Status of ATLAS Resources

Slides:



Advertisements
Similar presentations
DG Research and Innovation
Advertisements

ALICE © | RRB | 17 April 2013 | Catherine Decosse 24 th meeting of the ALICE Resources Review Board CERN-RRB
CERN: important events Restart of the LHC: –First beam on 20 November at 0.45 TeV –First collisions on 23 November, followed by slowly ramping up the beam.
Trigger and online software Simon George & Reiner Hauser T/DAQ Phase 1 IDR.
12 Dec 2005 J. Schukraft1 ALICE USA ALICE position towards US participation EU participation in emcal Requirements Formal steps & schedule.
SG May Total M&O Cat. A budget and detailed expenditure in M&O Cat. A budgets for the coming years - Currencies Exchange Rates Issue: possible.
23 October 2001 RRB-131 Draft Budget for CMS M&O and C&I in 2002 Draft Budget for CMS Maintenance & Operation and Commissioning & Integration in the Year.
RRB Scrutiny Group Meeting A. Charkiewicz, 16 July 2013 M&O Budget Issues.
Barrel Endcap The RPC System Baseline Six stations in the Barrel Four station in the Endcap up to  = 2.1 Baseline Six stations in the Barrel Four station.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt CBM Collaboration meeting Status Interim MoU J. Eschke, GSI.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Financial Matters Ferdinand HAHN. Content Short Reminder: Definition of Maintenance and Operation Fund (MOF) in the MoU MOF in 2011 (Budget – Contributions.
G. Martellotti1CSN1 14 / 10 / 2002 LHCb Category A M&O status for 2002 and estimate for 2003 Report on Common Fund and CORE expenses for RRB Ott.
Draft Budget for M&O 2007 A. Petrilli, RRB-23, October 24, 2006 CERN-RRB Cf. CERN-RRB
Scrutiny Group Meeting, May 30, 2006 A. Petrilli, 24 May 2006.
Status of QUACO project
Status of ATLAS Resources Presentation to RRB Markus Nordberg ATLAS Resources Coordination CERN-RRB
ATLAS Inner Detector MO_B 2012 closure 2013 mid-year status 2014 request H. Pernegger / Pixel PL & ID Resource Coordinator D. Robinson / SCT PL and ID.
LHCbComputing Manpower requirements. Disclaimer m In the absence of a manpower planning officer, all FTE figures in the following slides are approximate.
W.Van Doninck Re-scope TDR August 2008 The forward RPC system (TDR) China Korea Pakistan Gap production Korea Gap production Korea Front-end electronics.
Considerations for the CDR and Strategy Update The current CDR planning focuses on 3 TeV and a downscaled not optimised 500 GeV machine, aiming for completion.
M. Gilchriese Items from Talks U.S. Pixel Meeting Santa Cruz July 2003.
RRB Scrutiny Group Meeting A. Charkiewicz, 11 June 2014 M&O-A and Upgrade Budget Issues.
Update of the Fifth Edition of the IMF’s Balance of Payments Manual ESCWA Workshop on the Compilation of Statistics on Trade in Services Cairo, Egypt February.
IBL Kick-off Meeting – Summary & Issues G. Darbo – INFN / Genova UPO, 21 July 2009 o IBL kick off meeting summary and issues ATLAS Upgrade Project Office.
Status of ATLAS Resources Presentation to RRB Markus Nordberg ATLAS Resources Coordination CERN-RRB
Computing Division FY03 Budget and budget outlook for FY04 + CDF International Finance Committee April 4, 2003 Vicky White Head, Computing Division.
