DMAIC Stages and Deliverables

Slides:



Advertisements
Similar presentations
Proposal / Request For Proposal Proposal / Request For Proposal Initiation Control Planning Close-down Execution.
Advertisements

Lean Six Sigma Project Presentation Template
Six Sigma Quality Engineering
Project Storyboard Template
Dr. Ron Lembke SCM 462.  Financial return  Impact on customers and organizational effectiveness  Probability of success  Impact on employees  Fit.
Supercharging DMAIC IT’S TIME TO USE THE POWER OF THE COLLECTIVE MIND.
Overview of Lean Six Sigma
6  Methodology: DMAIC Robert Setaputra. PDCA / PDSA PDCA / PDSA is a continuous quality improvement tool. PDCA is introduced by Shewhart. PDSA is Deming’s.
Overview of DMAIC A Systematic Framework for Problem Solving
Monitoring the Project
1. 2 What is Six Sigma? What: Data driven method of identifying and resolving variations in processes. How: Driven by close understanding of customer.
Managing Project Quality
Intro to LSS1 LSSG Green Belt Training Introduction to Lean Six Sigma.
Do not put content on the brand signature area Basic template Subtitle Location – Date Name of the speaker Job title.
Sense of Initiative and Entrepreneurship This project has been funded with support from the European Commission. This [publication] communication reflects.
Black Belt Level DMAIC Certification Checklist
DMAIC Process Storyboard
1 Project Name Team Lead Location Month XX, Year.
Black Belt Project Storyboard Template
ASQ Raleigh ASQ Raleigh Section 1113 Six Sigma SIG DMAIC Series.
1 Project Kick Off Briefing Cost Data Integrity Project August 30, 2007.
Practical Assessment Project Template
Define Tollgate Checklist
1 DMAIC Define Overview Paul Grooms Black Belt in Training.
Project Title GB or BB name: XYZ.
Introduction to Kaizen Introduction Kaizen Facilitation.
Project Storyboard (Page 1 of 2)
SOFTWARE PROJECT MANAGEMENT
© 2002 Six Sigma Academy Eliminate Waste Reduce Variability Growth Six Sigma Elements Designing products, services, and processes that satisfy both client.
© 2002 Six Sigma Academy Eliminate Waste Reduce Variability Growth Six Sigma Elements Six Sigma is a business philosophy that employs a client-centric,
Confidential, , MBX Template Book Confidential, ,
DMAIC Stages and Deliverables
DMAICTools.com thanks our industry partners for sharing their forms - use it, improve it, share it, send us back a better version!
Last Updated: MONTH, YEAR Team: M. W. (Team Leader)R. F. T. D.M.G. T. L.D. J. (Sponsor) Green Belt Project Objective: TITLE Green Belt Project Objective:
A Quick Review of the Components THE DMAIC CYCLE.
Measure Phase Wrap Up and Action Items. Measure Phase Overview - The Goal The goal of the Measure Phase is to: Define, explore and classify “X” variables.
Analyze Wrap Up and Action Items
TM 720: Statistical Process Control DMAIC Problem Solving

The DMAIC Method
Green Belt Project Storyboard Template See Green Belt Storyboard Checklist for required contents Visit GoLeanSixSigma.com for more Lean Six Sigma Resources.
Project Quality Management
Six-Sigma : DMAIC Cycle & Application
Lean Six Sigma DMAIC Improvement Story
Black Belt Project Storyboard Template Can be used in combination with Black Belt Storyboard Submission Guide Visit GoLeanSixSigma.com for more Lean Six.
Define Phase Wrap Up and Action Items
Practical Assessment Project Template
Lean Six Sigma DMAIC Improvement Story
DMAIC Project Template
Project Specification
OPS/571 Operations Management
Lean Six Sigma DMAIC Improvement Story
Framework for Success: DMAIC
Sarbanes Section 404 Readiness
Project Champion: Process Owner: Organization: Project Location:
Implementing Six Sigma Quality
DMAIC Roadmap DMAIC methodology is central to Six Sigma process improvement projects. Each phase provides a problem solving process where-by specific tools.
DMAIC STANDARD WORK TEMPLATE
Six Sigma DMAIC Process
DMAIC STANDARD WORK TEMPLATE
Six Sigma DMAIC Process
Measure Phase Wrap Up and Action Items
Introduction to Projects
Lean-Green belt six sigma program
Six Sigma DMAIC Process
Practical Assessment Project Template – DMADV
Six Sigma (What is it?) “Six sigma was simply a TQM process that uses process capabilities analysis as a way of measuring progress” --H.J. Harrington,
Project Planning Charter
Presentation transcript:

DMAIC Stages and Deliverables Define Measure Analyze Improve Control Minimum Define Stage Deliverables Clear problem statement/ tangible goal Financial / customer benefits agreed upon Initial team defined, Project Charter complete Critical Success Factors Management agrees this is a high-payback project and goals are achievable Highly focused problem statement and goal Project charter sets clear expectations (in/out of scope, project timing, risks, etc.)

DMAIC Stages and Deliverables Define Measure Analyze Improve Control Minimum Measure Stage Deliverables Process flowchart (ideally a value stream map) Measurement system validation Baseline performance (process capability) Critical Success Factors Accurate baseline data available (if not, measure report-out may be delayed) Gage R&R study completed (applies mostly to product measurements) Product & process subject matter experts are supporting the team

DMAIC Stages and Deliverables Define Measure Analyze Improve Control Minimum Analyze Stage Deliverables Major causes understood Bullet #1 supported with data Critical Success Factors Top causes must be proven, cannot rely on Fishbone Diagram (speculation) alone

DMAIC Stages and Deliverables Define Measure Analyze Improve Control Minimum Improve Stage Deliverables Team has controlled or eliminated top causes sufficiently to achieve project goal Proof of bullet #1 is indisputable, and the team has the capability of turning the problem “on” and “off” based on their control of the input variables Critical Success Factors See bullet #2 above

DMAIC Stages and Deliverables Define Measure Analyze Improve Control Minimum Improve Stage Deliverables Team has implemented appropriate controls in the organization to control the causes for the long run Permanent product/process design changes are implemented wherever possible to negate the need for a control plan Critical Success Factors If a control plan is needed, the business has a strong internal audit function to ensure long-term compliance CONTROL PLAN