0v1.

Slides:



Advertisements
Similar presentations
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
Advertisements

Systems Engineering Approach to MPS Risk Management Kelly Mahoney Presented at the Workshop for Machine Protection in Linear Accelerators.
1 Albrecht Wagner, Snowmass 0805 Albrecht Wagner DESY and Hamburg University Challenges for Realising the ILC.
WAO, Trieste, 24th - 28th September 2007 An Overview of the Reliability and the Fault Trends of the SRS Cheryl Hodgkinson Daresbury Laboratory Synchrotron.
The Iterative Process of Project Planning 13 Structure the project
Consolidation of access systems for the injector Complex ATOP days 4-6 March 2009 P. Ninin & R, Nunes in behalf of the PS and SPS access project teams…
1 WAO 2012 Summary. August 10, 2012 at SLAC Workshop on Accelerator Operations Hosted by SLAC National Accelerator Laboratory & Lawrence Berkeley National.
J.P.DelahayeE-GDE meeting 10/05/061 CERN non EU contribution to ILC J.P.Delahaye.
SJDEVLA Advisory Committee Meeting September 6-7, EVLA Production and Maintenance Steven Durand presenting for the E lectronics Division.
1 Kenneth Osborne, 9/14/07 Inter Group communications at the Advanced Light Source. Overview of the different methods of communication between different.
Q34: Discuss the support of the accelerator community for your technology and to whatever extent your technology has outreach into other accelerator areas?
J. G. Weisend II Deputy Head of Accelerator Projects April 2, 2014 Actions at ACCSYS Resulting from the Recommendations of the Annual Review.
Cryo-Ops 2014 Workshop Goals J. G. Weisend II November 2014.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Edward T. Lessard ESHQ.
TS Workshop, Archamps, May 24 – May 26, 2005 The LHC Access System Status report – May 2005 P. Ninin & the Access project team TS/CSE.
B. Todd et al. 25 th August 2009 Observations Since v1.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
1 Availability and Controls Tom Himel SLAC Controls GG meeting January 20, 2006.
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
ALS Operator Training Rick Bloemhard Operations Supervisor Advanced Light Source Lawrence Berkeley National Lab WAO 2012.
6 th International Workshop on Accelerator Operations Magnus Eriksson ISOLDE CERN.
HEPiX 2 nd Nov 2000 Alan Silverman Proposal to form a Large Cluster SIG Alan Silverman 2 nd Nov 2000 HEPiX – Jefferson Lab.
MICE FAC open session Alain Blondel 1   MICE The International Muon Ionization Cooling Experiment.
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
Jefferson Lab Report Karen S. White 11/14/00. Overview  Status of Jefferson Lab Control System  Work In Progress  Transitioning to Operations.
Maintaining Your Investment Achieving Maximum Performance.
1 BROOKHAVEN SCIENCE ASSOCIATES 2009 DOE Accelerator Safety Workshop BNL S-band LINAC Fire Safety Concerns August 19, 2009 A. Ackerman.
1 The ILC Control Work Packages. ILC Control System Work Packages GDE Oct Who We Are Collaboration loosely formed at Snowmass which included SLAC,
James C. Liu 1 and Lawrence S. Walker 2 1. SLAC National Accelerator Laboratory, CA, USA 2. Brookhaven National Laboratory, NY, USA 1. Introduction ANSI.
Global Design Effort: Controls & LLRF Americas Region Team WBS x.2 Global Systems Program Overview for FY08/09.
I & C.
EDMS Session 2 - Operation at high intensity of the CERN machines ATC/ABOC 21 January ARCON – RAMSES Bridge ATC/ABOC Days CERN – 21 to 23.
Control System Considerations for ADS EuCARD-2/MAX Accelerators for Accelerator Driven Systems Workshop, CERN, March 20-21, 2014 Klemen Žagar Robert Modic.
BEAM INSTRUMENTATION GROUP DEPENDABILITY APPROACH CERN, Chamonix 26th January 2016 William Viganò
Communication Tools Used For Commissioning the 12 GeV CEBAF Accelerator Brian Freeman WAO (Mainz, Germany) October 2014.
Integrated Control Systems Status and Plans Garry Trahern Head of ICS Division TAC 9, 3 rd April, 2014, ESS, Lund.
Andreas Lüdeke, Trieste, 24. Sep., WAO '07 Operation Information Management at the Swiss Light Source Andreas Lüdeke of the Swiss Light Source at the Paul.
Reliability and Performance of the SNS Machine Protection System Doug Curry 2013.
CERN participation in EU project CREMLIN CERN-internal introduction meeting July 17 th 2015 Lucie Linssen.
Registered participants participants from outside Cern.
LS2 Safety Preparation Thomas Otto, LS2 Safety Support Officer for LHC
Monday 11 April BUS DEPARTS FROM BWL AT 07:30 SHARP
Corrective and Preventive Maintenance at NSCL
Accelerator Safety Workshop – 2017 U. S
ESS Innovation Procurement Workshop
LubeWatch® Oil Analysis Program
Software Project Configuration Management
MAINTENANCE ENGINEERING
Machine operation and daily maintenance management in SOLEIL
Safety Instrumented Systems
Do you believe in Operation Statistics
SLAC Accelerators Power Electronic System Operation for Reliability
SNS Status Report Karen S. White 10/15/08.
June 22, 2017 Burkhard Schmidt for the DT coordination team
Jefferson Lab Reliability Task Force and Initiatives
The ILC Control Work Packages
Safety Instrumented Systems
HP Toll Free Number
Low temperature chiller Market Survey
Vibration Measurement, Analysis, Control and Condition Based Maintenance 14 Predictive maintenance Dr. Michiel Heyns Pr.Eng. T: C: +27.
Get HP Tech Support Get HP Tech Support
The Fermi National Accelerator Laboratory is a U. S
What Do I Want from an RDB?
Welcome to WAO 2012.
LERF Readiness Review: Charge
DIMETRA™ EXPRESS SYSTEM SERVICES
Elettra – Sincrotrone Trieste S.C.p.A.
Operation of Target Safety System (TSS)
Review of hardware commissioning
IT 19 SF 20 IT 19 SF 20 Bert Manzlac Enrico Cennini Andreas Hoppe
Presentation transcript:

0v1

1. ARW Overview 2. Relevant Outcomes 3. Personal Opinion Who? Where? What 2. Relevant Outcomes Accelerator Community CERN Machine Protection 3. Personal Opinion Accelerator Reliability Workshop 2009

1. ARW Overview 2. Relevant Outcomes 3. Personal Opinion Who? Where? What 2. Relevant Outcomes Accelerator Community CERN Machine Protection 3. Personal Opinion Accelerator Reliability Workshop 2009

Accelerator Reliability Workshop 2009

Attendees Accelerator Eng. Corp. (Japan) x4 AccSys Technology, Inc . (USA) 1 Australian Synchrotron Brookhaven National Lab (USA) x3 Canadian Light Source CERN x2 CNSC (CANADA) DESY (Germany) Diamond Light Source (UK) Euro. Synch. Radiation Facility (Fra.) Fermi Lab (USA) Indiana Univ. Cyclotron Facility Institut Curie (Fra.) Instrumentation Tech. (Slovenia) ISIS, RAL (UK) JASRI/SPring-8 (Japan) Jefferson Lab (USA) KEK (Japan) 1 Lawrence Berkeley National Lab LNL-INFN (Italy) National Inst. of Radiological (Japan) x3 NSCL @ Michigan State University x2 NSRRC (Taiwan) Paul Scherrer Institut (Switz.) Pohang Accelerator Lab. (Korea) Sincrotrone Trieste S.C.p.A. (Italy) SLAC National Accelerator Lab. x5 SNS/Oak Ridge National Laboratory Spallation Neutron Source / ORNL St James Software (S.A.) Synchrotron SOLEIL (France) UPC (Spain) Uppsala University (Sweden) TRIUMPH (Canada) 31 Accelerator Reliability Workshop 2009

Program Monday: Experience/Achievements to Date (4 talks) Refurbishments and Up-grades (4) Quality Assurance (2) Tuesday: Engineering & Design for Reliability (6) Hardware Reliability - System Expert Reports (4) Poster session Wednesday: Software Reliability - Automated Routines (8) Tour of TRIUMF Thursday: Failure Analysis (4) / Human Factors (4) Operations Management (4) / Maintenance (3) Friday: How Radiation affects Reliability (3) Closing session Accelerator Reliability Workshop 2009

Program Monday: Experience/Achievements to Date (4 talks) Refurbishments and Up-grades (4) Quality Assurance (2) Tuesday: Engineering & Design for Reliability (6) Hardware Reliability - System Expert Reports (4) Poster session Wednesday: Software Reliability - Automated Routines (8) Tour of TRIUMF Thursday: Failure Analysis (4) / Human Factors (4) Operations Management (4) / Maintenance (3) Friday: How Radiation affects Reliability (3) Closing session Accelerator Reliability Workshop 2009

1. ARW Overview 2. Relevant Outcomes 3. Personal Opinion Who? Where? What 2. Relevant Outcomes Accelerator Community CERN Machine Protection 3. Personal Opinion Accelerator Reliability Workshop 2009

Reliability Definition Actual operating hours divided by expected operating hours Doug Preddy, Triumf Availability = Time_Operational / Total_Time Reliability = Time_Operational / Total_Time + Down_Time Reda Tafirout, Triumf Time is a very important part of the reliability definition: Expected uptime, repair and maintenance times, idle time, and unplanned occurrences all [contribute] Experience is one of the main influences [in improving reliability] Accelerator Reliability Workshop 2009

