LPI Moscow, K. Zhukov, MEPhI-LPI Moscow, V. Kantserov

Slides:



Advertisements
Similar presentations
Preparation for ATLAS SCT/ID Endcap Completion at CERN Jo Pater Manchester, 4 January 2006.
Advertisements

Daikin Altherma™ Troubling Shooting
HV Report F.Cavallari (INFN Roma). High Voltage set-up in M0’ 2 channels each driving 50 crystals (100 APDs) 1 Crate hosting 1 board (final system). 1.
David Emschermann DCS Workshop – PI Heidelberg – 22/01/2007 How to power up the TRD David Emschermann Physikalisches Institut Universität Heidelberg updated.
Niels Tuning (1/9) LV status. Outline 1)Preventive maintenance  Fan replacement 2)Power supplies:  Clogged cooling water circuit  Water damage 3)Next.
Summary of Fuse Testing for Barrel Module Fuse Boxes Duke University Jack Fowler.
TRT DCS overview Elzbieta Banas Zbigniew Hajduk Jolanta Olszowska (INP PAS Cracow) ID Week /TRT Operation1.
TRT Detector Status Report Konstantin Zhukov (Lebedev Physics Institute) for the ATLAS TRT group ID week, 19 May
Yu. Guz 18/12/20061 HCAL commissioning: status and plans Yu. Guz, IHEP, Protvino Outline 1. current status of HCAL a)CW+PM b)signal cables c)LED monitoring.
Lesson 9: Electrical Components
Chiho Wang ATLAS TRT Duke University Dubna, May Fuse Box Production Chiho Wang/Jack Fowler.
Electrical Safety.
Chiho Wang ATLAS TRT Duke University CERN, Feb TRT Barrel assembly status & schedule Feb. 9, 2005.
Technical presentation SC350
RF power & FPC status Eric Montesinos, CERN BE-RF on behalf of all people involved, great thanks to all of them !
P. Paolucci - I.N.F.N. di Napoli 1 MTCC meeting May 06 HV & LV status DELIVERED AT BLG /60  67% of the A3009 (LV) 6/40  15% A3512N (HV) 10/10 
18 July 2006A.Ciocio -SCTSG1 SCT Services Installation ID week full report (July 4) SCT Cables Web page
Straw Working Group Status assembly at CERN Plans 10/2/14Straw WG.
Chiho Wang Duke University 1 TRT Barrel integration Status / Schedule Chiho Wang.
Inverter power supply symptoms can be typically broken down into the following categories: 1. All Outputs Normal: 2. All Outputs Dead (no output): 3.
HBD Status Craig Woody BNL DC Meeting October 3, 2007.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept and status of the PSD temperature control - Concept of the PSD analog part.
Electronic Report Pigi. HV-LV-ADC status Sometimes “repaired boards” are not working properly and so I would like to propose you to: – Test and qualify.
FNAL All Experimenters Meeting January 7, Leslie Groer Columbia UniversityDØ Status 1 DØ Status and Progress Dec 17, 2001 – Jan 7, 2002  Reasonably.
Commissioning of the ALBA IOT-Transmitters Paco Sanchez - 14th ESLS RF - ELETTRA, September Paco Sanchez, RF Group, CELLS (Consortium for.
R. Boyd 1 February  Dr. M. Saleem  D. Jana  M. R. Meera Labbai  R. Boyd.
Overview of the main events related to TS equipment during 2007 Definition Number and category of the events Events and measures taken for each machine.
Status of the PSD upgrade - Problems with PSD in Be runs - Modification of cooling system - New temperature control - Upgrade of HV control system - MAPD.
8/September/2008Calo Running and Operation Meeting 1 SPD running and operation: progress report and plans Calo running and operation meeting – CERN 8 th.
8 June 2006A.Ciocio - SCTSG1 Status of Type IV Cables Cables production –resumed in February after 3 months stop –See ID week February ‘06 Delivery of.
SMPS.
R. Fantechi. Shutdown work Refurbishment of transceiver power supplies Work almost finished in Orsay Small crisis 20 days ago due to late delivery of.
Wiener Maraton & Turbines Pascal Perret LPC Clermont 16 April 2008.
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept of the PSD temperature stabilization and control - Upgrade of HV control system.
Field Replaceable Units, Common Problems, and Flowcharts.
BLM internal beam abort request :24:50 Bernd Dehning CERN BE-BI MPP, B. Dehning.
Chiho Wang ATLAS TRT Duke University CERN, Sep Barrel integration status.
TOF status and LS1 plansTOF status and LS1 plans 27/06/2012.
Sumary of the LKr WG R. Fantechi 31/8/2012. SLM readout restart First goal – Test the same configuration as in 2010 (rack TS) – All old power supplies.
Outline Upgrade status of the ECAL/HCAL HV control mezzanine board;  Firmware design,  Setup for making functional tests and validation FPGA firmware.
Faculty of Physics, University of Belgrade Collaboration meeting, Budapest 15 th of May, ToF-L/R detector HV upgrade Jovan Puzović, Faculty of Physics,
Faculty of Physics, University of Belgrade Collaboration board meeting 31 th of January, ToF-L/R detector HV upgrade Jovan Puzović, Faculty of Physics,
Lar status Calorimeters cold and stable: The pressure in the C-side cryostat is not nominal because of a problem being fixed An electronic repair campaign.
ATLAS TRT Duke University CERN, Feb Fuse Box Status Duke University.
Pulsed Magnet Power Supply Feasibility Study
TRT HV System status and plans for LS1 LPI Moscow, K. Zhukov.
FTK crates, power supplies and cooling issues 13/03/20131FTK-IAPP workshop - A. Lanza  Racks, crates and PS: requirements  Wiener crates  Rittal crates.
1 Calorimeter LED & LV - HV control systems LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Outline Status of the calorimeters LV & MV power supplies.
Mikhail Ovsienko TE-MPE-EE
LAV HV repair plans Matthew Moulson
MICE RF System Power Supplies, Control and Monitoring Status report
LKr status R. Fantechi.
LAV front-end and readout status
The High Voltage problem
Institute of Nuclear Physics Polish Academy of Sciences
Mini-drawers, FE-ASIC , Integrator
TE/EPC activities for LINAC 2, PSB, PS & TT2 during EYETS
Luca dell’Agnello Daniele Cesini GDB - 13/12/2017
HV & LV status LV system in W+1 and W+2 is OK
RPC Detector Control System
HV & LV status LV system in W+1 and W+2 is OK
HV & LV status DELIVERED AT BLG /60  67% of the A3009 (LV)
Series 5300 Lithium Cell Formation System
US Rod Burn-in Readiness DAQ Hardware/Power Supplies
Pierluigi Paolucci & Giovanni Polese
Pierluigi Paolucci & Giovanni Polese
RPC Detector Control System
Equipment Status ARCS equipment status DAQ equipment status
Pierluigi Paolucci & Giovanni Polese
Presentation transcript:

LPI Moscow, K. Zhukov, MEPhI-LPI Moscow, V. Kantserov TRT HV System status LPI Moscow, K. Zhukov, MEPhI-LPI Moscow, V. Kantserov 28 oct 2013 K. Zhukov, LPI Moscow

outline HV problems in 2012-13 What’s happened + repairing HV maintenance + firmware (HV SYS, Dubna) Plans for TRT HV in Nov-Dec 2013 28 oct 2013 K. Zhukov, LPI Moscow

HV problems in 2012-13 It caused shortcut in UPS line which was tripped. 460V pins shortage -> burned February 2012. Crate 003 & 004 (EC A) PS dropped. Bottom crate in Barrel rack dropped twice during 10 days -> the same damages on diode: dust on the PS board surface? December 2012. Bottom crate in barrel dropped two times during 10 days. In June V. Astakhov covered boards’ surfaces with HV lacquer. Crates were tested with load and assembled. But in September appeared the crate was burned at 460V pins. September 2013. Crate 007 in SR1 dropped. The crate was covered with lacquer in June but has broken. All misbehaved cells were successfully changed Few small problems with individual cells. 28 oct 2013 K. Zhukov, LPI Moscow

What’s happened (crate 007) 460 V pins: remains of shortcut. The part of conductor was burned. In June crate was checked and covered with HV lacquer by V. Astakhov. In September we tried to switch on it appeared it’s broken. It was shortcut between 460 V pins (as it was in crate 003). PFC was seriously damaged and sent to Dubna for recovery and investigation. Crate is in SR1 disassembled. It’s waiting for repair. 28 oct 2013 K. Zhukov, LPI Moscow

What’s happened (crate 010) After some investigations we assumed that it was some outside factor (e.g. dust) on surface which caused the shortcut in HV diode pins. It lead to high current in the branch of diode-bridge -> PS dropped We had to change two pairs of DIODE-MOSFET, 16&10 A fuses, PFC board. All surfaces were covered with URETHAN protective lacquer. 28 oct 2013 K. Zhukov, LPI Moscow

What’s happened (crates 003&004) What was damaged After repairing Valera Astakhov analyzed the PFC board damages and it seemed there was some defect in capacitors -> he found electrolyte remains on the boards – it lead to 460V pins shortage. We had to change two pairs of DIODE-MOSFET, 16&10 A fuses, PFC board and part of conductor. All surfaces were covered with URETHAN protective lacquer.

2013 maintenance activity In June 2013 maintenance for all HV crates was done by Valera Astakhov from HVSYS. All crates are checked and now (except one) ready to use in USA15 and SR1 areas. What was done: Review of all crates and its power supplies All crates’ power supply have been disassembled and covered with Electrofuge 200-ND (protective lacquer) All PFC boards were checked. Old version boards changed by upgraded ones PS3500 assembling and testing under 900W load was done (equivalent to ~1 mA/ch) Thermal inspection of components (during working on 900W load without cooling) was done All crates were assembled and its functionality was checked. All 8 crates have good state of its parts. Upgraded PFCs stay in all PS3500s. Few HV cells were replaced. One crate is repairing… waiting for PFCs from Dubna. 28 oct 2013 K. Zhukov, LPI Moscow

HV crates review, June ’13 All power supplies were disassembled and boards were covered with protection Electrofuge 200-ND to prevent dust shortages on pins. 28 oct 2013 K. Zhukov, LPI Moscow

HV crates test 900W load Thermal picture of power supply boards (left) and radiator of the crate without external cooling at output load 900W (without cooling). All temperatures on PS boards are in working ranges. No overheating observed. 28 oct 2013 K. Zhukov, LPI Moscow

HV SC508 Firmware upgrade In September 2013 Vitaly Shutov was at CERN and made the firmware upgrade for SC508 to work at higher baud rate. Jolanta made tests and it seemed it works well. See DCS talk for more details. 28 oct 2013 K. Zhukov, LPI Moscow

Plans for TRT HV in Nov-Dec 2013 Installing filters in rack cooling to prevent dust in air flow. It was decided to install some grids to prevent metallic debris falling on PS surfaces. Calibration checks for all HV channels (Kantserov V., Vasilyeva L.) from mid- of November. + capacity test(?) Cleaning racks in USA15, connecting cables to TRT. Investigation of over/under shoots events. That’s now a question how to simulate all things correctly… (e.g. is it enough RC-equivalent of cables, other things) 28 oct 2013 K. Zhukov, LPI Moscow

Thank you very much! 28 oct 2013 K. Zhukov, LPI Moscow