Forecast Verification

Slides:



Advertisements
Similar presentations
INITIAL CONDITION: 31 May 2014 Extended range prediction during 2014 season Extended range prediction during 2014 season Using CFS based Grand Ensemble.
Advertisements

September 10, 2013SEASONAL AND EXTENDED RANGE PREDICTION GROUPSlide 1 Forecast Verification.
Extended range prediction during 2013 season Using Ensemble Prediction System based in CFSv2 And GFSv2 forced with Bias corrected CFSv2 forecasted SST.
Potential Predictability and Extended Range Prediction of Monsoon ISO’s Prince K. Xavier Centre for Atmospheric and Oceanic Sciences Indian Institute of.
Forecast Verification Working group on Extended Range Prediction Ministry of Earth System Sciences, India.
Weiming Sha and Guixing Chen Tohoku University, Japan 1st MAHASRI/AMY WS Yokohama/Tokyo, Study on Monsoon Onset in South China (Huanan area)
Dr. K.K. Singh Head, Agromet
DisclaimerDisclaimer The material contained in this PPT is a raw model output and research product. This is meant for scientific use. For any clarification/interpretation,
India summer monsoon rainfall in ECMWF Sys3 – ICTP, August Indian summer monsoon rainfall in the ECMWF seasonal fc. System-3: predictability and.
Monsoon Desk at NCEP NOAA/NWS/NCEP/EMC National Monsoon Mission Scoping Workshop April 11-15, 2011.
DisclaimerDisclaimer The material contained in this PPT is a raw model output and research product. This is meant for scientific use. For any clarification/interpretation,
11 Predictability of Monsoons in CFS V. Krishnamurthy Center for Ocean-Land-Atmosphere Studies Institute of Global Environment and Society Calverton, MD.
DisclaimerDisclaimer The material contained in this PPT is a raw model output and research product. This is meant for scientific use. For any clarification/interpretation,
September 4, 2013SEASONAL AND EXTENDED RANGE PREDICTION GROUPSlide 1 Forecast Verification.
Franco Molteni, Frederic Vitart, Tim Stockdale,
DisclaimerDisclaimer The material contained in this PPT is a raw model output and research product. This is meant for scientific use. For any clarification/interpretation,
1. Introduction 2. The model and experimental design 3. Space-time structure of systematic error 4. Space-time structure of forecast error 5. Error growth.
1 The Asian-Australian Monsoon System: Recent Evolution, Current Status and Prediction Update prepared by Climate Prediction Center / NCEP May 27, 2014.
1 The Asian-Australian Monsoon System: Recent Evolution, Current Status and Prediction Update prepared by Climate Prediction Center / NCEP June 03, 2013.
1 The Asian-Australian Monsoon System: Recent Evolution, Current Status and Prediction Update prepared by Climate Prediction Center / NCEP June 09, 2014.
Yuhei Takaya, JMA. Dehradun Ground Observations Dehradun [78E, 30N] max. temp. ave. temp.precip. Temperature (deg C) daily accumulated precip. (mm) 358.
DisclaimerDisclaimer The material contained in this PPT is a raw model output and research product. This is meant for scientific use. For any clarification/interpretation,
DisclaimerDisclaimer The material contained in this PPT is a raw model output and research product. This is meant for scientific use.
DisclaimerDisclaimer The material contained in this PPT is a raw model output and research product. This is meant for scientific use.
September 14, 2013SEASONAL AND EXTENDED RANGE PREDICTION GROUPSlide 1 INITIAL CONDITION 13 th September 2013 Extended range prediction during 2013 season.
The South American Monsoon System: Recent Evolution and Current Status Update prepared by Climate Prediction Center / NCEP 4 June 2012 For more information,
September 4, 2013SEASONAL AND EXTENDED RANGE PREDICTION GROUPSlide 1 Forecast Verification.
DisclaimerDisclaimer The material contained in this PPT is a raw model output and research product. This is meant for scientific use.
CES/SNU AGCM Intercomparison Project WCRP/CLIVAR Predictability of SST forced signals in ensemble simulations of multiple AGCMs during El Niño.
LONG RANGE FORECAST SW MONSOON
Dr. P.V.Joseph Professor Emeritus Department of Atmospheric Sciences
LONG RANGE FORECAST SW MONSOON
Disclaimer The material contained in this PPT is a raw model output and research product. This is meant for scientific use.
Disclaimer The material contained in this PPT is a raw model output and research product. This is meant for scientific use.
LONG RANGE FORECAST SW MONSOON
The South American Monsoon System: Recent Evolution and Current Status
Makarand A. Kulkarni Indian Institute of Technology, Delhi
National Monsoon Mission Scoping Workshop April 11-15, 2011
Shuhua Li and Andrew W. Robertson
Disclaimer The material contained in this PPT is a raw model output and research product. This is meant for scientific use. For any clarification/interpretation,
Disclaimer The material contained in this PPT is a raw model output and research product. This is meant for scientific use. For any clarification/interpretation,
Economic Advisor, IMC and
Disclaimer The material contained in this PPT is a raw model output and research product. This is meant for scientific use. For any clarification/interpretation,
Seasonal Predictions for South Asia
Forecast Verification
Disclaimer The material contained in this PPT is a raw model output and research product. This is meant for scientific use.
Forecast Verification
Disclaimer The material contained in this PPT is a raw model output and research product. This is meant for scientific use. For any clarification/interpretation,
Forecast Verification
Prediction of Extreme Heat Real-time forecast based on 20th June 2016
Lindsey Long and Jae Schemm NOAA/NWS/NCEP/CPC
Forecast Verification
This is meant for scientific use only.
This is meant for scientific use only.
This is meant for scientific use only.
This is meant for scientific use only.
This is meant for scientific use only.
This is meant for scientific use only.
This is meant for scientific use only.
This is meant for scientific use only.
This is meant for scientific use only.
This is meant for scientific use only.
This is meant for scientific use only.
This is meant for scientific use only.
This is meant for scientific use only.
This is meant for scientific use only.
Massimo A. Bollasina and Collaborators
This is meant for scientific use only.
Fig. 1 a) All-India Summer (JJAS) Monsoon rainfall anomalies (% of mean) during The 31-yr sliding mean of the anomalies is shown in.
This is meant for scientific use only.
Presentation transcript:

Forecast Verification Working group on Extended Range Prediction Ministry of Earth System Sciences, India

Forecast of Monsoon Onset over Kerala Based on 16 May 2013: 29 May 2013 Onset declared by IMD: 1st June 2013 Onset date forecasts are obtained from each 11 member of CFSv2 45 day forecast. Then ensemble mean is given as the final forecasted onset date. Y axis on each panel is in mm/day for rainfall (bars) and m/s for 850hPa wind(green line). Red circle is the onset date and also written at the top of each panel

NCEP/TRMM Analysis Wind (850hPa) and R/F Verification F/C from 16May IC F/C from 16May IC CFSv2 GFSbc

NCEP/TRMM Analysis Wind (850hPa) and R/F Verification F/C from 26May IC F/C from 26May IC CFSv2 GFSbc

Spatial pentad mean pattern

Obs pentad mean r/f total (mm/day) For period 1-5 June, 2013 Forecast valid For period 1-5 June, 2013 P1-lead, IC 31May P2-lead, IC 26May P3-lead, IC 21May P4-lead, IC 16May CFS GFSbc

Obs pentad mean anomaly(mm/day) For period 1-5 June, 2013 Forecast valid For period 1-5 June, 2013 P1-lead, IC 31May P2-lead, IC 26May P3-lead, IC 21May P4-lead, IC 16May CFS GFSbc

Obs pentad mean r/f total (mm/day) For period 6-10 June, 2013 Forecast valid For period 6-10 June, 2013 P1-lead, IC 5Jun P2-lead, IC 31May P3-lead, IC 26May P4-lead, IC 21May CFS GFSbc

Obs pentad mean anomaly(mm/day) For period 6-10 June, 2013 Forecast valid For period 6-10 June, 2013 P1-lead, IC 5June P2-lead, IC 31May P3-lead, IC 26May P4-lead, IC 21May CFS GFSbc

Obs pentad mean r/f total (mm/day) For period 11-15 June, 2013 Forecast valid For period 11-15 June, 2013 P1-lead, IC 10June P2-lead, IC 5June P3-lead, IC 31May P4-lead, IC 26May CFS GFSbc

Obs pentad mean anomaly(mm/day) For period 11-15 June, 2013 Forecast valid For period 11-15 June, 2013 P1-lead, IC 10June P2-lead, IC 5June P3-lead, IC 31May P4-lead, IC 26May GFSbc CFS

Obs pentad mean r/f total (mm/day) For period 16-20 June, 2013 Forecast valid For period 16-20 June, 2013 P1-lead, IC 15June P2-lead, IC 10June P3-lead, IC 5June P4-lead, IC 31May CFS GFSbc

Obs pentad mean anomaly(mm/day) For period 16-20 June, 2013 Forecast valid For period 16-20 June, 2013 P1-lead, IC 15June P2-lead, IC 10June P3-lead, IC 5June P4-lead, IC 31May CFS GFSbc

Obs pentad mean anomaly(mm/day) For period 21-25 June, 2013 Forecast valid For period 21-25 June, 2013 P1-lead, IC 20June P2-lead, IC 15June P3-lead, IC 10June P4-lead, IC 5June P

Obs pentad mean anomaly(mm/day) For period 21-25 June, 2013 Forecast valid For period 21-25 June, 2013 P1-lead, IC 20June P2-lead, IC 15June P3-lead, IC 10June P4-lead, IC 5June P

Obs pentad mean anomaly(mm/day) For period 26-30June, 2013 Forecast valid For period 26-30 June, 2013 P1-lead, IC 25June P2-lead, IC 20June P3-lead, IC 15June P4-lead, IC 10June

Obs pentad mean anomaly(mm/day) For period 26-30June, 2013 Forecast valid For period 26-30 June, 2013 P1-lead, IC 25June P2-lead, IC 20June P3-lead, IC 15June P4-lead, IC 10June

CFS-GFS Forecast Verification Over Homogenous Regions MZI, CEI, NEI, NWI & SPI

CFS, CEI

GFSbc, CEI

CFS, MZI

GFSbc, MZI

CFS, NEI

GFSbc, NEI

CFS, NWI

GFSbc, NWI

CFS, SPI

GFSbc, SPI

MISO F/C Verification FOR 25 DAYS 16 May IC 21 May IC

MISO F/C verification For 25 Days 26 May IC 31 May IC

MISO F/C verification For 25 Days 10 Jun IC 5 Jun IC (OBS is for 20 days only)