Michael Benedikt AB/OP

Slides:



Advertisements
Similar presentations
Accelerator Complex Status P. Collier. Linac2, Booster and PS Startup on-time, according to the schedule. Only minor problems Rapidly set-up the major.
Advertisements

ISS meeting, (1) R. Garoby (for the SPL study group) SPL-based Proton Driver for Facilities SPL-based Proton Driver for Facilities at CERN:
Expected performance in the injectors at 25 ns without and with LINAC4 Giovanni Rumolo, Hannes Bartosik and Adrian Oeftiger Acknowledgements: G. Arduini,
Accelerator Schedules LHC and LHC Injectors Schedules MSWG meeting 16 January 2015 SPSC - 13 January 2015 Rende Steerenberg, BE/OP2 Rende Steerenberg,
NOvA meeting PIP Update W. Pellico. PIP Goals and Scope (Provided in 2011 – Directorate S. H. / DOE Talk ) Goals: Specific to the issues surrounding the.
SPS scrubbing experience: electron cloud observables L. Mether on behalf of the LIU-SPS e-cloud team LIU SPS scrubbing review, September 8, 2015.
June 23, 2005R. Garoby Introduction SPL+PDAC example Elements of comparison Linacs / Synchrotrons LINAC-BASED PROTON DRIVER.
0 1 Alternative Options in the Injectors – Preliminary Summary H. Damerau LIU-TM#8 18 October 2013 Many thanks for discussions and input to T. Argyropoulos,
12/10/05NuPAC – CERN 2005M. Benedikt 1 Potential future proton beam performance at CERN for HIE ISOLDE, n_TOF phase 2 and EURISOL Michael Benedikt AB Department,
NA61 11 October 2010Light Ion for NA61/ S. Maury1 Light Ion in SPS Foreseen to have primary Ar beam physics in 2012 Nothing runs in 2012 NA61 duty cycle.
COMPASS Meeting 2/07/2004 R. Garoby1 RECOMMENDATIONS OF THE HIP WORKING GROUP* *
LHC-CC Validity Requirements & Tests LHC Crab Cavity Mini Workshop at CERN; 21. August Remarks on using the LHC as a test bed for R&D equipment.
Content  The LHC beams produced  LINAC2 & PSB  The PS  The SPS  Super Cycles and N0n-LHC physics  Conclusions IEFC Workshop, 8 March 2012 Rende.
LHC Injection Sequencing MD 16/23/2009 Injection sequencing / BCM R, Giachino, B. Goddard, (D. Jacquet), V. Kain, M. Meddahi, J. Wenninger.
SPS proton beam for AWAKE E. Shaposhnikova 13 th AWAKE PEB Meeting With contributions from T. Argyropoulos, T. Bohl, H. Bartosik, S. Cettour.
LHC Injectors Upgrade Project 1/12/2010 R. Garoby.
ATC-ABOPC Days 2008: Session 1 Summary ATC-ABOC days Summary Session; February Session coordinated by B. Mikulec AB-OP and O. Br ü ning AB-ABP Operation.
Filling Schemes for the 2010 Heavy Ion Run Updated (3 rd iteration) version of BCWG presentation initially on 28 September, updated after discussions with.
14/01/2005M. Giovannozzi - PS-SPS Days1 When can we have a clean Multiturn Extraction from the PS? M. Giovannozzi M. GiovannozziContentIntroduction Summary.
Beam loss and radiation in the SPS for higher intensities and injection energy G. Arduini 20 th November 2007 Acknowledgments: E. Shaposhnikova and all.
CO Timing Review: The OP Requirements R. Steerenberg on behalf of AB/OP Prepared with the help of: M. Albert, R. Alemany-Fernandez, T. Eriksson, G. Metral,
The OP Viewpoint on the Accelerator Complex Controls Renovation R. Steerenberg on behalf of the OP group Accelerator Complex Controls Renovation Workshop.
