S&TT structure 13 September 2017.

Slides:



Advertisements
Similar presentations
Proposed HR Operational Plan 2011 An Overview HR User Group Meeting 21 July 2011 Nigel Waugh Director of HR.
Advertisements

California Child Welfare Co-Investment Partnership Children’s Conference Monterey, California May 29, 2008.
Operationalisation of the Regional Cooperation Framework Presentation by Jean-Noël Wetterwald, UNHCR Regional Representative and Regional Coordinator for.
Regional Implementation Plan for the Global Strategy to Improve Agricultural and Rural Statistics in Asia and the Pacific - From global strategy to national.
21 September 2004, Roodeplaat Sub-Directorate: Systems Analysis Directorate: Planning Systems Socio-Economic & Supporting Water Resource Planning Systems.
"The role of Rural Networks as effective tools to promote rural development" TAIEX/Local Administration Facility Seminar on Rural Development Brussels,
A cooperation between RFC Rhine-Alpine – cooperation for improved international services and growth on rail Christiane Warnecke Managing Director May 2017.
Priorities of ISO Contents About ISO ISO Strategy
Social Services & Well-being (Wales) Act Andrew Bell, SSIA
Czech-Slovak Corridor
Towards a Strategy for the implementation of the SEEAW
Harvard CRM Service Strategy
Redesign of the International Timetabling Process (TTR)
Strategic Management & Planning
PCS Technical Board Vienna, 28th February 2017.
TAF/TAP workshop Brussels, September 2017.
The Sixth Committee Bradford Smith 11/10/2018.
TTR IT Implementation Capacity Offer/Request/Allocation
The Strategic Information Technology Formulation
Non-RU Applicant (NRA), PCS UG
RFC Short Term Path Request Pilots
Current activities Vienna, 10th May 2017.
Content Management System
SIS Modernization project
Learning and Development (L&D) Governance Structure (Appendix 1)
Redesign of the International Timetabling Process (TTR)
Revision of the Governance model
Removal of national particularities, PCS UG
Eurostat context for international statistical cooperation
PCS Technical Board 17th October 2017, Vienna.
UN Development Account Project on Improvement of Disability Statistics
Temporary Capacity Restrictions: TCR WG & TCR tool
Redesign of the International Timetabling Process (TTR)
PCS Outlook PCS User Group 12th September 2018, Vienna.
PCS Minor Release th February 2018, PCS UG.
PCS CCB Group 22nd February, 2017.
PaP Publication strategy TT2019 – Combined PaP
Redesign of the International Timetabling Process (TTR)
PCS Day - Feedback 23th November 2016, Vienna.
Development roadmap PCS Day 2017.
IT Transformation: Strategic Plan & Pilot Public Education Department
IT Support for TTR Pilots
Removal of national particularities
PCS User Group 15th February, 2017.
PCS User Group Vienna, 13th September 2017.
Retrospective report of the past year
CORA ESSNet COmmon Reference Architecture starting ...
PCS Groups and Boards PCS Day 2016
TTR IT Landscape PCS-TTR Day Vienna, 21 November 2018.
PaP Product Definition
Taskforce „TT Quality“: Report from First Workshop (short)
TSI Compliant PCS Mandatory Interface
Agenda Item No. 26 INTOSAI Community Portal
Main steps in designing a national qualifications framework
PCS Envelope Concept Status of the project
Gemini Code Contingency Review
CAPACITY strategy & MODEL atlantic 2020 PILOT
RFC Short Term Path Request developments
PCS Team Introduction 22 November 2017.
Adrian Stephens nominee statement for Working Group Chair
Survey results “National requests in PCS”
Customer Visit TT2020 Standard Presentation
Annex A1.6.2b RU access to OBI RNE General Assembly 16 May 2018.
Customer Visit TT2020 Standard Presentation
ESTP Course on the EGR November 2015 Introduction.
Expert Forum for producers and users of climate change-related statistics Introduction to Session September 2015.
Developments Confirmation by the CCB that the TAF TSI components have been successfully implemented into PCS Confirmation by the CCB that PCS has been.
TT Quality monitoring on borders
Common strategy development process I
IAEA - Department of Nuclear Safety & Security
Presentation transcript:

S&TT structure 13 September 2017

S&TT: Joint Office TT Staff Joachim Kroll RNE Secretary General Philipp KOISER Sales & TT Manager, TTR programme manager Harald Reisinger RNE CIO TT Process and back office TT IT Gerald BURGSTEINER TT & TCR Manager Mario TOMA Senior TT IT Manager Michaela MÁCOVÁ TTR Assistant Máté BAK Head of PCS Jakob LINDSBERGER TTR Communications Manager Jorge CAMPO PCS Functional Manager Michał MIZGAŁA TT PCS Assistant

S&TT Projects 2017 TTR Steering Committee and PMO Sales & TT Manager TTR: Process implemen-tation Short term RFC product TCR: Workflow implemen-tation TTR Steering Committee and PMO Sales & TT Manager TTR: Pilots TCR: Tool TTR: Commercial Conditions & Priority Rules PCS Empty Envelope Concept TTR: IT Landscape PCS: Frozen Zones TTR: Legal framework ITNDB ad hoc PaP Product Definition: PCS Developments

Overview of RNE Sales & Timetabling Groups Strategy level Sales & TT HLG High level managers from all IMs/ABs Proposals Decisions RNE MB / GA TCR WG Business experts from all IMs/ABs Sales & TT WG Business experts from all IMs/ABs Proposals Decisions Process IT/PCS TT Support Group Business experts from various IMs/ABs PCS Change Control Board PCS/TT experts from various IMs/ABs Operational level RU Advisory Group IM and RU business experts PCS Technical Board +RUs PCS User Group +RUs PCS Test Group PCS Training Group RFC C-OSS Community