East Hall under construction

Slides:



Advertisements
Similar presentations
COMING NOVEMBER 2012 SHAWNEE HEIGHTS BOND REFERENDUM MORE INFORMATION WILL BE AVAILABLE SOON ON THE SHAWNEE HEIGHTS DISTRICT HOMEPAGE.
Advertisements

Engineering Department EN Cooling and Ventilation issues 1 FUTURE EXPLOITATION OF THE EAST AREA EN-CV Michel OBRECHT.
Kitchen New sandwich prep table. Kitchen New pizza prep table.
State of Wyoming Capitol Upgrades and Renovation projects Photos of the skylight and lighting project will be shown in chronological order, followed by.
Renovation Update Meeting: November 11, Phasing Plan: Currently working in Phase 5, Façade 6, and Crystal Palace.
RENOVATION & RESTORATION. New 3 rd Floor Prosecutors Office Existing Attic Space.
Sector 13 Canted Undulator Upgrade Hutch Modification Requirements.
Sector 13 Canted Undulator Upgrade Hutch Modification Requirements ( )
1 FUTURE EXPLOITATION OF THE EAST AREA Infrastructure and Equipment - Civil Engineering issues. Jonathan Carr – GS / SE.
House Construction. Learning Standard 5. Construction Technologies Construction technology involves building structures in order to contain, shelter,
Dirty Tour December 2005 UN Capital Master Plan. 2 Dirty Tour- introduction The UN building was a state-of-the-art, code compliant structure when it was.
Riverside Community Schools Overview of Summer Maintenance Projects.
SunTrust Tenant Improvements June 30, Background Current Situation Proposed Work Cost of Proposed Work Questions Presentation Outline.
MICE Magnetic Field Mitigation Review Potential impact on ISIS of MICE Stray Magnetic Fields 24 th September 2013 Martin Hughes.
Upgraded Injector Test Facility 2015 Users Group Board of Directors Update Akers/Experimental Nuclear PhysicsJanuary 13, 2015.
2/2/20121 PHENIX WEEKLY PLANNING 2/2/2012 Don Lynch.
Trinity Lutheran Church Major Maintenance Tuesday, February 17, 2015.
Lecturer prof. Iskandarova GT. 1. Hygienic requirements for heating, 2. Comparative evaluation of sanitary heating systems, radiant systems and air heating.
DER – Before, During and After: A Homeowner’s Perspective.
Building Plans.
FUNCTIONAL SPECIFICATION Dorothea Pfeiffer Dennis Haasler GIF++ User Meeting
EHN1 Extension – Overhead Cranes Renovation R. Rinaldesi – EN/HE 27/11/2014.
Status and possibilities for the irradiation facility in the PS East Hall Michael Moll, Maurice Glaser 10 March 2010 – IRRAD Working Group - some notes.
All Saints’ RC School Mansfield PE Changing Room Refurbishment 2007 Consultant : CP Associates Contractor : Tanbry Construction, Mansfield Cost :£372,
ISOLDE: Status report building th ISCC meeting CERN, 22 October 2013 Maria Borge, Erwin Siesling.
ORKA Preservation Task Force ORKA Preservation Task Force first meeting Wednesday, February 8, Notes by Peter H. Garbincius Notes from meeting are.
East Area, M2, K12 Lau Gatignon / EN-MEF, EATM
Vicinity Map Gillis W Long Center, Carville, LA Bldg 15 Stairwell Painting (1 st and 2 nd Floor) September 30, 2015.
Functional/Budget specification EHN1 Extension: Infrastructure (WG2) Mats Wilhelmsson EN/MEF 4 November 2015.
1/26/20121 PHENIX WEEKLY PLANNING 1/26/2012 Don Lynch.
ISOLDE: Status report building th ISCC meeting CERN, 24 June 2014 Erwin Siesling, Magda Kowalska.
Spanggaard BE-BI(1)RadWG Meeting 6/ Multi-Wire Proportional Chamber and Gas Electron Multiplier Electronics in TT83 Radiation issues.
Horst Breuker Review Oct ELENA Safety and Radio Protection ELENA TDR : Chapter 6; Safety Files in preparation; Descriptive, Demonstrative (Risk.
(1/17) 14/11/13 – RadWG meeting PS East Area Update Outline Layout updates of the facility Conveyer Rail system Mock-up Other news.
FY2017-FY2026 GDRSD Capital Plan-June 22, 2016 Jared Stanton, Director of Business and Finance.
Status of Gas Barrack(SPS) and Exhaust JAILLET David EN/EA/CT.
The Next Generation of a Gamma Irradiation Facility GIF++
Update on the PSB Cooling and Ventilation Systems
East Hall under construction
SPS Personnel Protection System Renovation Project
JOHN A. HOLMES IMMEDIATE FACILITY NEEDS
Safety and Prevention of Typical Fire Plan
Capital Projects Requests
EHN1 Extension planning
ELENA installation and commissioning status
LS1 planning meeting
East Hall under construction
School IPM for Custodians
CERN Data Centre ‘Building 513 on the Meyrin Site’
INSTALLATION SEQUENCE
AD consolidation activities in LS2
Budget specification EHN1 Extension: Infrastructure (WG2)
CE Status: Activities executed until 03/08 and ongoing
n_TOF “Draft” plans for YETS and LS2
EN-HE SPS works during EYETS
Overview of the Frascati Production Facilities
SR1 cleanroom extension
RWTCS Steering Commitee
Summary of ECRs for the YETS Booster, PS, ISOLDE and associated transfer lines (LIU + Consolidation) T. Birtwistle (EN-MEF-DC)
Extension SR1 WP3 Electrical installations
East Hall under construction
Experimental Areas – LS2 planning
Recent Bond Accomplishments
Building Bridges Through Zone Management.
Global Overview EA Deliverables for East Area Renovation
East Hall under construction
LINAC 3 Meeting ICL machines Injectors
East Area Renovation Supply of control rooms b.157
East Hall under construction
Linac4 Connection Broken Line 07/08/19
Presentation transcript:

