MEDICIS Facility Isotope Separator Controls and HMI

Slides:



Advertisements
Similar presentations
Climate Monitoring WEB Interface Using 1_Wire™ Sensors Imad Hoteit Hassan Wehbe.
Advertisements

Industrial Control Engineering Industrial Controls in the Injectors: "You (will) know that they are here" Hervé Milcent On behalf of EN/ICE IEFC workshop.
What is a Computer Network? Two or more computers which are connected together.
February 17-18, 2010 R&D ERL James Jamilkowski R&D ERL Controls Larry Hoff James Jamilkowski February 17-18, 2010 Controls.
ISOLDE Vacuum Controls (CERN-GSI WS), S. Blanchard TE-VSC-ICM UNICOS Vacuum Objects Specifications Review Sebastien Blanchard TE/VSC Interlocks,
Proposal for Decisions 2007 Work Baseline M.Jonker for the Cocost* * Collimation Controls Steering Team.
Case Study Computer Controlled Radiation Monitoring System
TPC/TRD DCS meeting, GSI, 27 Sep 2002Børge Svane Nielsen, NBI1 TPC laser system controls adjustable mirrors Laser Controls, Power, Cooling DCS: 1/ Laser.
FAIR Accelerator Controls Strategy
The Scheme of Slow Control System in BESIII Xie Xiaoxi Gao Cuishan
Linac-4 current situation and outlook U. Raich, F. Roncarolo, F. Zocca.
LHC Cryogenics Control: INTEGRATION OF THE INDUSTRIAL CONTROLS (UNICOS) AND FRONT-END SOFTWARE ARCHITECTURE (FESA) APPLICATIONS Enrique BLANCO Controls.
Roman Pot Engineering Design Review CERN, 14 February 2006 M.Oriunno, CERN PH-TOT Installation, Commissioning and Schedule.
Eugenia Hatziangeli Beams Department Controls Group CERN, Accelerators and Technology Sector E.Hatziangeli - CERN-Greece Industry day, Athens 31st March.
Control Hardware Design Control Hardware Wiring IOC Software (Low Level) OPI Software (High Level) Final Test Front-End (Connection to SR1 Ring) Done Insertion.
L. Arnaudon BE/RF/CS. Outline  RF systems description  Software environment  RF specialist requirements  RADE tools in use  ACS application  Low.
MA CS workshop Adriaan Rijllart1 LabVIEW integration into the LHC control system The LHCLabVIEW.
BP & RS: BIS & SLP for AB/CO Review, 23 h Sept Realisation of the interlocking between SPS, LHC and CNGS and open issues Beam Interlock Systems.
K.Hanke – PS/SPS Days – 19/01/06 K.Hanke - PS/SPS Days 19/01/06 Recommissioning Linac2/PSB/ISOLDE from CCC  remote operation from CCC  upgrades & changes.
Managed by UT-Battelle for the Department of Energy SCL Vacuum Control System Upgrade Derrick Williams
Connecting LabVIEW to EPICS network
CEA DSM Irfu SIS LDISC 18/04/2012 Paul Lotrus 1 Control Command Overview GBAR Collaboration Meeting Paul Lotrus CEA/DSM/Irfu/SIS.
MERIT review, Dec. 2005CERN AB-ATB1 CERN installation I. Efthymiopoulos, A. Fabich, J. Lettry CERN AB-ATB MERIT review, Dec.
Status of the AWAKE Control System Edda Gschwendtner, Janet Schmidt, Marine Gourber-Pace, Roman Gorbonosov, Peter Sherwood AWAKE Technical Board, 27 January.
Christophe Martin TE-MPE-EP 02/06/ The BIS and SMP activities during LS1 MPE Group Review, 2 June 2015 Christophe Martin, Stephane Gabourin & Nicolas.
ISOLDE Vacuum Controls (CERN-GSI WS), S. Blanchard TE-VSC-ICM UNICOS implementation in ISOLDE Sebastien Blanchard TE/VSC Interlocks, Controls.
Industrial Control Engineering ADE Rapid Application Development Environment.
Two half-day seminars on the remaining work packages to complete the MEDICIS Facility POWER CONVERTERS FOR MEDICIS Davide Aguglia & Julien Parra-Lopez.
Laser Control Status A. Masi, T. Feniet, K. Szczurek Awake Technical Board November 12 th 2015 Thanks for inputs from: M. Donze`, V. Fedosseev, C. Hessler.
PS Complex Controls Renovation S Baird AB/ABP ATC/ABOC Days: Session Jan 2008.
CMV-NET Chigo VRF Network Centralized Control System
Industrial communication networks
National Centre for Nuclear Research, Poland
Linac4-PSB 160 MeV connection readiness review
Target & Frontend Switch Yard & Collection Boxes Medicis Seminar, 2nd and 3rd March 2016 Stefano Marzari EN-STI & Vincent Barozier EN-ACE.
SCADA & Monitoring Developments for Vacuum
FCT and CERN Portuguese Trainee Programme Report
Controlling your PXI from the CCC
Control and Data Acquisition System for VEST at SNU
BI-day 2014, The SEM-grid renovation project Michel Duraffourg
The Elimed Control System approch
Performance of BI systems at HIE-ISOLDE
CV PVSS project architecture
Windows in BE-CO Terminal Servers, VirtualPCs, Consoles
LIU – EVM status and next steps
Configuration Management and Layout Database ELENA Project
EC Activities Status for the LIU
BE-BI Software for LINAC4
How SCADA Systems Work?.
352MHz Klystron Control for the 3MeV Linac test stand
Update on the Ethernet Network Installation Campaign
Network Management Checking Performance + Traffic & Configuration
Beam instrumentation for HIE-ISOLDE
DarkSide-50 Distributed Control System Towards DarkSide-20k
BE-CO Activities for PSB
M7 controls Cryo, vacuum, ODH information available
Development of built-in diagnostics in the RADE framework (EN2746)
Linac 4 Devices Controls and Monitoring Status
GIS Portal Racks Project
CSNS Accelerator Control and Beam Instrumentation JIN Dapeng, XU Taoguang … June 9, 2015
PERSPECTIVE ON MICROWAVE MONITOR AND CONTROL INTERFACES
How Computers Work.
TPC Detector Control System
PLC / SCADA / HMI Controllers: Name : Muhammad Zunair Comsats University Date: 28-October-2018.
Seamless Integration and Machine Upgrade
Special English for Industrial Robot
Installationsanleitung
Commissioning the European XFEL cryogenic system and best practice
Vacuum Control System for Monolith Vacuum
Presentation transcript:

MEDICIS Facility Isotope Separator Controls and HMI Cédric Charrondière EN-STI-ECE 2016-03-03

Cédric Charrondière EN-STI-ECE 2016-03-03 MEDICIS Kuka robot control PLC Supervision Kuka Robot Programming Front End Control & Interlocks Montrac Control Hot Cell Interfacing Slits controls Various cabling and integration work Offline Separator Control Cédric Charrondière EN-STI-ECE 2016-03-03

Objects to communicate with Each device can be driven by its own application (HMI) Working set WinCCOA …etc... Power supply Vacuum Gauss meter Motors (for slits) Have one unified / single user interface Slits Faraday cup Scanner Cédric Charrondière EN-STI-ECE 2016-03-03

Cédric Charrondière EN-STI-ECE 2016-03-03 Power Supply Contacts: Julien Parra-Lopez Michal Dudek Hardware TE-EPC-FPC Software TE-EPC-CCS HMI EN-STI-ECE Power converter PLC FESA ~22 devices: 9 beam line 1 converter 2 switch yard 9 targets 1 extraction Development ~ 40 days Read and Write Which parameters ? Cédric Charrondière EN-STI-ECE 2016-03-03

Cédric Charrondière EN-STI-ECE 2016-03-03 Vacuum Contact: Sébastien Blanchard Jose Antonio Ferreira Somoza Hardware TE-VSC-ICM Software HMI EN-STI-ECE Sectors Collection chamber PLC CMW WinccOA ~5 Devices Development ~ 5 days Read Which parameters ? Cédric Charrondière EN-STI-ECE 2016-03-03

