EHV Data Pool Clean-up Initiative Presented by: Gareth Lim

Slides:



Advertisements
Similar presentations
E-Tagging Issue Work Group Raymond R. Vojdani, P.E.
Advertisements

Open Access Technology International, Inc.
RPEWG Present and Future Activities Boise, August 17, 2011 RPEWG Meeting 1.
Chair: Daniel Kuraspediani - BPA POWER WORLD USER’S WORK GROUP (PWUWG)
January TSS J. Gronquist, S. Kincic
NORTHWEST POWER POOL Reliability Update
WECC Joint Synchronized Information Subcommittee
Gene Henneberg, Chair Remedial Action Scheme Reliability Subcommittee
Phase Difference = Phase Difference = 0.05.
Frequency Response WECC Frequency Response Obligations Robert W. Cummings NERC Director of Reliability Initiatives and System Analysis WECC Operating Committee.
The Design Of A Web Document Snapshots Delivery System David Chao College of Business San Francisco State University.
January 2008 Texas Regional Entity Report. 2 Performance Highlights ●ERCOT’s Control Performance Standard (NERC CPS1) score for November – ●Scores.
03/22/07 TPTF meeting ICCP Quality Codes Bill Blevins/Frank Kendall.
Project System Protection Coordination Requirement revisions to PRC (ii) Texas Reliability Entity NERC Standards Reliability Subcommittee.
Network Address Translation External/ Internal/. OVERLOADING In Overloading, each computer on the private network is translated to the same IP address;
Joint Electric Scheduling Subcommittee Update February 18, 2014.
The Business Cycle  Definition: alternating increases and decreases in the level of economic activity, sometimes extending over several years.
Requirements Engineering Requirements Management Lecture-25.
ECC Task Force Webinar September 3, Peak Anti-Trust Statement Phase 1A Update webSAS Integration PSE Access Peak and the Task Force Next Steps.
CIIMS Update Stacen Tyskiewicz CIIMS Chair March 22, 2016.
RASRS Report to Operating Committee March 22, 2015 Gene Henneberg, Chair Remedial Action Scheme Reliability Subcommittee W ESTERN E LECTRICITY C OORDINATING.
Bert Peters Chair, Path Operator Task Force
RASRS Report to Operating Committee March 21, 2017
2017 WECC JSIS Report March 21, 2017.
NERC Published Lessons Learned
NERC Published Lessons Learned Summary
Stacen Tyskiewicz CIIMS Chair July 12, 2016
NERC Published Lessons Learned
Interchange Scheduling & Accounting Subcommittee
Stacen Tyskiewicz CIIMS Chair October 18, 2016
EAS Lessons Learned Summary
WECC Regional Standards Update
NERC Published Lessons Learned Summary
TOP-003 Task Force Webinar Update
ERCOT Technical Advisory Committee June 2, 2005
Western Electricity Coordinating Council
TOP-003 Data Library Detail Design Discussions October 5th, 2016
THE STEPS TO MANAGE THE GRID
Terry Baker Peak Reliability
Mgr. Interconnection Reliability Initiatives
Western Electricity Coordinating Council
“TOP-010-1: Data Quality, Analysis Quality, and Alarm Process Monitor”
Standard Review Subcommittee Update
WECC RC Forum October 12, 2018.
ECC Readiness and Cutover May 15, 2017
WECC Annual Meeting 9/11/2018 Cameron Warren
Improving the structure of existing code
Update on Progress July, 2018
Experience the Magic of Online Ordering
Rich Hydzik, Avista NWPP RSGC Vice-Chair
Scott Downey Director of Compliance
PacifiCorp-CAISO-NVE EIM Initiative Overview
Contractor Sourcing Application (CSA) Training
Western Electricity Coordinating Council
Tyler Butikofer Associate Engineer II
2017 WECC JSIS Report March 21, 2017.
WISP Follow on Reporting.
PacifiCorp Overview Choose from three different title slide designs by selecting “New Slide.” These slides are suitable for business and community presentations.
Update on Progress July, 2018
WECC Annual Meeting 9/11/2018 Cameron Warren
WECC Joint Synchronized Information Subcommittee
Hongming Zhang EMS Applications Manager, PEAK RC
WECC RC Forum October 12, 2018.
WECC – NERC Standards Update
Tyler Butikofer Associate Engineer II
Engine Part ID Part 1.
Engine Part ID Part 2.
Engine Part ID Part 2.
Bert Peters Chair, Path Operator Task Force
Simulated vs. Real Hourly Dispatch Resource Adequacy Forum Technical Committee Meeting October 1, 2010.
Presentation transcript:

EHV Data Pool Clean-up Initiative Presented by: Gareth Lim October 4th, 2016 Presented by: Gareth Lim

Real-Time ICCP Data Exchange Peak administers & maintains the EHV Data Pool ICCP system, used to exchange ICCP data between TOPs Peak RC Used ICCP Points External Entities ICCP System Peak RC ICCP System Peak Generated ICCP Points Peak Hosted EHV ICCP System ICCP Points Not Used by Peak RC

Real-Time ICCP Data Exchange ICCP Link No. of Points AESO 8215 AESO_T 8425 AVA 12 AZP2 2270 AZPS 36 BCHA 2607 BHPL 2601 BPA 28767 CFE 4463 CHPD 2 CSU 1109 EHV_CASC 37210 EHV_CISO2 7915 EHV_CISO3 2449 EHV_SRP EHV_WACM 168 EPE 195 IID 1654 ICCP Link No. of Points LDWP 12 NERC 11394 NVE 430 PACE 3 PACW 58 PNM 153 PSC PSE 1032 SCE 1934 SCL2 736 SDGE1 786 SMCL 12776 TEP 29 TSGT 1 WALC 164 WAUW 2726 Grand Total 140347 * As of June 2016 ** Does not include Points historically exchanged on EHV

EHV Data Pool ICCP System Original EHV Data Pool ICCP System inherited from WAPA Original Database includes 800+ ICCP Points being exchanged at that time Original Database ICCP Points Naming convention includes old practice of renaming ICCP Object IDs Peak appended 150,000+ (and growing) ICCP points to the original database Includes duplication of ICCP points (Original + Renamed ICCP points)

EHV Data Pool Clean-up Initiative EHV Data Pool Clean-Up Initiative intended to: Remove Old Invalid (likely Retired) ICCP points Remove Duplication of Data Retire Old Practice of Renaming ICCP IDs Categories: No Active Readers ICCP Points [135 points] EHV Only – Invalid ICCP Points [161 points] EHV Only – Valid ICCP Points [329 points] Peak Pass Through ICCP Points [207 points]

EHV Data Pool Clean-up Initiative Clean-up Phase 1: No Active Readers ICCP Points [135 points] Remove ICCP Points with No Active Readers

EHV Data Pool Clean-up Initiative Clean-up Phase 2: EHV Only – Invalid ICCP Points [161 points] Notify Active Readers of Plans to Retire / Remove EHV Only – Valid ICCP Points [329 points] Create ICCP Points with Original ICCP IDs Provide Permissions to Original ICCP IDs Notify Active Readers requesting transition from Renamed Point IDs to Original Point IDs Peak Pass Through ICCP Points [207 points]

Gareth Lim Manager, Model Engineering glim@peakrc.com