East Hall under construction - 1962 EA Renovation project Kick-off meeting Works done in East Hall since LS1 and Works planned in 2016 East Hall under construction - 1962 Michael Lazzaroni / EN-EA, 22-07-2016

Works done from LS1 to 2016 in East Hall Beam lines: T7 suppressed (remains the beam line inside primary area-> to be removed) The T8 EA was modified : DIRAC->CHARM and IRRAD T7, inside primary zone CHARM facility IRRAD facility 29-07-2016

Works done from LS1 to 2016 in East Hall Beam lines equipment's Old MTVs was replaced by fresh new BTVs with control (YETS 2015-2016) Control of beam stoppers upgraded (LS1) Old marguerite replaced by the “multi-target” (LS1) New racks control in APRON BTV on F61D Multi-target in primary zone ML, 22-07-2016

Works done from LS1 to 2016 in East Hall Services around beam areas: Two PADMADs installed (to access the IRRADS and the primary area) New control rooms for the IRRADS “APRON” control room refurbished RAMSES (Radioprotection monitoring) implemented Beam Imminent Warning deployed (BIW) IRRADS PADMAD APRON renovated IRRADS control rooms

Works done from LS1 to 2016 in East Hall Infrastructure (inside the hall) (1/2) General cleaning of the hall Walls, floors and metallic structures painted (south side) Revamping of the two cranes (hoist included) (45 tons, 25 tons + hoist 8 t) New UPS (EOD: 40kVA & ESD: 20kVA) ~40 terminal boxes (TB)removed from the south wall Overhead crane PR67, 25 t + hoist 8 t UPS View of the south side

Works done from LS1 to 2016 in East Hall Infrastructure (inside the hall) (2/2) General safety : Secured the gangways (handrails, floors, crinolines) Secured the heating panels on ceiling (“panneaux radiants”) (2015) After maintenance View of gangways 4th floor and 3rd floor Heating panels: view of a threaded rod broken

Works done from LS1 to 2016 Infrastructure (outside the hall) (1/2) General safety (Circulation, handrails, cleaning) Gas point moved next to the gas area 9 external doors replaced and under SUSI access External door View of the north side Gas areas, north side

Works done from LS1 to 2016 in East Hall Infrastructure (outside the hall) (2/2) Walls: “cleaning” and painting Some H2 extractors removed (3/4) (2015) Some asbestos removed (roof of gas area, and eaves) 1 additional material door implemented (south side) View of the north side South side, dismantling of H2 extractor

Prevision 2016 Study of a Q74 lamination (tbc) In study Purchase of materials Purchase of materials Study (tbc) 22-07-2016

Thank you for your attention!

Separated beam for the British Bubble Chamber (1963)

Secondary beams (1963)

The left half of the hall is used for physics, the rest as storage space (1964)