MSC report 14-20 September 25-09-07 weekly meeting EM-MSC-250907.

Slides:



Advertisements
Similar presentations
19. October 2004 A. Freise Automatic Alignment using the Anderson Technique A. Freise European Gravitational Observatory Roma
Advertisements

MSC recent activities virgoweek Cascina 4 Dec 2006.
Status of the Virgo Commissioning G.Losurdo – INFN Firenze/Urbino for the Virgo Collaboration.
Cascina, January 25th, Coupling of the IMC length noise into the recombined ITF output Raffaele Flaminio EGO and CNRS/IN2P3 Summary - Recombined.
Locking improvements after the end of VSR1 Gabriele Vajente for the Locking Group 14 th ILIAS WG1 meeting Cascina – March 6 th 2008.
Payload design methods versus modeling E. Majorana.
Virgo commissioning update - VSR1 first month summary E. Tournefier WG1 meeting, Cascina June 20 th,2007.
Suspended Mirror control: Learning through Virgo Experience E. Majorana - I.N.F.N. Pisa Aspen GWAD February 16, 2004.
1 Virgo Commissioning progress and plans ILIAS, Jan 23 rd 2007 Matteo Barsuglia on behalf of the Commissioning Team.
VSR1 summary - post VSR1 Commissioning plans E. Tournefier (LAPP-CNRS) LSC-Virgo meeting Oct 22 nd, 2007.
rd ILIAS-GW annual general meeting 1 VIRGO Commissioning progress J. Marque (EGO)
SIESTA for Virgo locking experience L. Barsotti University of Pisa – INFN Pisa on behalf of the Virgo Locking Group Cascina, March 16th 2004 Simulation.
Present Superatttenuator performance vs. AdV & ET Requirements S.Braccini for Virgo Suspension group.
1 Virgo commissioning since the end of VSR1 E. Tournefier for the commissioning team ILIAS WG1, Cascina March 5 th,2008.
Virgo Control Noise Reduction
1 Ist Virgo+ review Cascina H. Heitmann Alignment: Virgo+ changes.
Thoughts on short term improvements for Mirror Suspension Control G.Losurdo - P.Ruggi.
March 17, 2008LSC-Virgo meeting1/12 Virgo Status B. Mours.
1 1.ISC scope and activities 2.Initial Virgo status 3.Design requirements 4.Reference solution and design status 5.Plans toward completion 6.Technical.
EM-MSC MSC Columbus’ eggs VW EM-MSC outline EQG  SFR Note Actuation Noise: still under study, a framework of actions is being.
Virgo Commissioning update Gabriele Vajente for the Virgo Collaboration LSC/VIRGO Meeting – MIT 2007, July LIGO-G Z.
1 Noise sources at high frequency in Virgo E. Tournefier (LAPP-CNRS) ILAS WG1 meeting, Hannover December 12 th,2005 Recycled ITF sensitivities Noise sources.
MSC recent activities Commissioning Cascina 2 Apr 2007.
Environmental noise studies at VIRGO Environmental contributions to Virgo readout noise (C-runs) many sources identified through coherency analyses with.
Status of VIRGO Francesco Fidecaro (after Lisa Barsotti) - University and INFN Pisa – on behalf of the VIRGO collaboration Aspen - January 19 th, 2005.
Experimental tests of SA simulation Irene Fiori – Simulation Workshop – March 18, 2004 Virgo dataSiesta simulation 1. Inertial Damping simulation  test.
04. November 2004 A. Freise A. Freise, M. Loupias Collaboration Meeting November 04, 2004 Alignment Status.
Takanori Sekiguchi External Review Control and tuning of suspension 1 T. Sekiguchi KAGRA 4th External Review.
SUSPENSIONS Pisa S.Braccini C.Bradaschia R.Cavalieri G.Cella V.Dattilo A.Di Virgilio F.Fidecaro F.Frasconi A.Gennai G.Gennaro A.Giazotto L.Holloway F.Paoletti.
1 Virgo Commissioning progress ILIAS, Nov 13 th 2006 Matteo Barsuglia on behalf of the Commissioning Team.
EM-MSC MSC staus & plans Commissioning meeting
LSC-VIRGO joint meeting - Pisa1 Input mirrors thermal lensing effect Frequency modulation PRCL length in Virgo Some results from a Finesse simulation.
Pre-stabilized laser (PSL) for AdV Scope of the system Main tasks Requirements Reference solution and status of the design Plans towards completion Technical.
1 1.Definition 2.Deliverables 3.Status of preliminary design 4.Risks 5.Tasks to be done 6.Decisions to be taken 7.Required simulations 8.Planning ISC workshop:
1 The Virgo noise budget Romain Gouaty For the Virgo collaboration GWADW 2006, Isola d’Elba.
C. Palomba - DA Meeting Update on the analysis of VSR1 data, focusing attention on the presence of spectral disturbances. More data  more.
MSC - 18 Oct 071 LOW FREQUENCY SEISMIC NOISE: LOCKING AND SENSITIVITY ISSUE Paolo Ruggi noise meeting.
Loïc Rolland LSC-Virgo, Orsay- June 11th Virgo ‘timing’ calibration Loïc Rolland Note: Timing calibration during VSR1 in the Virgo codifier (VIR-028A-08,
ILIAS Geneva 29 March 2007 Virgo suspension control progress E. Majorana INFN Mirror Suspension Control workgroup.
Lisa Barsotti - University and INFN Pisa – on behalf of the Virgo Collaboration CASCINA - January 24 th, 2005 ILIAS  Locking of Full Virgo Status of VIRGO.
Status of VIRGO Lisa Barsotti - University and INFN Pisa – on behalf of the VIRGO collaboration ANNECY - December 15 th, 2004  Status of the Commissioning.
Nov 3, 2008 Detection System for AdV 1/8 Detection (DET) Subsystem for AdV  Main tasks and requirements for the subsystem  DC readout  Design for: the.
1 LESSONS FROM VIRGO+ May 17th 2010 E. Calloni for the Virgo collaboration.
M. Mantovani, ILIAS Meeting 7 April 2005 Hannover Linear Alignment System for the VIRGO Interferometer M. Mantovani, A. Freise, J. Marque, G. Vajente.
1 Commissioning meeting, Cascina, LA electronics noise budget ● Sources of electronic noise ● C7 electronic noise ● Electronic noise for optimized.
The VIRGO Suspensions Control System Alberto Gennai The VIRGO Collaboration.
MSC winter, short-term schedule Commissioning meeting Cascina 2 Oct 2006.
The control of the Virgo Superattenuator: present and future Giovanni Losurdo - INFN Firenze/Urbino on behalf of the Virgo Collaboration.
Paolo La Penna ILIAS N5-WP1 meeting Commissioning Progress Hannover, July 2004 VIRGO commissioning progress report.
Gabriele Vajente ILIAS WG1 meeting - Frascati Noise Analysis Tools at Virgo.
Status of Virgo GWDAW12 Status of Virgo GWDAW Dec Leone B. Bosi INFN and University of Perugia (Italy) On behalf of the Virgo Collaboration.
Status of Virgo a short update Michele Punturo. A bit of History July 29 – August –C6 run Duty cycle: Locking 89%, Science Mode 86% September.
Advanced Virgo: Optical Simulation and Design Advanced Virgo review Andreas Freise for the OSD Subsystem.
MSC recent activities COMM Cascina 5 Feb EM-MSC Commissioning-oriented running activity Operation and interface updates Hardware checkup.
Caltech, February 12th1 Virgo central interferometer: commissioning and engineering runs Matteo Barsuglia Laboratoire de l’Accelerateur Lineaire, Orsay.
1 DC readout for Virgo+? E. Tournefier WG1 meeting, Hannover January 23 rd,2007 DC vs AC readout: technical noises Output mode cleaner for DC readout.
1 Frequency Noise in Virgo by Matt Evans. 2 The Actors  Noise Sources  Input Mode Cleaner length noise  Sensing noise on IMC lock  Frequency Servo.
Sensitivity of Virgo E. Tournefier (LAPP-CNRS) LSC-Virgo week May 23 rd,2007 LIGO-G Z.
MSC, focus on: WI ghost noise. 1 “Recent” history and effect July 11 July 22 Aug 1 Jul 28 Aug 1 The disturbance, with us since Dec , had disappeared.
1 ILIAS WG1 meeting, Hannover The 2 nd modulation frequency project.
Advanced SA Specifications & Scientific Motivations S.Braccini, Cascina 21 Settembre 2007.
20/09/2006 EM MSC September /09/2006 EM MSC “activities” (from the web page, by Giovanni) are: - Inertial damping - Local control - Tide control.
(Some) noise hunting issues at Virgo
Status of Virgo GWDAW Dec 13-16
Alignment status & plans
Frequency Noise in Virgo
Weekly meeting Cascina 9 Jan 2007
Thermal lensing effect: Experimental measurements - Simulation with DarkF & Finesse J. Marque (Measurements analysis: M. Punturo; DarkF simulation: M.
5/10/2019 MSC briefing Cascina 11-Dec 2006 wwwwwww.
weekly meeting Cascina 28 Nov 2006
Presentation transcript:

MSC report 14-20 September 25-09-07 weekly meeting EM-MSC-250907

VSR1 breaks Mantenance GIPC, SFR implementations e.m. noise investigations Commissioning Beam Centring on BS Etalon EM-MSC-250907

reconstructed by local DSP GIPC (Global IP Control) + SFR (SeismFreeReconstruction) GIPC: zGC is not crucially affected by Seism (its reference is a suspended mirror) SFR: Sseism is coherent in the central area and reconstructed signals are free from it. deduced from GC zCorr reconstructed by local DSP GC done ! Fabry-Perot cavtiy input mirrors as reference EM-MSC-250907

Top-stage control strategies involving suspension operation as-a-whole The strategy. Top-stage control strategies involving suspension operation as-a-whole improve disturbance rejection capability. EQ GUARD used in monitor mode. SFR (Central Area) GIPC (ARMs) higher cross-over f (lower wind noise without seism re-injection) & Coherent response to EQs ENV-TUNED GUARD Next ! EM-MSC-250907

Performance (in quiet environmental conditions) Spectral check as the new scheme was implemented In quiet conditions no change at the mirror level EM-MSC-250907

A lucky occurrence ! Comparison of two events with similar local amplitude. A lucky occurrence ! 40 m peak Previously we got saturation as the amplitude was less than 20 m MARIO: small residual correction (~7 m) The system is much more robust Dynamics more than doubled EM-MSC-250907

Beam vs BS (centring investigations) Motivated by: control noise coupling, actual BS position ..) STD method: tx,ty 10Hz from RM; x,y slow translation from suspension top; BS tracked keeping aligned the ITF. x B5 B1 W Large H translation z (locked) interesting evidence: B5 changes EM-MSC-250907

Tilt transfer function ty => z vs horizontal position x - 3000 m + 3000 m Coupling ty z worse (170%) B5 better 3 % The system was left at + 3000 m according to this procedure the beam is off-centred by 15 mm tx vs z checked also the beam results to be almost centred (1.5 mm) EM-MSC-250907

Etalon Known relationship among PRCL_NEWE subtraction (beta) and Fabry-Perot finesse asymmetry between Virgo arms (Vajente). Known relationship among beta subtraction and NS-NS Horizon (Tournefier). EM-MSC-250907

Etalon Beta vs asymmetry (B8-B7) Known relationship between the temperature in the ovens, finesse asymmetry and Etalon effect (Punturo). 14/09/07 T_NI B7 Beta too large T_WI Thermal drift into the ovens of NI and WI B8 EM-MSC-250907

Etalon Beta vs asymmetry (B8-B7) Known relationship between the temperature in the ovens, finesse asymmetry and Etalon effect (Punturo). 14/09/07 T_NI B7 Beta decreases T_WI Cm control to GxServer to provide a small heating through LC illuminators (few Watts !!!) B8 EM-MSC-250907

Etalon a simple check to verify that we are actually actuating on Etalon Mirror temperature checked through drum mode freq. vs temperature change driven by LC coarse illuminator. T [C] WI NI Beta can be remotely driven (in simple way ?) 21/09/07 17/09/07 1.5 V 1.3 V e.m. noise investigations into the ovens EM-MSC-250907