ILC/CLIC e+ generation working group

Slides:



Advertisements
Similar presentations
30/10/09 Positron Workshop 1 Future Work Plan, Action Items, Future Meetings Jim Clarke ASTeC & Cockcroft Institute Daresbury Laboratory.
Advertisements

A Capture Section Design for the CLIC Positron Source A. VIVOLI* Thanks to: L. RINOLFI (CERN) R. CHEHAB (IPNL & LAL / IN2P3-CNRS) O. DADOUN, P. LEPERCQ,
Friday 28 th April Review of the aims and recommendations from the workshop L. Rinolfi.
JCS e + /e - Source Development and E166 J. C. Sheppard, SLAC June 15, 2005.
ILC Polarized Electron Source Annual DOE HEP Program Review June 5 – 8 International Linear Collider at Stanford Linear Accelerator Center A. Brachmann,
Status of Undulator-based Positron Source Baseline Design Leo Jenner, but based largely on a talk given by Jim Clarke to Positron DESY-Zeuthen,
1 st October 2008 Réunion sur la contribution exceptionnelle de la FrancePositron generation L. Rinolfi (CERN) Contribution exceptionnelle de la France.
16 th June 2008 POSIPOL 2008L. Rinolfi / CERN CLIC e + sources status L. Rinolfi with contributions from F. Antoniou, H. Braun, A. Latina, Y. Papaphilippou,
Undulator Based ILC Positron Source Studies Wei Gai Argonne National Laboratory CCAST ILC Accelerator Workshop Beijing, Nov 5 – 7, 2007.
1 st October Linear Collider workshop The CLIC/ILC common work plan progress J. Clarke and L. Rinolfi.
Helical Undulator Based Positron Source for LC Wanming Liu 05/29/2013.
Compton/Linac based Polarized Positrons Source V. Yakimenko BNL IWLC2010, Geneva, October 18-22, 2010.
2015/10/261 Present members : KEK: J.Urakawa, T.Omori, T.Suwada, T.Kamitani, BINP, Novosibirsk :Pavel Logachev (BINP), V.M.Strakhovenko, --- Hiroshima:
WG3a Sources Summary Jim Clarke on behalf of John Sheppard, Masao Kuriki, Philippe Piot and all the contributors to WG3a.
Key luminosity issues of the positron source Wei Gai.
Summary: Injector systems May 31 st, 2013 W. Gai (ANL), M. Kuriki (KEK), Y. Papaphilippou (CERN), S. Riemann (DESY)
Current standing of the undulator based ILC positron source Wei Gai AWLC 14 FNAL, May
Development of a Positron Production Target for the ILC Positron Source Capture Optics Positron beam pipe/ NC rf cavity Target wheel Vacuum feedthrough.
A.Variola Motivations…from D.Hitlin Talk The polarized positron source.
15 th October CLIC workshop The CLIC/ILC common issues for the sources Jim Clarke and Louis Rinolfi.
Electron Source Configuration Axel Brachmann - SLAC - Jan , KEK GDE meeting International Linear Collider at Stanford Linear Accelerator Center.
Global Design Effort 1 Sources Parallel Session Summary Jim Clarke STFC Daresbury Laboratory.
20 April 2009 AAP Review Global Design Effort 1 The Positron Source Jim Clarke STFC Daresbury Laboratory.
Undulator Based ILC Positron Source Parameters Wei Gai ANL ALLCPG 2011 March 20, 2011,
Welcome and Introduction to the Workshop Jim Clarke ASTeC & Cockcroft Institute Daresbury Laboratory ILC Positron Source Collaboration Meeting 29 – 31.
ILC/CLIC e + generation working group Jim Clarke, STFC Daresbury Laboratory and Louis Rinolfi, CERN.
Discussion, Action Items, & Future Work Plan Jim Clarke ASTeC & Cockcroft Institute Daresbury Laboratory ILC Positron Source Collaboration Meeting 29 –
2nd ECFA LHeC Workshop; 1-3 September 2009, Divonne L. Rinolfi Possible e - and e + sources for LHeC 1 Thanks to O. Brüning, A. Vivoli and F. Zimmermann.
International Linear Collider at Stanford Linear Accelerator Center 9/13/2006 Americas Regional Team FY08-09 Planning Meeting 1 1/11 ILC-Americas FY08-09.
1 Scope of PosiPol2008 WS LC related positron source issues (ILC and CLIC) General Capture Section Targets Polarized Particle Physics Laser Applications.