Other Talks BASIC RELIABILITY THEORY … ~ 50% relevant to CERN = interesting points …. … Two / Three sentence of each … BASIC RELIABILITY THEORY FAULTS and RELIABILITY in the OPERATION of PLS JLAB / NSCL EXPERIENCE to DATE & AVAILABILITY LESSONS LEARNED from 16 YEARS HERA OPERATION JEFFERSON LAB REFURBISHMENTS and UPGRADES GENERAL RELIABILITY at RHIC ADAPTIVE MAINTENANCE based on RELIABILITY POST-MORTEM DIAGNOSIS for TAIWAN LIGHT SOURCE HUMAN PERFORMANCE MAINTAINING RELIABILITY : TRIUMF POWER INTERRUPTIONS SNS MAINTENANCE MANAGEMENT at SNS TRIUMF RADAITION RELIABILITY ISSUES Etc… Accelerator Reliability Workshop 2009

LHC Reliability Quantify Baseline LHC reliability? hours of machine operation expected in a year. Time @ Physics? luminosity @ physics? Lum. + Energy + Time? Assign $ value to unforeseen stoppages? institutes assign 25-100k$ lost per hour of unforeseen stoppages. Risk of sudden floor fracture? LHC dipoles masses = LEP? floor designed to hold weight? Root Cause Analysis for every failure? complete understanding (mitigations) for all faults. TAPROOT. Reliability DB for failure tracking? Weibull mechanism = very good scope for failure tracking. CERN repository of proven design practices? influence future designs – at CERN – beyond LHC. Accelerator Reliability Workshop 2009

Hot-Swappable Equipment? RF / PCs / Cooling RF, Powering and Cooling Reliability = weaknesses everyone is fighting. How reliable are these in LHC? Documents / FMEA / Calculations made? Built for ‘Maintainability’? Preventive Maintenance Scheduled? N.B. Running through a shutdown = NO preventive maintenance… Hot-Swappable Equipment? Environmental Monitoring? Of buildings which house PCs and Heavy Machinery Air Flow Models? Model air flow? Or trial-and-error? Or rule-of-thumb? Diversity of Staff? For all equipment = more than one expert = several experts. Accelerator Reliability Workshop 2009

work done by CERN duplicated in other labs, and vice versa Collaborations work done by CERN duplicated in other labs, and vice versa SLAC Hot Swap Power Converter technology? involved in ATCA? VME replacement bus architecture 0.99999 reliable Considering RIOC? redundant IO channel for RIOC and others Certified ‘logbook’ software SJ Soft? 10/9 logbook erased… ORNL should see MTF and EDMS CERN should advertise the RADMON CERN could help TRIUMF with cables for radiation Accelerator Reliability Workshop 2009

1. ARW Overview 2. Relevant Outcomes 3. Personal Opinion Who? Where? What 2. Relevant Outcomes Accelerator Community CERN Machine Protection 3. Personal Opinion Accelerator Reliability Workshop 2009

Operator Screens for example, should be considering ‘Human Factors’ Personal Opinion subjective! LHC MPS Dependability Analysis beyond anyone else’s No-one showed anything close No-one mentioned anything after my talks Right people may not have been there Next Gen (ILC etc) starting with reliability specification CERN’s work = very relevant Extend LHC MPS Study = beyond safety let’s figure out what LHC reliability could be Human Factor’s = Very Interesting Humans Operating – Man-Machine Interface Humans Designing – team-work, design is always subjective Operator Screens for example, should be considering ‘Human Factors’ Accelerator Reliability Workshop 2009

More Personal Opinion VERY subjective! September 10th Quite a few questions in coffee times Cost of repair > some institute’s annual budget… Some knew more than me about what happened… N.B Lessons learned are THE method for improving systems. One thing which troubles me: US = Department of Energy is there… CAN = Nuclear Regulation for everything… we are lucky… So far… No hands on regulation… Accelerator Reliability Workshop 2009

Next Steps Much higher CERN involvement in next Accelerator Reliability Workshop? In taking account of many aspects such as: Software Interlocks, Post-Mortem, EDH, EDMS, MTF, Powering, Cooling, Radiation Management, Personnel Safety, Logging, Analysis, Human Interface … Dedicated session to safety systems should be foreseen rest of industry fighting same battles => future projects (ILC, CLIC, ITER) need the same / similar systems. Workshop partnered with Workshop on Accelerator Operations (WAO) WAO 2010 is next ARW 2011? Could be organised by CERN? Accelerator Reliability Workshop 2009

And then… \\cern.ch\dfs\Users\b\btodd\Public\ARW2009\ARW2009_ROC_0v2.doc http://www.triumf.info/hosted/ARW/index.htm Accelerator Reliability Workshop 2009

FIN Accelerator Reliability Workshop 2009