Problem reporting pluralism

Slides:



Advertisements
Similar presentations
Bd Building Admin Site Layout Charlotte Jenkins Advanced Web Technologies Assignment 2.
Advertisements

> >
Enabling Grids for E-sciencE COD 19 meeting, Bologna Nordic ROD experiences Michaela Lechner COD-19, Bologna.
Overview AdministrationEmployeeCustomerWaiting Screen.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Next steps with EGEE EGEE training community.
ATLAS Experience with GGUS Guido Negri INFN – Milano Italy.
Adding SubtractingMultiplyingDividingMiscellaneous.
Opensciencegrid.org User Support in/and OSG Doug Olson, LBNL 2 nd EGEE/LCG Operations Workshop CNR, Bologna 25 May 2005.
Security Policy Update WLCG GDB CERN, 14 May 2008 David Kelsey STFC/RAL
1Maria Dimou- cern-it-gd LCG GDB May 2008 USAG and direct GGUS ticket routing to Sites Grid Deployment.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks The EGEE User Support Infrastructure Alistair.
Adding and Subtracting Fractions To add or subtract two fractions that are written with the same denominator (the number on the bottom), simply add or.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks What all NGIs need to do: Helpdesk / User.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Best Practices and Use cases David Bouvet,
GOCDB Handover + Status Update Quite heavy GGUS ticketing traffic; responding to user issues has been quite timely, especially in first few weeks (expected.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks ROC model assessment AP ROC ShuTing Liao.
EGEE is a project funded by the European Union under contract IST ROC-IT User Support in the EGEE infrastructure Riccardo Brunetti INFN-Torino.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI COD activity in EGI-InSPIRE Marcin Radecki CYFRONET, Poland & COD Team 9/29/2016.
CERN WLCG Grid Storage Systems Deployment Flavia Donno, CERN 6 November 2007 Organization of Storage Support through GGUS Flavia Donno CERN/IT-GD CERN.
LHCOPN operational handbook Documenting processes & procedures Presented by Guillaume Cessieux (CNRS/IN2P3-CC) on behalf of CERN & EGEE-SA2 LHCOPN meeting,
Il Sistema di Supporto INFNGrid & GGUS (Global Grid User Support )
EGI Operations Management Board
Il sistema di supporto di INFNGRID e GGUS
EGEE is a project funded by the European Union
GGUS webportal – future plans
Biomed user support Christophe Blanchet CNRS IBCP, Lyon, France
User Support Workflow in EGEE
PL-Grid – an example of NGI support structure Marcin Radecki
Brief overview on GridICE and Ticketing System
ATLAS support in LCG.
LCG/EGEE Incident Response Planning
Grid Operations Procedures
1 VO User Team Alarm Total ALICE ATLAS CMS
1 VO User Team Alarm Total ALICE 1 2 ATLAS CMS 4 LHCb 20
Proposal for GOCDB workload management
IPV4.
EGI Community Forum 2012 Munich, 29 March 2012
1 VO User Team Alarm Total ALICE ATLAS CMS
Cyril L’Orphelin (CC-IN2P3) COD-19, Bologna, March 30th 2009
The CCIN2P3 and its role in EGEE/LCG
“In the world today” assignment
Maite Barroso, SA1 activity leader CERN 27th January 2009
Nordic ROC Organization
Take the summary from the table on
Introduction to Networks
Pole 3 – Dashboard Assessment COD 20 - Helsinki
SAM Alarm Triggering and Masking
ASSIGNMENT NO.-2.
The UK Tier 1 Entrepreneur Visa and the UK Representative of Overseas Business Visa - SmartMove2UK
MGT 4059 Enthusiastic Studysnaptutorial.com
Backpage Preston
Backpage Southampton Southampton Classifieds Ads
. - t !!l t. - 1f1f J - /\/\ - ' I __.
Improved UI/UX Right Click menu becomes pencil button & settings (category are here) Description included in the action panel – remove management panel.
Report Administration
معلم الصف الثالث الابتدائي
HO DOC Team Site – How to subscribe?
Elevator Programming.
GGUS Release G. Grein, H. Dres.
Software Vulnerability Group Status update
.. '.. ' 'i.., \. J'.....,....., ,., ,,.. '"'". ' · · f.. -··-·· '.,.. \...,., '.··.. ! f.f.
What’s New in Ventus Service Management.
ФОНД “СОЦИАЛНО ПОДПОМАГАНЕ”
Requisition Approval Tracking Module
Release and deployment process Working Group
Adding with 9’s.
Adding with 10’s.
EGEE Operation Tools and Procedures
Adding ____ + 10.
Building pattern  Complete the following tables and write the rule 
Presentation transcript:

Problem reporting pluralism http://indico.cern.ch/conferenceDisplay.py?co nfId=29170 2008-03-04 CCRC'08 F2F Meeting 20080304

Not recommendable. Reasons: Examine bottom-up Meaning: from operators’ alarms to GGUS: Not recommendable. Reasons: Mailing lists of trusted VO users not yet harmonised. Operators’ procedures differ per site. Local ticketing systems differ per site and per problem category. Adding hops introduces delays. Operators’ alarms are often simply local site business. CCRC'08 F2F Meeting 20080304

Examine top-down Meaning from the opening of a GGUS ticket to a given site admin: No direct route today but a pre- requisite condition for the VOs to use GGUS in production. Reason: Current assignment chain (TPM, ROC, Site) simply TOO slow. CCRC'08 F2F Meeting 20080304

Info repository https://savannah.cern.ch/support/index.php?103378 https://savannah.cern.ch/support/index.php?103578 CCRC'08 F2F Meeting 20080304