Action People Time [h] Shutting down the SR 2 1

Slides:



Advertisements
Similar presentations
Safe Use and Operation of Vacuum Lines
Advertisements

Sessler Group Safety Talk Safe Operation of Vacuum System for Avoiding Danger of Liquid Oxygen Ren-Tsung Wu October 23 rd,
Sputter Stand Safety Specifics Electrical Hazards High Voltage : Electrical power is required for the high voltage supply, gauging, system controller and.
M. Jimenez AT/VAC Room Temperature (LSS) Vacuum Systems M. Jimenez.
Vacuum & Cooling Systems Updates F. Makahleh On behave of Vacuum & Cooling Group TAC 2013, F. Makahleh, Vacuum & Cooling 1.
AMS-02 Cryosystem Phase III Flight Safety Review January 12, 2010 Phil Mott.
SPECTRAP - GSI progress report and status overview.
1. Safe Use and Operation of Vacuum Lines, UCLA Chemistry and Biochemistry 2.
Fermilab Cavity Refurbishment Status J. Reid M. Slabaugh November 19, 2014 J. Reid 1.
Cabling and connectors for future LAV stations Mauro Raggi LAV working group CERN 26/10/2009.
Some results of vacuum stand investigation.. 1. Restoration of turbopump inlet valve V1 tightness The inlet turbopump valve of the first pump station.
30/05-03/06/2007 LCWS2007 and ILC2007, DESY Hamburg Germany Vacuum System Specifications What needs to be specified in Vacuum Specification for ICL Damping.
Acceptance criteria, Materials, Methods and Techniques for cooling plant construction DCP WP4 status 3 March 2010.
Workshop “Vacuum systems of Synchrotron Light Sources“ organized by MAX-LAB & ALBA Barcelona, th September 2005 Instrumentation and Vacuum Control.
CE 3372 Water Systems Design EPA-NET Pumps, Valves, Tanks.
Proton Source Vacuum Plan By David B. Augustine Ben Ogert Jr. August 30, 2011.
VELO workshop, Amsterdam, april ‘00M.Ferro-Luzzi Difficulties with current mechanical design recent FEA results: to obtain sufficient stiffness of center.
Vacuum Workshop on Vacuum Systems for Synchrotron Light Sources, Barcelona, Installation and vacuum conditioning, 12 th and 13 th September 2005 L. Schulz.
Experimental Beampipes: Status and Outlook Ray Veness / AT-VAC For the beampipe team With many thanks to the experiment’s installation and coordination.
24 January 2014 LARP VTF Follow-up Meeting P. Kovach VTF 1 LARP Vertical Test Facility Vertical Dewar Design, Magnet Prep And Installation Paul Kovach.
Measurement of Ge detector by New cooling KEK Apr 25 th K.Shirotori.
Accelerator and NuMI Upgrades Shutdown Update Cons Gattuso July 02, 2012 July 2, 2012 Cons Gattuso1.
Matthew Cox VSSLS Workshop Barcelona Sept SLIDE 1 1 Diamond Light Source Vacuum Systems Matthew Cox
Compressor status AWAKE Technical Board meeting 19 August 2015.
CMS FPIX Cooling System Studies Joe Howell, Fermilab for the FPIX Upgrade Mechanical Working Group CMS Upgrade Workshop April 27,
Spectrometer Solenoid Fabrication & Testing Update Steve Virostek Lawrence Berkeley National Lab MICE CM25 at RAL November 6, 2009.
41 st IUVSTA Workshop, Brdo pri Kranju, 21/06 – 24/06/2004 L. Schulz SLS Vacuum System Lothar Schulz Theo Bieri Nazareno Gaiffi Martin Steinacher.
Claudio Bortolin 03/09/2012. SPD (RP analyses required) 1) Pump 17b replacement and leak test 2)Pressure test on the old inlet lines (technicians coming.
Monday – VSP Room weekly checks Visually Check: Hvac system for leaks & valve settings Fresh water system for leaks & valve settings VSP linkage Autopilot.
E. Richards EE Chamber installation. Summary Position Of the EE chambers General view of EEL chambers EEL5 chamber Installation of other chambers ex.
11/4/2005OLAV 1 Workshop CERNW. Maan Fast Vacuum Valves at CERN -Introduction to fast valves -History of fast valves in use/used at CERN -LEP fast shutters.
