Chapter 8 - Project Management

Slides:



Advertisements
Similar presentations
Chapter 7 Project Management
Advertisements

WOOD 492 MODELLING FOR DECISION SUPPORT
Lecture 3 Linear Programming: Tutorial Simplex Method
ECE Longest Path dual 1 ECE 665 Spring 2005 ECE 665 Spring 2005 Computer Algorithms with Applications to VLSI CAD Linear Programming Duality – Longest.
Pure, Mixed-Integer, Zero-One Models
1 Decision Analysis What is it? What is the objective? More example Tutorial: 8 th ed:: 5, 18, 26, 37 9 th ed: 3, 12, 17, 24 (to p2) (to p5) (to p50)
Contents College 4 §4.1, §4.2, §4.4, §4.6 Extra literature on resource constrained project scheduling (will be handed out)
1 Topics to cover in 2 nd part ( to p2). 2 Chapter 8 - Project Management Chapter Topics ( to p3)
1 Transportation Problems Transportation is considered as a “special case” of LP Reasons? –it can be formulated using LP technique so is its solution (to.
Activity networks – Example 1 TaskDuration (hours)Immediate predecessors A3- B4- C6- D5A E1B F6B G7C, D, E The table below shows the tasks involved in.
Project Management An interrelated set of activities with definite starting and ending points, which results in a unique outcome for a specific allocation.
EMGT 501 HW #2 Answer. 020/3 X 3 05/601-1/62/3050/3 X 6 0-5/300-2/3-1/3180/3 (c).3/230with )3/80,0,0,3/50,3/20,0(*)*, ( solution Optimal   Z.
EMGT 501 HW #2 Solutions Chapter 6 - SELF TEST 21 Chapter 6 - SELF TEST 22.
Project Scheduling The Critical Path Method (CPM).
1 1 Slide Chapter 14: Goal Programming Goal programming is used to solve linear programs with multiple objectives, with each objective viewed as a "goal".
MANA 705 DL © Sistema Universitario Ana G. Méndez, All rights reserved. W6 6.2 Operation Management Operation Management Managing Projects Techniques.
Chapter 12 Section 12.1 The Geometry of Linear Programming.
Project Management Chapter 8 (Crashing).
© J. Christopher Beck Lecture 5: Project Planning 2.
Business Mathematics MTH-367 Lecture 15. Chapter 11 The Simplex and Computer Solutions Methods continued.
Welcome to MM305 Unit 6 Seminar Larry Musolino
8-1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall Project Management Chapter 8.
© J. Christopher Beck Lecture 6: Time/Cost Trade-off in Project Planning.
8-1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall Project Management Chapter 8.
Project Planning with PERT and CPM Chapter 14
Project Management Chapter 13 Sections 13.1, 13.2, and 13.3.
1 TCOM 5143 Lecture 11 Project Management. 2 What’s Project Management? Project management involves planning and scheduling the different activities of.
1 TCOM 5143 Lecture 10 Centralized Networks: Time Delay and Cost Tradeoffs.
Chapter 8 - Project Management1 Lecture 2 Today’s lecture covers the followings: 1.To study “project crashing” concept 2.LP formulation for project management.
1 Job Shop Scheduling. 2 Job shop environment: m machines, n jobs objective function Each job follows a predetermined route Routes are not necessarily.
Project Management Chapter 8.
An Introduction to Linear Programming
Project Management Chapter Topics
Project Management: PERT/CPM
Chapter 4 Systems of Linear Equations; Matrices
Chapter 5: Project Time Management Doddy Prayogo, Ph.D.
Transportation Networks CIVE 744
Nonlinear Programming Prepared by Lee Revere and John Large
Project Planning & Scheduling
Project Management (PERT/CPM) PREPARED BY CH. AVINASH
Project Scheduling Models
Activity networks – Example 1
Chapter 5 Linear Inequalities and Linear Programming
Learning Objectives When you complete this chapter, you should be able to : Identify or Define: Work breakdown structure Critical path AOA and AON Networks.
To make a Quadratic Equation, you let the Expression equal zero.
Class 27: Project Management Part II
The minimum cost flow problem
Basic Project Scheduling
L9Matrix and linear equation
Goal programming.
Project Planning & Scheduling
Basic Project Scheduling
Critical Path Analysis (CPA)
Warm Up #10 1.) Graph 5x + 7y =35 2.) Graph y= 2x -3.
UNIT II Scheduling Procedures & Techniques CRITICAL PATH ANALYSIS
§ 4.4 The Natural Logarithm Function.
Introduction to Operations Research
Decision making and Organization Management
ENGINEERING MANAGEMENT (GE 404)
Simple linear equation
Welcome to MM 305 Unit 8 Seminar!
Chapter 3 The Simplex Method and Sensitivity Analysis
NIM - a two person game n objects are in one pile
Analysing the AoA network
LECTURE 3.
Chapter 6 Network Flow Models.
Analysing the AoA network
Unit 30 Functions Presentation 1 Functions, Mappings and Domains 1
Warm Up #20 1.) Graph 5x + 7y =35 2.) Graph 2x -3.
EMIS The Maximum Flow Problem: Flows and Cuts Updated 6 March 2008
Presentation transcript:

Chapter 8 - Project Management Lecture 2 Today’s lecture covers the followings: To study “project crashing” concept LP formulation for project management problem The use of QM (Try it yourself!) Tutorial: Chapter 8: 8th Ed:Q26 and Q30 9tj Ed: Q21 and Q23 (to p2) (to p26) Chapter 8 - Project Management

Project Crashing Basic Concept In last lecture, we studied on how to use CPM to determine solution for a project problem There, we determine its critical path and completion time. Question: Can we cut short its project completion time? If so, how! (to p3) Chapter 8 - Project Management

Project Crashing Solution! Yes, the project duration can be reduced by assigning more resources to project activities But, doing this would somehow increase our project cost! How do we strike a balance? (to p4) Chapter 8 - Project Management

Chapter 8 - Project Management Trade-off concept Here, we adopt the “Trade-off” concept ie, we attempt to “crash” some “critical” events by allocating more sources to them, and also to maintain a balance that the shortening time is not less than the normal activities How to do that: Question: What criteria should it be based on when deciding to crashing critical times? (to p5) (to p11) Chapter 8 - Project Management

Chapter 8 - Project Management Example – crashing (1) Max weeks can be crashed Normal weeks The critical path is 1-2-3, the completion time =11 How? Path: 1-2-3 = 5+6=11 weeks Path: 1-3 = 5 weeks Now, how many days can we “crash” it? 2 6(3) 5 (1) 3 1 5(0) (to p6) Chapter 8 - Project Management

Chapter 8 - Project Management Example – crashing (1) 2 6(3) 5 (1) 3 1 5(0) The maximum time that can be crashed for: Path 1-2-3 = 1 + 3 = 4 Path 1-3 = 0 Total weeks can be crashed = 4 + 0 = 4 Are we to use up all these 4 weeks? (to p7) Chapter 8 - Project Management

Chapter 8 - Project Management Example – crashing (1) 3(0) 4(0) 2 6(3) 5 (1) 3 1 5(0) If we used all 4 days, then path 1-2-3 has (5-1) + (6-3) = 7 completion weeks Now, we need to check if the completion time for path 1-3 has lesser than 7 weeks (why?) Now, path 1-3 has (5-0) = 5 weeks Since path 1-3 still shorter than 7 weeks, we used up all 4 crashed weeks Question: What if path 1-2 has, say 8 week completion time? (to p8) Chapter 8 - Project Management

Chapter 8 - Project Management Example – crashing (1) Such as 2 6(3) 5 (1) 3 1 8(0) Now, we cannot use all 4 days (Why?) Because path 1-2-3 will not be critical path anymore as path 1-3 would now has longest hour to finish Rule: When a path is a critical path, it will stay as a critical path So, we can only reduce the path 1-2-3 completion time to the same time As path 1-2. (HOW?) Chapter 8 - Project Management (to p9)

