EOQ for Production not Order (EPQ)

Slides:



Advertisements
Similar presentations
Operations Research Inventory Management.
Advertisements

Assignment Ch12a.1 Problem 1: A toy manufacturer uses approximately silicon chips annually. The Chips are used at a steady rate during the 240 days.
Operations Management
EOQ for Production not Order (EPQ) We do not buy the product. We produce it. Total demand / year is D Demand / day or consumption rate is u Production.
Inventory Modeling Concepts
Inventory Control Chapter 17 2.
INVENTORY Based on slides for Chase Acquilano and Jacobs, Operations Management, McGraw-Hill.
Chapter 13 - Inventory Management
12 Inventory Management.
1 Chapter 15 Inventory Control  Inventory System Defined  Inventory Costs  Independent vs. Dependent Demand  Basic Fixed-Order Quantity Models  Basic.
Topic 6. INVENTORY MANAGEMENT
Operations Management
Managerial Decision Modeling with Spreadsheets
Inventory Management A Presentation by R.K.Agarwal, Manager (Finance), PFC.
Chapter 11, Part A Inventory Models: Deterministic Demand
Dr. Mohamed A. Hamada Lecturer of Accounting Information Systems 1-1 PRACTICAL CASES ON CH 6 Inventory Management.
Chapter 9 Inventory Management.
C 11 Inventory Management
Assignment Ch12(c) The Dine Corporation is both a producer and a user of brass couplings. The firm operates 220 days a year and uses the couplings at a.
Assignment; Basic Inventory Model
Inventory Control Models
FOR INDEPENDENT DEMAND
Lecture 5 Project Management Chapter 17.
Operations Management Inventory Management Chapter 12 - Part 2
Assignment Ch12(b) A small manufacturing firm uses approximately 3400 pounds of chemical dye per year. Currently the firm purchases 300 pounds per order.
Chapter 13 - Inventory Management
Inventory Models Production Lot Size Models. PRODUCTION LOT SIZE MODELS In a production lot size model, we are a manufacturer, trying to determine how.
1 Operations Management Inventory Management. 2 The Functions of Inventory To have a stock of goods that will provide a “selection” for customers To take.
Chapter 12: Inventory Control Models
MNG221- Management Science –
Management Accounting for Business
Assignment 4: Part (A) Problem 1: A toy manufacturer uses approximately silicon chips annually. The Chips are used at a steady rate during the 240.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 12 Inventory Management.
Ordering and Carrying Costs
Inventory Management Chapter 13.
BA 301 Operations Management Spring 2003 Inventory Management Chapter 12 Continued.
Economic Order Quantity
13-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
CHAPTER 7 INVENTORY MANAGEMENT
Inventory Inventory is the stock of goods, commodities or other economic resources that are stored for the smooth and efficient running of a business.
___________________________________________________________________________ Operations Research  Jan Fábry Inventory Models EOQ Model with Planned Shortages.
Copyright 2011 John Wiley & Sons, Inc. Chapter 9 Inventory Management 9-1.
Mohamed Iqbal Pallipurath12 – 1 Operations Management Inventory Management Mohamed Iqbal Pallipurath Industrial Management,
Costs involved in Inventory Models Ordering (Setup) cost Unit purchasing (Production) cost Holding (Carrying) cost Shortage (Penalty) cost Revenue (Selling.
The Economic Production Quantity (EPQ) Model
BUAD306 Chapter 13 - Inventory Management. Everyday Inventory Food Gasoline Clean clothes… What else?
What types of inventories business carry, and why they carry them.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 12 Inventory Management.
Chapter 6 Inventory Control Models 6-1
Chapter 13 - Inventory Management
Inventory Models Assumptions of EOQ model Shortages are allowed
Example ( In terms of Percentage)
BUSI 104 Operations Management
Lecture 23 Order Quantities
EOQ Model 2/26/2016.
Assignment 5: Part (A) The Dine Corporation is both a producer and a user of brass couplings. The firm operates 220 days a year and uses the couplings.
Stevenson 13 Inventory Management.
Chapter 13 - Inventory Management
12 Managing Inventory PowerPoint presentation to accompany
12 Inventory Management PowerPoint presentation to accompany
The Economic Order Quantity
INVENTORY Inventory is the stock of any item or resource used in an organization and can include: raw materials, finished products, component parts, supplies-in-transit.
DPT 335 PRODUCTION PLANNING & CONTROL
HW # Due Day: Nov 30.
12 Managing Inventory PowerPoint presentation to accompany
EOQ Model Economic Order Quantity
EOQ Inventory Management
a) Total cost of the current policy
PRODUCTION PLANNING AND PROCESS PLANNING
What about −(−6) ? What quantity is in the box?.
Presentation transcript:

EOQ for Production not Order (EPQ) We do not buy the product. We produce it. Total demand / year is D Demand / day or consumption rate is u Production rate is p / day

Example A toy manufacturer uses 48000 parts for one of its products. Consumption rate is uniform throughout the year. Working days are 240 / year. The firm can produce at a rate of 800 parts / day Carrying cost is $1 / part / year Setup cost for production run is $45 / setup What is the optimal production size?

Example

Instantaneous and Incremental Replenishment Instantaneous Replenishment Incremental Replenishment

EPQ: Incremental Replenishment (Production and Consumption) p-u p u u × ( number of working days ) = D = Total demand per year

EPQ: One period and One year p-u u One Period One Year

EPQ: Ordering Cost and Carrying Cost I max If I can state Imax in terms of Q, then I am done. I can easily find Economic Quantity.

EPQ : Production & Consumption; rate & time How much do we produce each time? Q How long does it take to produce Q? d1 What is our production rate per day? p How long does it take to consume Q? d1 +d2 What is our consumption rate per day ? u p-u u I max d1 d2

EPQ : Optimal Q

Example A toy manufacturer uses 48000 parts for one of its products. Consumption rate is uniform throughout the year. Working days are 240 / year. The firm can produce at a rate of 800 parts / day Carrying cost is $1 / part / year Setup cost for production run is $45 / setup What is the optimal production size?

What is Run Time, What is Cycle Time

What is the Optimal Total Cost

ROP If setup time takes 2 days, at which level of inventory we should start setup? 2(200) = 400

Practice A company has a yearly demand of 120,000 boxes of its product. The product can be produced at a rate of 2000 boxes per day. The shop operates 240 days per year. Assume that demand is uniform throughout the year. Setup cost is $8000 for a run, and holding cost is $10 per box per year. a) What is the demand rate per day b) What is the Economic Production Quantity (EPQ) c) What is the run time d) What is the maximum inventory e) What is the total cost of the system

Assignment 4.3b What is the demand rate per day Demand per year is 120,000 there are 240 days per year Demand per day = 120000/240 = 500 u = D/240 = 500 b) What is the Economic Production Quantity (EPQ) =16000

Assignment 4.3b c) What is the run time We produce 16000 units Our production rate is 2000 per day It takes 16000/2000 = 8 days d1 = EPQ/p = 8 days d) What is the maximum inventory We produce for 8 days. Each day we produce 2000 units and we consume 500 units of it. Therefore we add to our inventory at rate of 1500 per day for 8 days. That is Imax = 8(1500) = 12000 Imax = pd1 = 8(1500) = 12000

Assignment 4.3b e) What is the total cost of the system

Assignment 12.c Problem : The Dine Corporation is both a producer and a user of brass couplings. The firm operates 220 days a year and uses the couplings at a steady rate of 50 per day. u = 50. Couplings can be produced at rate of 200 per day. p=200. Annual storage cost is $1 per coupling, H=1, and machine setup cost is $35 per run, S=35. Since there are 220 days per year and u is equal to 50, yearly demand is 50(220), D= 11000. Determine the economic run size. Approximately how many runs per year will there be? Compute the maximum inventory level. Determine the cycle time, run time and pure consumption time. Compute the total cost.