Pushing the space charge limit in the CERN LHC injectors H. Bartosik for the CERN space charge team with contributions from S. Gilardoni, A. Huschauer,
RF measurements during floating MD in Week 40 3 rd of October 2012 LIU-SPS BD WG 25/10/2012 Participants: T. Argyropoulos, H. Bartosik, T. Bohl, J. Esteban.
PRESENT AND FUTURE TEST FACILITIES FOR HIGH- INTENSITY TARGETRY CERN I.Efthymiopoulos, CERN with input from Jacques Lettry & Rende Steerenberg.
HP-PS beam acceleration and machine circumference A.LachaizeLAGUNA-LBNO General meeting Paris 18/09/13 On behalf of HP-PS design team.
EXPERIMENTAL AREAS CONSOLIDATION EACONS part – early draft from comments.
1 How Many Protons can we afford to loose in the PS ? Thomas Otto SC-RP.
FCC-ee injector complex including Booster Yannis Papaphilippou, CERN Thanks to: M.Aiba (PSI), Ö.Etisken (Ankara Un.), K.Oide (KEK), L.Rinolfi (ESI-JUAS),
HiRadMat Primary Beam Overview C. Hessler, B. Goddard, M. Meddahi On behalf of the HiRadMat Primary beam line working group HiRadMat Project Review
PS2 beam parameters and proposal for aperture strategy M. Benedikt , PS2 meeting1Beams and apertures, M.Benedikt.
LHC Injectors Upgrade Project 11/11/2010 R. Garoby.
Beam Manufacture in PS2 M. Benedikt, S. Hancock. LHC Beams in the PS by 2015 Typeh injε l inj [evs] h ejN bunch ej RF ej [MHz] ε l ej [evs] τ ej [ns]
LIU Day 2014 – M.Bodendorfer - LEIR model. LEIR model A plan for understanding/upgrading the LEIR performance limitations M.Bodendorfer BE/ABP & LEIR.
LIU-PS Beam Dynamics Working Group Introduction and objectives
ICE SECTION The coolest place to be! Elias Métral
Lead performance throughout the injector chain with focus on LEIR
Impact of the current debuncher limitations (…can we get rid of longitudinal painting?)
Alternative/complementary Possibilities
Plans for ions in the injector complex D
Other Scenarios for a partial Upgrade of the Injector Complex C
Beam Loss and Radiation Working Group: Conclusions
CLIC Klystron-based Design
Longitudinal beam parameters and stability
Installations, modifications, consolidation in 2005:
Saturday 21st April 00:33 Interlock during ramp on BLM HV
High Radiation to Materials 16th Project Team Meeting – May 20, 2010
LIU, ABP-CWG, PBC, miscellaneous
of secondary light ion beams
Acknowledgments: LIU-PT members and deputies, H. Bartosik
How to run ions in the future?
New AD Production Beam in the PSB
Superbeams with SPL at CERN
IS IT POSSIBLE TO INCREASE THE p INTENSITY FOR CNGS BY A FACTOR 2 OR 3
D. Manglunki with input from C. Carli, K. Cornelis, T. Dobers, I
Beam requirements and operational scenarios in 2010
Progress towards Pulsed Multi-MW CERN Proton Drivers
ELENA Extra Low ENergy Antiproton Ring
CNGS Project Overview Konrad Elsener.
Introduction to LHC beam production in PSB and PS
Present and Future test facilities for High-intensity Targetry CERN
LEIR Presented by M. CHANEL PSDAYS: EVIAN 2001.
Beam dynamics requirements after LS2
Generation of Higher Brightness Beams for LHC
SLHC-PP kick-off meeting, CERN 9 April 2008
How to control the local beam density
Collective effects in the SPS and LHC (longitudinal plane)
The SPL-based Proton Driver at CERN
Thu :00 Dumped beams, refill for Pb-Pb physics. No more protons in 2011… Some changes: Increase of flat top total voltage to 14 MV. Feed-forward.
Presentation transcript:

Michael Benedikt AB/OP Why and how to prepare for 900 ms basic period operation in the near future Michael Benedikt AB/OP 14/01/05 PS & SPS Days 2005

Outline Introduction Expected performance Other aspects Motivation, basic choices, impact Expected performance Overview Other aspects Implementation Summary and conclusions 14/01/05 PS & SPS Days 2005

Motivation Existing commitments (from HIP WG results) Important shortfall of SPS cycles for physics (CNGS and FT). ISOLDE performance 5 to 10% below request in CNGS era. Upgrade plans of CNGS (>factor 1.5) and ISOLDE (up to factor 5). Proposed improvement plan for SPS physics: Significant increase of CNGS intensity per SPS pulse: Fulfil (nominal) CNGS in shorter period and gain time for FT. Upgrade of CNGS without (further) reduction of cycles for FT. Consequences of higher intensity for SPS: Requires “double batch” filling PSB to PS i.e. more PSB cycles: Needs ~ 4 × 105 more PSB cycles, brings ISOLDE ~ 15% below request. Needs ~ 2 × 106 more PSB cycles, brings ISOLDE ~ 35% below request. Potential solution is an increase of PSB repetition rate 14/01/05 PS & SPS Days 2005

Basic choices and consequences Why 900 ms basic period and not…….e.g.1100 ms or 600 ms: Aim was to look for a short-term, low-cost upgrade that nevertheless gives a significant impact. Upgrade has to be largely compatible with existing hardware and control system (no change of philosophy). Fully exploit the potential from the “PS for LHC” upgrade. Basic period must be compatible with PS cycles to distribute the gain. 900 ms instead of 1200 ms means: 33% increase in PSB cycles. All cycles on all machines have to be integer multiples of 900 ms. Impact of 900 ms basic period operation: Enables improvement for SPS without jeopardizing ISOLDE physics. Improvements for LHC and PS East hall. Generally shorter cycles on PS -> more efficient use, more time for MD. Basis for CNGS and ISOLDE upgrades. 14/01/05 PS & SPS Days 2005

Impact on machine operation Linac2: Pulsing at 900 ms (machine was designed for 2 Hz operation). PS Booster: New magnetic cycle for 900 ms operation (identical for all beams). Nominal performance for high intensity operation was obtained in MD. PS: Choice of 900 ms allows to shorten most PS cycles by simply cutting-off unused parts at the end of cycles. Consequently there is no change of beam dynamics for most beams except SFTPRO for FT and CNGS (acceleration on h=8 only -> to be demonstrated). SPS: Time between multi-batch injections reduced – shorter injection flat. Remaining part of cycles unchanged (ramp up – down). LHC: Time between injections reduced – shorter injection flat. AD, Linac3, LEIR: no significant impact. 14/01/05 PS & SPS Days 2005

Expected performance (SPS users) LHC nominal 25 ns and 75 ns beams: shorter LHC filling PS: cycle 2.7 s instead of 3.6 s. SPS: flat bottom 8.1 s instead of 10.8 s, cycle 18.9 instead of 21.6 s. LHC: filling time reduced by 12.5%. LHC “individual bunch” beams (TOTEM, pilot): neutral. PS: cycle 1.8 s instead of 2.4 s. CNGS: 5% flux reduction (single batch) or neutral (double batch) PS: cycle 0.9 s instead of 1.2 s, compatible with Island extraction, acceleration on h=8 only, to be demonstrated for highest intensities in MD studies, i.e. >2.8E13. SPS: flat bottom 0.9 s instead of 1.2 s, overall cycle length 6.3 s instead of 6.0 s for PSB single batch operation, overall cycle length unchanged at 7.2 s for PSB double batch operation. SPS Fixed Target: neutral, unchanged duty cycle (spill/cycle). PS: cycle 0.9 s instead of 1.2 s, acceleration on h=8 only, see CNGS. SPS: flat bottom 0.9 s instead of 1.2 s, remaining cycle unchanged. 14/01/05 PS & SPS Days 2005

Expected performance (PS and PSB users) PS East hall beams: 20% increased duty cycle (spill/cycle) Cycle 2.7 s instead of 2.4 s. Spill length ~550 ms instead of ~400 ms. Net flux gain ~20%. n_TOF: three scenarios with different proton energies Cycle 1.8 s instead of 1.2 s. Beam energy 20 GeV/c (up to 24 GeV/c). Flux reduction 33% (20 GeV/c) 27% (24 GeV/c) – can be compensated. Cycle 0.9 s instead of 1.2 s. Beam energy change to 15.3 GeV/c from 20 GeV/c. Flux increase by 6% (15.3 GeV/c). 15.3 GeV/c solution is preferred to 24 GeV/c by n_TOF. AD – neutral PS cycle 1.8 s instead of 2.4 s. AD cycle remains unchanged. ISOLDE beams – 33% flux increase PSB cycle 0.9 s instead of 1.2 s. Nominal high intensity achieved in MD. 14/01/05 PS & SPS Days 2005