Chapter 8 - Project Management Example – crashing (1) Solution: 2 6(3) 5 (1) 3 1 8(0) We can only reduce total time for path 1-2-3 = path 1-2, that is 8 weeks If the cost for path 1-2 and path 2-3 is the same then We can random pick them to crash so that its completion Time is 8 weeks (to p10) Chapter 8 - Project Management

Chapter 8 - Project Management Example – crashing (1) Solution: 4(0) 4(1) 2 6(3) 5 (1) 3 1 8(0) 3(0) OR 5 (1) 6(3) 2 1 3 8(0) (to p4) Now, paths 1-2-3 and 1-3 are both critical paths Chapter 8 - Project Management

Chapter 8 - Project Management Time-cost Trade-off In this subject, the decision for “crashing” the project is based on the trade-off between “time and cost” The method is called “Time-cost Trade-off” How it works? We determine an average crash cost for each event How to do that? Procedural step. (to p12) (to p13) Chapter 8 - Project Management

Project Crashing and Time-Cost Trade-Off Example Problem (1 of 3) F= (D-C)/(A-B) E=(A-B) A B D F C Table 8.5 Normal Activity and Crash Data for the Network in Figure 8.16 Note: A,B,C,D are given Note: we will use F values to decide We need to compute E and F which path to crash! (to p11)

Chapter 8 - Project Management Time-Cost Trade-Off Steps: 1. use “normal cost” to determine the critical path 2. for each event, compute their average crash cost 3. for each section of critical path, crash their maximum time by retaining this section be part of the “critical” path. 4. compute total crashing costs and completion time Example (to p14) Chapter 8 - Project Management

Chapter 8 - Project Management Example: trade-off Consider the same example as show in below Step 1 determine it critical path Step 2 determine all average unit crash cost Step 3 crashing events with minimum costs Step 4 compute crashed weeks and costs (to p15) (to p16) (to p17) (to p20) More example! Chapter 8 - Project Management (to p21)

Chapter 8 - Project Management Step 1 Using CPM, the critical path is 1-2-3-4-6-7 (to p14) Chapter 8 - Project Management

Chapter 8 - Project Management Step 2 (to p14) Chapter 8 - Project Management

Section1 Section 2 Section 3 Section 4 Step 3: First, we cluster each segment of critical path into sections that can be crashed and to consider to crash them one section at a time Section1 Section 2 Section 3 Section 4 (to p18)

Section1 Section 2 Section 3 Section 4 Step 3: We now add the normal and crashed time and cost to each segment 8(3) $500 12(3) $$7000 12(5) $400 4(1) $7000 4(1) $3000 4(3) $$200 4(3) $$200 Section1 Section 2 Section 3 Section 4 (to p19)

Section1 Section 2 Section 3 Section 4 Step 3: We now crashed them one section at a time as follows: 5(0) 3(0) 8(3) $500 9(0) 7(0) 12(3) $$7000 12(5) $400 4(1) $7000 4(1) $3000 4(3) $$200 4(3) $$200 Section1 Section 2 Section 3 Section 4 (to p14)

=(5*$400)+(3*$500)+(3*$7000)+(1*$7000)= 31,000 Step 4: We now crashed them one section at a time as follows: 5(0) 3(0) 8(3) $500 9(0) 7(0) 12(3) $$7000 12(5) $400 4(1) $7000 4(1) $3000 4(3) $$200 4(3) $$200 Total crash cost =(5*$400)+(3*$500)+(3*$7000)+(1*$7000)= 31,000 Total crashed weeks= 5+3+3+1=12 Note: critical path is 1-2-3-4-6-7 Completion time = 7+5+0+9+3 = 24 (to p14)

Chapter 8 - Project Management Crashed cost 10(5) 5(4) 1 3 4 4(1) 4(2) 2 How to solve this problem? (to p22) Chapter 8 - Project Management