Booster Pump/ Compressor Procedures Rescue 31 Operator Instructions.
Johan Bremer, 22th-26th September 2008 Cryogenics Operations 2008, CERN, Geneva, Switzerland 1 CRYOGENICS OPERATIONS 2008 Organized by CERN Safety aspects.
Vrije Universiteit amsterdam Milan, September 25, 2000 VELO System J.F.J. van den Brand LHCb Vertex Detector System: Status Report J.F.J. van den Brand.
2/17/2016 Recycler -Gattuso Recycler Shut Down Status  Flying Wire Status  Wire Vacuum Certified  Tunnel Bake Prep status Disconnection of BPM, Correctors,
April 2005OLAV Workshop Diamond Vacuum Controls Hugo S Shiers.
Installation of the T600 at Fermilab CSN2, September 22,
MTA Installation Meeting February 21, 2007 Agenda 1)Progress report (Fernanda+Carol) 2)Floor Plan layout (Fernanda+Larry) 3)AOB Key Red – critical Orange.
CW and High Average Power Workshop BNL The Diamond Storage Ring IOT based High Power Amplifier Morten Jensen on behalf of the SR RF Group.
Thomas Jefferson National Accelerator Facility Page 1 CEBAF Cryo & SRF Workshop April 3, 2014 Mathew Wright Cryogenic Systems Operations Engineer
F. Mazzolini for the ELETTRA Vacuum Group OLAV CERN, April 11– The ELETTRA vacuum system F.Mazzolini, L.Rumiz, J.Miertusova, F.Pradal, E.Mazzucco,
NML Cryogenic System Arkadiy Klebaner Cryomodule One Commissioning June 3, 2011.
Tracker cooling plant refurbishment Project status Revised plan Financial impact.
LANL Cost and Schedule Review 02/11/05 1 Cryostat (lower half) WBS 3.1, 3.5, 3.6, 3.7, 3.8, 3.10 Paul Huffman, Chris O’Shaughnessy North Carolina State.
1 MICE Hydrogen system Working group mtg – 01/09/14.
Progress and prospects in thermo-mechanical activities at Valencia Carlos Lacasta, Arantza Oyanguren 7th International Workshop on DEPFET Detectors and.
Installation of the T600 at Fermilab Fermilab, February 15,
1 Before degassing RGA head After degassing RGA head RGA scans of test dewar December 23, 2005 (PR and SP) Ion Gauge readings : Vacuum (with RGA off) before.
Wrong Presentation Put In
Report Technical Director Storage-Ring-Installation Completed
Final Design Cryogenic and mechanical configurations
Report on tests ongoing in Perugia
Installation of the T600 at Fermilab
1 K thermal model for QUBIC
He Plant, LN2 Systems and Commissioing
Proximity Cryogenics P&IDs Meeting
MICE Meeting at RAL, Oct-23, 2005
Proximity Cryogenics P&IDs meeting
AD consolidation activities in LS2
LARP Vertical Test Facility
Vacuum System Failures at HERA
Tuesday 11th September LHCb dipole presently fault off
To drain in hood 11 7 Attach to water line in hood
Freeze-Pump Thaw for degassing
INSTITUTE OF HIGH ENERGY PHYSICS
Overarching Commissioning Plan
Instructions: Adding refrigerant fluid to system
Safety Moment Vacuum Trap Safety.
(WBS ) Alan Wootton, LLNL April 24, 2002
Teleconference ACS – FREIA 19th June 2017
Presentation transcript:

An example: recovering from a leak in a vacuum joint of the storage ring Action People Time [h] Shutting down the SR 2 1 Removing the SR ceiling Filling the dewar with liquid nitrogen 0.5 Switching off local instrumentation and power supply Moving the pumping stations, dewar and mechanical tools to the SR 1+2 Dismounting/ remounting flanges, replacement of joint Starting vacuum and leak test 1.5 Starting bake-out of ion pumps Bake-out (ion pumps only) 16 Action People Time [h] Switching off the bake-out and cooling 1 2 Discharging the ion pumps, switching on the power supply and instrumentation 1.5 Removing the pumping stations, dewar and mechanical tools from the SR 2+2 Closing the SR ceiling “Searching” operation 0.5 OLAV Workshop CERN, April 11–12 2005 * People external to the vacuum group