2016/1/271 Present members : KEK: J.Urakawa, T.Omori, T.Suwada, T.Kamitani, BINP, Novosibirsk :Pavel Logachev (BINP), V.M.Strakhovenko, Hiroshima: T.Takahashi,
23 th July 2010 CLIC meeting L. Rinolfi POSIPOL workshop 2010 L. Rinolfi A brief overview.
Status of the CLIC main beam injectors LCWS, Arlington, Texas, October 22 th -26 th, 2012Steffen Döbert, BE-RF Overview of the CLIC main beam injectors.
Undulator based polarized positron source for Circular electron-positron colliders Wei Gai Tsinghua University/ANL a seminar for IHEP, 4/8/2015.
Update on ILC Production and Capturing Studies Wei Gai, Wanming Liu and Kwang-Je Kim ILC e+ Collaboration Meeting IHEP Beijing Jan 31 – Feb 2, 2007.
22 th October 2010 IWLC Sources working group J. Clarke, T. Omori, L. Rinolfi, A. Variola Summary of Sources working group WG1 with contributions from.
General remarks: I am impressed with the quantity and quality of the work presented here and the functioning of the organization. I thank ILC and FNAL.
Axel Brachmann, John Sheppard, Vinod Bharadwaj SLAC Particle Sources Efforts Review/Status and Plans SLAC HEP Program Review June 13 th, 2007.
Status of the Compton Experiment at the ATF TILC09 18-April-2009 T.Takahashi Hiroshima University for collaborators.
27 th May 2009 CLIC ACE meetingL. Rinolfi CLIC Main Beam generation Baseline configuration only L. Rinolfi for the CLIC Injector complex team.
WG3a Sources Update Jim Clarke on behalf of WG3a GDE Meeting, Frascati, December 2005.
T.Takahashi Hiroshima /11/5 Tohru Takahashi Hiroshima University 高橋 徹 広島大学.
CERN 14 October 08 Injectors and Damping Rings working group S. Guiducci, L. Rinolfi CLIC08 Workshop.
POSIPOL Berlin ILC/CLIC e + generation working group Wei Gai, ANL Louis Rinolfi, CERN Thanks to Omori-san for the coordination of the Webex meetings.
November 20, 2008 A. Brachmann Slide 1 Sources Session Summary LCWS 2008 A. Brachmann, J. Clarke.
김 귀년 CHEP, KNU Accelerator Activities in Korea for ILC.
ILC e - and e + sources overview Jim Clarke STFC Daresbury Laboratory, UK On behalf of ILC Positron Sources Group.
ILC Positron Production and Capturing Studies: Update Wei Gai, Wanming Liu and Kwang-Je Kim Posipol Workshop, Orsay, France May 23-25, 2007 Work performed.
Positron Source for Linear Collider Wanming Liu 2013 DOE Review.
28 th August 2011 POSIPOL Workshop – IHEP-Beijing- ChinaL. Rinolfi Louis Rinolfi CLIC e + status.
Oct. 6, ILC Positron Source Group Meeting Short report by S. Riemann September 2006, RAL.
20 th October 2010 IWLC Sources working groupL. Rinolfi Louis Rinolfi CLIC e - and e + sources overview for the CLIC Sources collaboration.
Positron Source for Linear Collider Wanming Liu 04/11/2013.
A.Variola LCWS07 DESY-Hambourg Posipol A.Variola LCWS07 DESY-Hambourg Some Posipol 2007 numbers ~ 55 inscriptions 3 days workshop 8 sponsors Different.
Progress with Zeuthen Meeting Actions Jim Clarke ASTeC, STFC Daresbury Laboratory.
Positron Source Report Jim Clarke STFC Daresbury Laboratory/Cockcroft Institute.
ILC Positron Production and Capturing Studies: Update Wei Gai, Wanming Liu and Kwang-Je Kim ILC GDE Meeting DESY May 30 – Jun2, 2007 Work performed for.
LHeC Sources Rinolfi CERN Thanks to:
Status of the CLIC main beam injectors
CLIC e+ status Louis Rinolfi.
CLIC Main Beam Sources and their transfer lines
Oversea collaborators
REVIEW OF POSITRON SOURCE R&D FOR LINEAR COLLIDERS
CLIC Undulator Option for Polarised Positrons
Future Work Plan and Action Items
ILC RDR baseline schematic (2007 IHEP meeting)
Electron Source Configuration
Summary for the Sources working group
A. Brachmann and J. C. Sheppard SLAC April 4, 2006
with contributions from
Presentation transcript:

ILC/CLIC e+ generation working group Wei Gai, ANL Louis Rinolfi, CERN with contribution from Jim Clarke, STFC Daresbury Laboratory

Mandate For polarized electron sources, ILC and CLIC studies are based on photo-injectors using a DC gun with different parameters. For polarized positron sources, the ILC study considers the Undulator option as the base line while the Compton schemes are alternative options. The CLIC study considers the Compton schemes as the base line while the Undulator is an alternative option. Additionally, both projects are interested in the development of conventional sources (ILC as an alternative option/(KAS) and CLIC as the baseline for the CDR). The working group should: Develop the synergy between the ILC and CLIC e+ and e- studies. (Such as CDR for CLIC and TDR for ILC) Evaluate the common technical issues related to production of unpolarized and polarized positrons. Prioritize R&D. Review the existing tests facilities where further tests could be performed. Invite experts from different institutes to contribute to the studies. Evaluate where cost savings could be obtained. Promote common meetings and workshops.

Commonality on 1 TeV ILC option and CLIC scheme Current status The ILC/CLIC work plan has been reviewed at POSIPOL 2010 (KEK) and at IWLC 2010 (CERN). One conclusion was that major milestones have been achieved for the work plan 2008 – mid 2010. Commonality on 1 TeV ILC option and CLIC scheme According to the available resources from the different institutes around the world, the possible contributions are presented for the work plan mid 2010 – 2011.

Plan 2010 - 2011 for Asian labs KEK Hiroshima University 1. Tests with hybrid targets at KEKB Linac 2. Tests of BN windows at KEKB storage ring beam dump for liquid Pb target 3. Tests of liquid Pb target system at ATF (collaboration with BINP) 4. Laser Compton Experiment (Polarized e+ source) 5. Laser Cavity R&D (collaboration with Hiroshima University) 6. L-band RF Gun for Superconducting Test Facility (e-) HV DC gun (200kV and 500kV) (polarized e- with Superlattice photo cathode). Hiroshima University 1. Tests Photo-cathode s (e-) 2. Ultra High Vacuum R&D (e-) 3. L-band RF Gun (e-) 4. Laser Cavity R&D (collaboration with KEK) 5. Laser Compton Experiment (Polarized e+ source) 6. Tests with hybrid targets at KEKB Linac.

Plan 2010 - 2011 for Asian labs Nagoya University Photocathodes developments (polarized e-) and high voltage DC gun (200 kV). Institute for Solid State Physics (ISSP)/Advanced Industrial Science and Technology (AIST) Photo-cathode Laser R&D (e-) IHEP Hybrid targets related physical processes simulation at LAL (PhD student from IHEP at LAL) High voltage DC gun (500 kV) (collaboration with KEK/JAEA possible in near future) RIKEN/Spring8

Plan mid-2010 - 2011 for American labs 1. Simulations for e+ sources Undulator based 2. Studies of energy deposition in various targets (W, Ti, liquid Pb) 3. Study 1 TeV option for ILC and its implication on CLIC BNL 1. Studies of Compton Linac for polarized e+ 2. Development of CO2 lasers 3. Studies for Superconducting photo-injectors Cornell 1. Design Li lens 2. Design collimator LLNL 1. Target tests related to beam energy deposition 2. Design of Flux Concentrator 3. Rotating seal vacuum tests

Plan mid-2010 - 2011 for American labs JLAB 1. Polarized electron source 2. Build a dedicated beam line & low-power e+ conversion target at 10 MeV (CEBAF injector) 3. Integrate E-166 e+ collection & Compton transmission polarimeter + system upgrades 4. Commission experimental apparatus with polarized electron beam 5. Perform experiment to characterize transfer of ~10 MeV polarized electrons to positrons SLAC Polarized electron source

Plan 2010 - 2011 for European labs CERN 1. Beam dynamics studies for e+ source based on hybrid targets (collaboration with LAL/IPNL) 2. Studies for polarized positrons (Compton ring, Compton linac, ERL, Undulator) 3. FLUKA simulations for different type of targets (collaboration with Uludag university) 4. Stacking simulations in Compton and ERL rings 5. Polarization studies (collaboration with DESY). LAL / IPNL / BINP Unpolarized e+ Simulations of the crystal targets with channelling processes (collaboration IHEP/CERN). 2. Polarized e+ Simulations of Compton process (CAIN simulations) Development of optical cavity and laser system for the Compton process (collaboration with KEK) GEANT4 simulations for targets and capture sections PARMELA and ASTRA simulations from the target to the pre-injector exit Studies on the source layout

Plan 2010 - 2011 for European labs DESY 1. Source modeling including spin tracking (PPS-Sim, GEANT4) 2. Shock wave simulation studies 3. Radiation aspects at target and source area 4. Polarization studies and depolarization effects (collaboration with CERN) STFC 1. Undulator studies 2. Central integration Lancaster University 1. Complete work on target prototype (eddy currents and mechanical characteristics) 2. Investigate the effect of less-idealised photon distribution from undulator 3. Study of depolarization effects at IP (collaboration with Desy) 4. Hydrodynamic shockwave simulations (collaboration with Durham) 5. Study of ILC/CLIC Compton source with PPS-Sim code.

Plan 2010 - 2011 for European labs Kharkov University 1. Beam dynamics simulations for e+ source based on Compton ring 2. Evaluation and simulation of parameters of the polarized gamma-ray beams for production of polarized positrons. BINP 1. Li lens tests 2. Flux concentrator studies 3. Development of liquid targets.

Summary a) An updated work plan, for 2010 - 2011 is presented where many milestones have been already achieved from the different laboratories. b) The main issues are the lack of experimental facilities. c) The next review will be presented at POSIPOL 2011 in Beijing.