Cédric Charrondière EN-STI-ECE 2016-03-03 Faraday CUP Contact: Gerrit Jan Focker Stephane Pedersen Hardware BE-BI Software BE-BI HMI EN-STI-ECE FESA 1 Device Development ~ 40 days Control Which parameters ? Cédric Charrondière EN-STI-ECE 2016-03-03

Cédric Charrondière EN-STI-ECE 2016-03-03 Scanner Contact: Gerrit Jan Focker Stephane Pedersen Hardware BE-BI Software HMI EN-STI-ECE FESA 1 Device Development ~ 40 days Control Which parameters ? Cédric Charrondière EN-STI-ECE 2016-03-03

Cédric Charrondière EN-STI-ECE 2016-03-03 Slits motors Contacts: Christophe Mitifiot Mathieu Donze Hardware EN-STI-ECE Software HMI Motors PLC FESA ? Devices Development ~ 60 days Control Which parameters ? Cédric Charrondière EN-STI-ECE 2016-03-03

Cédric Charrondière EN-STI-ECE 2016-03-03 Gauss meter Contact: Marco Buzio Hardware Software HMI EN-STI-ECE GPIB ? 1 Device Development ~ 5 days Read Which parameters ? Cédric Charrondière EN-STI-ECE 2016-03-03

Cédric Charrondière EN-STI-ECE 2016-03-03 communicate FESA 2 /3 GPIB RS232 …etc... Cédric Charrondière EN-STI-ECE 2016-03-03

Base for the application Isolde Offline Separator Designed in 2007 by a student in LabVIEW Maintain by myself from 2008 Driving power supplies Accessing GPIB and RS232 devices Cédric Charrondière EN-STI-ECE 2016-03-03

Cédric Charrondière EN-STI-ECE 2016-03-03 Manpower estimation Equipment Number Protocol Access ~Dev. time Power Supply ~22 devices FESA Read / Write 40 days Vacuum 5 devices Read 10 days Faraday cup 1 Control Slits motors ? 60 days Scanner ? 20 days ? Gauss meter FESA / GPIB 5 days Integration User Interface 30 days Testing 15 days Commissioning 20 days Manpower 280 days Cédric Charrondière EN-STI-ECE 2016-03-03

Cédric Charrondière EN-STI-ECE 2016-03-03 Manpower estimation Task Manpower (FTE) Material Budget (KCHF) Kuka robot control 0.2 5 PLC Supervision Kuka Robot Programming 10 Front End Control & Interlocks 15 Montrac Control 0.25 Hot Cell Interfacing 0.1 Slits controls 20 Various cabling and integration work Offline Separator Control 1 Total ~2 ~100 Cédric Charrondière EN-STI-ECE 2016-03-03

Cédric Charrondière EN-STI-ECE 2016-03-03 Summary The first runs could be made using device specific applications. The unified HMI would be put in production as soon as the hardware is stable. Manpower: ~280 days (12 months) Manpower Budget ~ 75 000 CHF Hardware Budget (PXI / PC / cards) from 1 000CHF to 10 000CHF People involved: Kevin Develle supervised by me Schedule: Kevin could start in March / April 2016 Kevin can start with Vacuum and Power Supply since it is similar to Isolde offline separator Missing I/O information for all the components Application could be ready end 2016 beginning 2017. Technology: LabVIEW and RADE Cédric Charrondière EN-STI-ECE 2016-03-03

Network and operating Systems Availability Windows or Real-Time? Network TN or GPN? Order switches? Access control room or office? Views publish data for office views? Do we need high availability? Can we rely on Windows or should we switch to Real-Time application? Do we connect on TN or GPN? Do user wants to access only from the control room? Do we need to publish data for office views? Cédric Charrondière EN-STI-ECE 2016-03-03

Cédric Charrondière EN-STI-ECE 2016-03-03 Thank you Do we need high availability? Can we rely on Windows or should we switch to Real-Time application? Do we connect on TN or GPN? Do user wants to access only from the control room? Do we need to publish data for office views? Cédric Charrondière EN-STI-ECE 2016-03-03