CERN Finance, Procurement and Knowledge Transfer Department / EDMS CERN-RRB CMS Resources Review Board 18 October 2011 Updates to Financial.
RRB scrutiny Report: Muons. Internal scrutiny group for RRB report Internal scrutiny group composition – J. Shank, G. Mikenberg, F. Taylor, H. Kroha,
RPC M & O-B status Pigi Paolucci. Introduction 2008: RPC project budded from the barrel and forward 2009: M&OB token of 5 KCHF (but INFN 163 KCHF) The.
Most Common Fund spending now goes on infrastructure. In the course of next year, essentially all the remaining funds will be spent on finishing the sub-detectors.
News and Misc Didier Contardo, Jeff Spalding UPO 3/2/12 1 UPO 2/2/12 o The MM, cost estimates and reporting o Milestones and scheduling o Chamonix Meeting.
Status of Contributions, Draft Budget Request for 2005 and Outlook for the Longer Term Future Martyn Davenport 8 TH October 2004 CAST FRC-D
U.S. ATLAS Project Manager’s Review with the Project Advisory Panel March 21-22, BNL Introduction Howard Gordon.
IBL TDR G. Darbo / INFN Genova ATLAS CB – October 2010 o TDR of Insertable B-layer ATLAS CB, October 8 th 2010 G. Darbo / INFN - Genova Indico agenda page:
RLSR 16/4/2015 UK Financial Plan & Risks. Content Finances – FY 2014/15 – Cost to Completion Risks – Top level to completion – R9 working space – Summary.
TCDI Project Budget Update François-Xavier Nuiry May 10 th 2015 EN-STI-TCD.
Status of ATLAS Resources Presentation to RRB Markus Nordberg ATLAS Resources Coordination CERN-RRB
1 FP6 – Financial Management and Reporting 1 April 2006 Sofia, Bulgaria.
CLIC-CTF3 accelerated programm meeting – CERN- 19/05/04 1 CLIC-CTF3 accelerated programm Meeting May 19 th 2004 LAL statement P.LAVOCAT LAL Technical Director.
Collaboration Board 27/09/ Next RRB in October - Core and Common Funds in Projected M&O Cat. A budgets for the coming years - Received funds.
Sascha Schmeling & Emmanuel Tsesmelis LHC RRB Scrutiny Group Autumn Meeting August 2009.
Financial Matters Ferdinand HAHN 08/04/ Content Definition of Common Fund (MOF) in MoU MOF in 2010 (Budget – Contributions -Expenses) MOF in 2011.
SLHC – PP Budget April 3rd, 2008 CERN April 2, 2008 M.C.
Organization and Goals for the Workshop
NA5: Policy and International Cooperation
Completion and Pre-Exploitation Costs for the Initial ATLAS Detector
TDAQ Phase-II kick-off CERN background information
Financing of LHC projects and CMS
ATLAS M&O General Comments
CERN R&D plans and Infrastructures
LHC Computing Grid Status of Resources Financial Plan and Sue Foffano
UK Financial Plan & Risks
ALICE Status 4th CERN-Korea meeting
HCAL M&O-B Budget CMS Finance Board
30th meeting of the ALICE RRB C. Decosse
4th FRC meeting, Antti Onnela, CERN-PH-DT
Status of ATLAS Resources
HL Consolidation Day Analysis of needs from BE-ICS
Francesco Forti University and INFN, Pisa
CMS Goal of the experiment
Benoît DAUDIN (GS-AIS-PM – CERN) 22-March-2012
PCC Update 10/28/09 Planning Phase
Health Insurance Exchange Project (HIX)
Update on ATLAS insertable B-layer
UK MoUs and Tier-1/A experiment shares
Proposed Preliminary Budget
ESF Eligibility Rules Tom Whelan ESF Certifying Authority in Ireland.
ATLAS Resources Review Board CERN-RRB April 2019
LHC Computing, RRB; H F Hoffmann
Presentation transcript:

Status of ATLAS Resources CERN-RRB-2012-027 Status of ATLAS Resources Presentation to RRB 24.04.2012 Markus Nordberg ATLAS Resources Coordination

Full Design Luminosity (FDL) 2011 Document CERN-RRB-2012-028 2011 Final payments (Table 1, for approval) TDAQ: contributions 0.9 MCHF Note: As part of the initial TDAQ CORE (2.5 MCHF) Insertable b-layer (IBL) payments 2.4 MCHF, incl. M&O Note: Cost envelope 9.7 MCHF + 0.3 MCHF (DBM), as defined in the IBL-MoU IBL-MoU now in its definite form (CERN-RRB-2012-028 Appendix 1, for endorsement), has been sent to those Funding Agencies involved for signature Pixel SQP repair payments 2.0 MCHF, incl. related M&O support Note: Total approved project envelope is 3.2 MCHF (CERN 1.2 MCHF+ Deferrals 1.9 MCHF)

Full Design Luminosity (FDL) 2012 Document CERN-RRB-2012-028 2012 FDL Budget update (Table 2, for information) TDAQ 0.1 MCHF, completes the initial CORE TDAQ IBL 3.4 MCHF, of which 1.1 MCHF included in M&O SQP 1.8 MCHF, including deferrals and related M&O support

Full Design Luminosity (FDL) Table 3 Document CERN-RRB-2012-028 Table 3, for information only Current status of expression of interest in Phase-1 sub-projects (marked in yellow) Still to be clarified Technology options available Principle of fairness in sharing of costs Available flexibility in allocation of possible contributions across projects Note Final CORE cost figures will be fixed in sub-project specific Technical Design Reports (TDRs) and subsequent MoU CORE Addenda Common Fund part planned to be funded by use of deferrals and extra contribution from CERN Will return next October with an update of the framework for RRB endorsement

2011 M&O-A Final Payments (kCHF) #026: Table 1 2011 M&O-A Final Payments (kCHF) Category A (16.6 MCHF), including NMS-energy Cost drivers by activity Technical services (7.6 MCHF) On-line computing (4.2 MCHF) Note: no use of TDAQ Buffer Account so far (0 CHF) Core computing I&S (2.1 MCHF) Magnet operation (1.7 MCHF Energy NMS part (0.9 MCHF)

2011 M&O-B Final Payments (kCHF) #026: Table 1 2011 M&O-B Final Payments (kCHF) Category B (6.4 MCHF) Cost drivers by activity Electronics (3.8 MCHF) Technical support (1.5 MCHF) Areas, stores (0.5 MCHF) Mechanics, gas (0.3 MCHF) Spares (0.1 MCHF) Operation effort 384 FTE (OTP Class 3), of which 138 FTE core computing effort as in-kind

2013 M&O-A Preliminary Estimates (kCHF) #026: Table 4 2013 M&O-A Preliminary Estimates (kCHF) Category A (17.8 MCHF), including energy Cost drivers by activity Technical services (9.8 MCHF) On-line computing (3.6 MCHF Core computing I&S (2.1 MCHF) Magnet operation (1.6 MCHF) Energy NMS part (0.7 MCHF)

2013 M&O-B Preliminary Estimates (kCHF) #026: Table 4 2013 M&O-B Preliminary Estimates (kCHF) Category B (5.2 MCHF) Cost drivers by activity Technical services, manpower (2.2 MCHF) Electronics replacements, rentals (1.8 MCHF) Spares (0.5 MCHF) Mechanics, areas, stores (0.7 MCHF) Operation effort 462 FTE (OTP Class 3), of which 138 FTE core computing effort as in-kind

Evolution of M&O 2002 – 2018, MCHF Note: M&O (A+B) forecasts are flat, using TDAQ spares as a buffer. So far, not used.

Status of due M&O-A Contributions (April 23, 2012)

Status of due M&O-B Contributions (April 23, 2012)

RRB Invited to Approve 2011 FDL Payments (#028 Table 1) Take note of 2012 FDL Status (#028 Table 2) Take note of status of Phase-1 financial plan (#028 Table 3) Approve M&O 2011 Payments (#026 Tables 1, 2) Take note of M&O 2013 Preliminary Budget Estimates (#026 Tables 4, 5)