Testing CERN Magnet – Test Station Interface

Slides:



Advertisements
Similar presentations
5-7 Nov 2013UA9 collaboraion meeting. CERN, Maisheev V.
Advertisements

Seog Oh/ Duke University/June, 2003 TRT/ ATLAS week at CERN Duke Production Status.
Magnet and Absorber Heat Loads and Cooling with Various Small Coolers
Prospects of SC Quadrupole Production at IHEP-Protvino The 2nd Institutes Meeting on International Construction of the FAIR Accelerator Complex Protvino,
Progress report on the test facility project design and construction P. Schnizer and L. Serio on behalf of bldg. 180 test facility project team members.
PSB MPS Building 245 CV Status EN-CV-PJMichel OBRECHT – Frédéric TEIXEIRA
Operating Challenges & Solutions Beth A. Sullivan MTA Long Island Rail Road Superintendent – Revenue Compliance & Service Quality Jamaica, New York.
Task 5: High-Tc Superconducting Link Status Update Meeting Eucard - WP7 Collaboration Meeting (video) A. Ballarino, G. Hurte, G. Willering (CERN) M. Tropeano,
VOR Navigation Chris Evans. VOR  Very-High Frequency Omnidirectional Range.  Ground station oriented to magnetic north  360 courses called radials.
MICE/MuCool Coupling Magnets to 22 ICST/HIT MICE/Muool Coupling Magnets Progress Li Wang for MICE Group Institute of Cryogenics.
LMQXFA Cold Mass Assembly Antonios Vouris Fermilab February 3, 2016.
1 Online Searching, 4 th ed. Chapter 5 PsycINFO Additional Feature: The PsycINFO Thesaurus pp Librarian’s Guide to Cultivating Database Skills for.
1 W.Ootani ICEPP, University of Tokyo MEG experiment review meeting Feb , PSI W.Ootani ICEPP, University of Tokyo MEG experiment review meeting.
Closeout. Sharing 2010 Straw production – Material study: CERN – Procurement (CERN) – Straw production: Dubna Electronics (CERN) Simulations, analysis.
Lucio Rossi for the LARP Internal Project Review Via videlink, June 10, 2013.
Inner Triplet Review 1 H. Prin AT/MEL Activities on the triplets at CERN Reception and Acceptance Triplet String Assembly in Building 181 Handling and.
Industrial Controls Engineering Department Results of the PXI survey launched in June 2011 First CERN PXI Users Group meeting - 19 th October H.
 What causes weather?. 1. Anticipatory Set o Bellringer o Objective 2. Input (Notes on Fronts) 3. Guided Practice – Front ID Game 4. Independent Practice.
Wire Procurement and Wire Joint Production
Status, Schedule and EVM for the test facility project
Schedule for the FAIR Antiproton Target
Roadmap for triplet cryostats
Crab Cavities Contribution from the U.S.
Procurement, Measurement and Installation of 2 Octupoles for ATF
11 T Dipole Integration & Plans M. Karppinen
Quench Simulation at GSI
Common Projects Status
BSS Prep work at CERN and Acceptance of Parts
Layout of cryogenic facility in Super-FRS tunnel and buildings
Collaboration meeting 26 to 28 June 2017
Proposal on the production of superconducting cable in Europe
Cold Antimatter at CERN
(Procurement, testing of magnets)
The Physical World of a Machine
How to wash your clothes in a washing machine
Parts exchange for HL-LHC AUP Q1&Q3
The UK Tier 1 Entrepreneur Visa and the UK Representative of Overseas Business Visa - SmartMove2UK
Status of the PANDA Solenoid Magnet Production in BINP
The History of Operating Systems
Testing Workshop on Survey and MM
Operating Challenges & Solutions
21 Nov.2010-Extraordinary –Anas Mahrous
FAIR magnets fiducialisation WP 7.5

كار همراه با آسودگي و امنيت
“Changing for Progress and Longevity in Your
Today in your notebooks
Today in your notebooks
CSE 301 History of Computing
Homework Do Now: Agenda Monday November 28, 2016 Objectives:
What causes a false dispatch?
Status on CLIC Long Quadrupole Prototype for Stabilization Studies (M
Machine Learning Course.
$ $
Goal for Today: Date: Time/Food Item P G C V Fr. Fa. D Symptoms.
Control of a Contactless Positioning System Using Magnetic Levitation
Nearly One of Three Opinion Leaders Familiar with Culture Change Believe It Has Been Effective in Improving the Quality of Care in Nursing Homes “How.
Status of the PANDA Solenoid Magnet Production in BINP
Focus on One of the Blue Circles
Super-FRS Dipole magnetics
What are you looking for today?

Chapter 37 Review.
Fast Roaming Study Group Closing Report March 2004
Welcome to eat my lunch.
(vertical cryostat, Gersemi)
Study of Beam Losses and Collimation in JLEIC
Southern Link Conference
Simplified Procedure Draft
Outcome and achievements resulting from the 1st Alignment workshop (June 25-26, 2015, Lund) - Introduction - R. Garoby 30 August 2016.
Presentation transcript:

Testing Super-FRS @ CERN Magnet – Test Station Interface 4. Nov 2015 L. Serio and P. Schnizer

Motivation June 2015 Today: Presentation of Super-FRS machine Presentation of measurement requirements Review of measurement requirements → found matching machine needs https://indico.gsi.de/conferenceDisplay.py?confId=3754 Today: Magnetic measurement Systems designed Heading into procurement Last review → acceptance and move forward Survey Started last time Requirements review Fiducialisation, cold mass movement