Chapter 8 - Project Management Further detail steps Determine the critical path Crash the critical path to the level where other non-critical paths become a critical one Consider for further crashing until all possible crashing resources were consumed! (to p23) Chapter 8 - Project Management

Chapter 8 - Project Management Critical path 10(5) 5(4) 1 3 4 4(1) 4(2) 2 The critical path is 1-3-4, completion time is 10+5 = 15 (to p24) Chapter 8 - Project Management

Crash to a level to which other non-critical path is introduced 5(0) 3(2) 10(5) 5(4) 1 3 4 4(3) 4(2) 2 Both critical Paths = 8 The non-critical path is 1-2-4, has the processing time = 4+4 = 8 So, we try to reduce the critical path to this level ! (to p25) Chapter 8 - Project Management

Crash all resources until no further can be reduced! 2(0) 5(0) 3(1) 10(5) 5(3) 1 3 4 4(3) 3(2) 4(2) 2 Both critical Paths = 7 Stop, since no more resources can be reduced in path 1-3-4 (to p1) Chapter 8 - Project Management

Formulating the CPM/PERT Network as a Linear Programming Model - The objective is to determine the earliest time the project can be completed (i.e., the critical path time). normal CPM crashing model (to p27) (to p30) (to p1) Chapter 8 - Project Management

Chapter 8 - Project Management LP formulation General linear programming model is: minimize Z = cixi subject to xj - xi  tij for all activities i  j xi, xj  0 where xi = earliest event time of node i xj = earliest event time of node j tij = time of activity i  j LP formulation for the project management (to p28) Chapter 8 - Project Management

Chapter 8 - Project Management LP for the CPM Let consider a simple problem as outlined as follows: Let xi be denote as each node i And segment of say path 1-2 as x2-x1 Then (to p29) Chapter 8 - Project Management

Chapter 8 - Project Management Objective is Minimize Z = x1 + x2 + x3 + x4 + x5 + x6 + x7 Subject to x2 - x1  12 (for path 1-2) x3 - x2  8 (for path 2-3) x4 - x2  4 (for path 2-4) x4 - x3  0 (for path 3-4) x5 - x4  4 (for path 4-5) x6 - x4  12 (for path 4-6) x6 - x5  4 (for path 5-6) x7 - x6  4 (for path 6-7) xi, xj  0 (to p26) Do you know how to read the results from the LP output? Chapter 8 - Project Management

Chapter 8 - Project Management General concept All formulation of CPM is used, except we need one more variable to represent the crashed cost per unit of each path Example! (to p31) Chapter 8 - Project Management

Consider again the following crashed cost as an example - Objective is to reduce the project duration from 36 to 30 weeks at the minimum possible crash cost. Our objective is to min these We now y to represent these How? Chapter 8 - Project Management (to p32)

Chapter 8 - Project Management Min 400y12 + 500y23 + 3000y24 + 0y34 + 200y45 + 7000y46 + 200y56 + 7000y67 And all yij <= their total allowance crash time A complete model is shown in next slide (to p33) Chapter 8 - Project Management

Chapter 8 - Project Management The CPM/PERT Network as a Linear Programming Model Example Problem Project Crashing - Model Formulation xi = earliest event time of node i xj = earliest event time of node j yij = amount of time by which activity i  j is crashed (i.e., reduced) minimize Z = $400y12 + 500y23 + 3000y24 + 200y45 + 7000y46 + 200y56 + 7000y67 subject to y12  5 y12 + x2 - x1  12 y23  3 y23 + x3 - x2  8 y24  1 y24 + x4 - x2  4 y34  0 y34 + x4 - x3  0 y45  3 y45 + x5 - x4  4 y46  3 y46 + x6 - x4  12 y56  3 y56 + x6 - x5  4 y67  1 x67 + x7 - x6  4 x7  30 xj, yij  0 Max crashing time for critical path i.e. total allowable crashed time New set of equations (to p26) CPM value Chapter 8 - Project Management