installation. Indoor Unit Installation Typical Installation.
ATD Assembly. ATD Assembly #1 Dewar Assembly #1 Status: Dewar has been completely assembled and vacuum tested. No vacuum leaks were detected on the outer.
TPC Proposal for the 35 Ton Liquid Argon Test Abstract We propose to equip the 35 ton cryostat with one APA and two CPA’s, and all the necessary equipment.
Engineer Training Inkjet Head Cleaning TJ8300 / TJ8500 Inkjet Head Cleaning.
ITS /MFT installation concept CERN 27 September 2012 Corrado Gargiulo.
1.  Preparation of larger parts in a Clean room Class (ISO7)  Preparation of smaller parts in a “baldaquin” annex  Assembly in a clean-room Class.
PKI-Anwendungen 6/2/ Base framework. PKI-Anwendungen 6/2/ Bottom frame.
AMS-02 tracker mechanics status of assembly and integration at UniGe Outer planes: - Tests of evaporator (cooling loop) integration - Tools to develop.
AMS-02 tracker mechanics status of assembly and integration Inner tracker integration completion: - Assembly and cabling - Temperature and magnetic field.
Installation. Indoor Unit Installation Typical Installation.
Pump is Blue part (right) - timer is black (left side) New Electrical Outlet This Photo shows where the Re-Cir pump is installed on the Output line on.
1 Cryostat assembly, integration and commissioning procedures M.Olcese Version: 07 May 2008.
GERDA collaborationmeeting, Ringberg castle Béla MajorovitsTG5 Review: Infrastructure on top of the tank1.
Majorana collaboration meeting, Seattle, Aug.7 - Aug. 9 Béla MajorovitsGERDA detector mounting 1 GERDA Detector Mounting The Detector Holders Detector.
Installation. Indoor Unit Installation Typical Installation.
Residential Construction Window Installation Guide *Source: (1) Carpentry & Building Construction Feirer & Feirer (2) Sill to Sash; A Professionals Guide.
Assembly Scenarios Draft 1 MODEL simulation based on CXUO-CRY-AP-001.
Update on alignment kit and stave 250 frame M.Gibson (RAL) 1.
24 January 2014 LARP VTF Follow-up Meeting P. Kovach VTF 1 LARP Vertical Test Facility Vertical Dewar Design, Magnet Prep And Installation Paul Kovach.
CRYOSTATS DESIGN. WA105 – Cryostat Cut-out WA105 – external walls penetrations & GTT All the information needed has been sent this morning to GTT, and.
11/30/20151Robin Lafever The existing 300 K Flange This is certainly an older version but is useful to illustrate The proposed modifications.
Assembly Procedures of the cavities Ancillaries (RF power coupler, Tuning system, RF cables) 19/03/2014Mathieu Therasse BE/RF/SRF1 Special Linac WG meeting:
TAS at IP5 Present situation and plans François BUTIN TS/LEA.
Presentation by ANAS AHMAD ME1 B1 batch Submited to
Installation of the T600 at Fermilab CSN2, September 22,
Dual-Phase ProtoDUNE Detector Installation : Plans & Constraints Adamo Gendotti.
Single phase ProtoDUNE detector installation Plans and Constraints Jack Fowler Duke University 23-Feb-2016.
Baby Mind C OIL DESIGN AND ASSEMBLY SCENARIOS Helder Silva Phillipe Benoit Alexey Dudarev Gabriela Rolando Herman ten Kate Etam Messomo Laurent Nicola.
MICE Prototype Coupling Coil Cooling Circuit Design Dan Cheng Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
Plans for the UT Installation LHCb infrastructure workshop February Burkhard Schmidt for the UT group.
Cryomodule Interconnect Installation Issues A Comparison of XFEL to LCLSII Karen Fant 7/29/2015.
Installation of the T600 at Fermilab Fermilab, February 15,
Mounting TPCs in SVX Dock During Phase II Tomorrow I will meet with a company engineer to update the BEAST TPC vessel design. I've attached some slides.
WA105 6x6x6 Cryogenics David Montanari / Johan Bremer Sep 21, 2015 Rev. 1.
TPC Support Installation 26 Apr 2016Dan Wenman Mechanical Engineer1 Overview Installation of the support rails Details of the rail from the SAS to the.
STEP 1: ASSEMBLE ANGLE PLATES
Final Design Cryogenic and mechanical configurations
Teleconf ACS – FREIA 28th March 2017
SPL RF coupler: integration aspects
The LBNF cryostats Marzio Nessi, CERN 16 March 2017.
Installation of the T600 at Fermilab
Baby-MIND Modules & Services
ProtoDUNE – DSS Installation, Alignment and QA
Service channels between Tracker and PP1
Update of MVD services and requests
NA62 LAV Anti1 REMOVAL & TESTS
HFM Test Station Main Cryostat
- STT LAYOUT - SECTOR F SECTOR A SECTOR B SECTOR E SECTOR D SECTOR C
Teleconference ACS – FREIA 18th April 2017
cooling for BGV modules
Teleconference ACS – FREIA 10th May 2017
David Montanari / Johan Bremer Jun 11, 2015 Rev. 1
LARP Vertical Test Facility
Mechanics for front-end Electronics Of T2K-II TPCs – A Few Conceptual Ideas D. Calvet, Irfu, CEA Saclay, Gif sur Yvette Cedex, FRANCE.
Additional muon stations for the Upgrade of the Elevator Regions in the ATLAS Muon Spectrometer. Integration issues Denis Diyakov, Alexander Seletskiy,
Warm structure requirements :
NP04 CPA/FC/HV Interfaces
C50 Cavity pair Assembly Changes
TPC Support and Constraint TPC Support
Design of Distribution Feedbox at LHC P7
iSHELL Design Review Cryostat & Optics Bench
T400 Motor Replacement.
Cryomodule Assembly Plan
Gattini Detector Installation
DS20k Integration Workshop
Presentation transcript:

Test box for ProtoDUNE SP – Integration Test

Box specifications - Dimensions around 2.5x6.7x0.3m (LxHxP) (TBC) - Faraday cage - Dark inside to test the Photo-Detectors - Have one humidity/temperature sensor to measure dew point - Input line for Gas N - May need a line for dry gas to avoid condensation while lowering temperature. TBC. - Sealed to avoid gas leaks - Need perforations to get the Cold Electronics signal cables (20 in total) out of the box and 10 cables for PD. Or a kind of feedthru to get all cables out. - Hook(s) to hang from the rail that holds the APA inside the clean room - Be able to open and close around the APA

Open issues SEALING: Probably bolting, rubber gasket will not be good for cryo-temperature; the best would be an indium sealing, but it will cost: 20-85 CHF/m for Ø = 1-2 mm. PENETRATIONS: possibly one, connected to an actual ProtoDUNE SP flange. APA HANDLING: if we keep the APA hanging on the rails during the test, we will need further penetrations for these cables: Can we hang the APA from inside the box? See the following. COLD TEMPERATURE CONTROL: continuous flushing? In this case we need an exhaust line, but in order not to waste too much we will need some insulation, or a double-wall structure (vacuum pumped). SPACE AND GAS LINES IN 182: not too much space, possibly will do test horizontally. New lines may be needed, besides existing ones, to allow coexistence with other systems. No cold N2 storage so far, one will be installed (LN2) for WA105 1x1x3 m3. GAS LINE IN EHN1: Can we take gas from the main cryogenic plant (i.e.: connect one line going into the clean room)?

Hypothesis of Cold Box design Carved box containing the APA, with flat cover to close. Single or double wall? Depending on thermal insulation request. Related to this: gas continuous flushing or filling and static operation? Completely covered with passive insulation, if needed to maintain cold the gas. Sealing best solution: bolted cover and use indium (2 mm) -> high cost Otherwise? Bolting, double wall and rubber gasket on the outer side? Supports on the box inner walls, on the bottom (to sustain APA frame during positioning inside the box) and on the top (to hang APA). Holes, used to screw in the supports, may be foreseen on all internal walls, in case we need to operate the box horizontally for the initial test.

Box drawing Some kind of support/clamp can be used to hang the APAs, from INSIDE the box ceiling. This will allow to disconnect from the rail system during this particular stage. Best would be the same type of clamp to hang the APA to the rail. COVER Top/bottom APA supports. Bottom detail in next slide Connection (welded on the box ceiling) to a flange with feed-throughs, to extract cables (cold electronics, photon detectors, slow control). Dimensions TBD. Possibly to be connected to an actual ProtoDUNE SP flange.

Box drawings - II Support for APAs, to be used during movement in/out of the box. Not meant to constraint APA. Bottom, side if necessary. FRONT VIEW VIEW FROM ABOVE SIDE VIEW

Hanging procedure -sketches RAIL CE board TEST BOX (WITHOUT COVER) TOP HANGERS (schematized) BOTTOM HOLDERS APA 1) Starting position (no penetration or flanges shown).

Hanging procedure –sketches – II RAIL CLOSED BOX 2) Bring APA in front of Box; lean it on bottom holders, while still hanging on the rail. 3) Hang APA on top hangers; remove connections with rail. 4) Put cover and close, seal. Electrical connections not shown here. After the test, the box is opened and the procedure is reversed, to re-hang the APA on the rail and bring it towards the cryostat.