Other aspects Reliability and lifetime: Radiation aspects PSB: Equipment lifetime is usually proportional to the number of pulses and will therefore decrease like the pulse rate increases (≤ 75% of present). This lifetime decrease concerns PSB and PS but not SPS. Exploitation budget (P+M) has to take this into account. Radiation aspects PSB: 33% more cycles does not mean 33% increase in losses. Losses in PSB at increase more than proportional when pushing the intensity. The last 10 % in peak intensity nearly double the losses at high energy (extraction and recombination). Double batch CNGS will use lower PSB bunch intensity (smaller emittances) which will help PSB, PS, SPS. For highest intensity ISOLDE operation: the larger number of available cycles will allow to reduce the peak intensity. 14/01/05 PS & SPS Days 2005

Implementation strategy 2005 – Linac2 and PSB (approved by ABMB on 06/12/04): Start and run with 1200 ms basic period - prepare 900 ms in parallel: Adjust machine timing layout to be compatible to 900 ms. Perform all relevant tests (DSC software, etc) and modifications. Prepare all operational beams on 900 ms compatible cycles. Switch to 900 ms basic period and test-run for few weeks. Duration of 4-5 weeks (10 days dedicated) (proposed mid May – end June). Sufficiently long time to detect long-term problems. Verify all operational beams under full 900 ms conditions. Switch back to 1200 ms operation for normal run and the start-up 2006. Minimum risk strategy. Sufficient time for preparation (no unnecessary “crash programme”). Results from 900 ms run will facilitate preparations for PS/SPS 2006. 14/01/05 PS & SPS Days 2005

Implementation strategy 2006 – PS and SPS (to be reviewed after PSB test in 2005): Start and run with 1200 ms basic period - prepare 900 ms in parallel: Adjust PS and SPS timing layouts to be compatible to 900 ms. Perform all relevant tests (DSC software, etc) and modifications. Perform MDs to address all open issues (high intensity h=8 in PS, n_TOF). Prepare all operational beams on 900 ms compatible cycles. Switch all machines to 900 ms basic period during dedicated MD. 2 weeks of dedicated MD time for commissioning of 900 ms operation. Verify all operational beams under full 900 ms conditions. Minimum risk strategy. Avoids mixing up with eventual problems during PS/SPS restart after long shut-down and renovation of 40 PS magnets with complete realignment. Enables MDs on PS on h=8 high intensity before switching to 900 ms. Sufficient time for preparation while PS/SPS are running. 14/01/05 PS & SPS Days 2005

Summary Operation Machine aspects Performance for user LHC nominal 25/75ns Shorter PS, SPS cycles 15% shorter LHC filling time CNGS Shorter PS cycle, acceleration on h=8 in PS -5% flux (single batch PSB-PS) Neutral (double batch PSB-PS) SPS Fixed Target Shorter PS cycle Neutral (unchanged duty cycle) PS East hall Longer PS cycle, longer spill 20% increase in duty cycle nTOF 5% flux increase (15.3 GeV/c) Longer PS cycle -30% flux (w/o energy change) AD Neutral PSB ISOLDE - 33% flux increase Group Cost [kCHF] Man-years BT 50 0.2 CO 150 2.0 OP - 4.0 PO 900 3.5 Total 1100 9.7 14/01/05 PS & SPS Days 2005

Conclusions 900 ms basic period operation: Next steps: 33% more proton cycles from PSB. Basis for improvement on SPS and upgrades of CNGS and ISOLDE. Overall cost: ~1.1 MCHF, ~10 man-years. Can be fully implemented at end of run 2006. Next steps: Start preparations for Linac2 and PSB run in 2005. Ensure compatibility of new equipment and software with 900 ms. Specifications of power converter consolidation. Machine timings Linac3 and LEIR, SPS control and timing changes. 14/01/05 PS & SPS Days 2005

Acknowledgements Special thanks for the support and help of: S. Baird, JC. Bau, J. Borburgh, JP. Burnet, C. Carli, E. Carlier, P. Cennini, F. Di Maio, K. Elsener, A. Fabich, T. Fowler, R. Garoby, M. Giovannozzi, M. Haase, W. Heinze, M. Hourican, E. Jensen, R. Jones, S. Hancock, C. Hill, J. Lewis, A. Mengoni, G. Metral, M. O’Neil, U. Raich, M. Rettig, JP. Royer, K. Schindl, R. Scrivens, R. Steerenberg, JL. Sanchez-Alvarez, J. Wenninger, R. Wilfinger, T. Zickler. Many thanks to all colleagues in AB that have contributed to the study. 14/01/05 PS & SPS Days 2005