SA1 Report to TSG SA-34 SP-060___

Slides:



Advertisements
Similar presentations
World Class Standards TC SCP TEC Status Report to TC SCP Plenary #49 Paul JOLIVET, Chairman, LG Electronics Sebastian HANS, Vice chairman, Oracle SCP(11)0177.
Advertisements

1 Development and evolution of 3GPP Core Network Hannu Hietalahti, CT chairman.
© 3GPP 2009 Mobile World Congress, Barcelona, 19 th February 2009© 3GPP GPP The Training Course / Module 10 1 All you always wanted to know about.
Fostering worldwide interoperabilityGeneva, July 2009 Global Standards Collaboration (GSC) 14 DOCUMENT #:GSC14-GTSC7-005R1 FOR:Presentation SOURCE:TIA.
Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All ETSI Standardization Activities on M2M communications Joachim Koss, ETSI Board Member Document No:
ATIS & TISPAN JOINT MEETING ON NGN Washington D.C., 1 April 2005 MEETING SUMMARY Draft v2 (4 April 2005) Based on Notes from David Boswarthick (ETSI),
22-23 June 2004TISPAN-3GPP Workshop - Sophia-Antipolis 1 Joint 3GPP & TISPAN Workshop on NGN-IMS - NGN-IMS issues handling - Alain Le Roux (France Telecom),
30-31 March 2005 Workshop "IMS over Fixed Access" - Washington 1 TISPAN_NGN Project plan Martin Niekus Alain Sultan
Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All IPTV in ETSI Bruno Chatras, ETSI TC TISPAN Vice-Chairman Document No: GSC16-PLEN-09 Source: ETSI.
World Class Standards WG8 presentation of current Subscription Management Activities TISPAN WG8 – 3GPP SA#5 Joint meeting Sophia Antipolis, May14th - 15.
1 An Analysis of 3GPP and 3GPP2 Requirements for Common IMS January 2008 Source:Aleksandar M. Gogic, Chair TSG-S WG-1.
Proposed Co-convened WG1/2 Objectives, Schedule, and Activities Group Name: TP#1 Source: Omar Elloumi (Alcatel-Lucent), Laurent Laporte (Sprint) Meeting.
Recommendations for transfer from TISPAN to 3GPP SP For information Source: Goran Engstrom: TISPAN WG1 chairman Stephen Hayes: 3GPP SA Chairman.
1 LTE standards Status for this work in 3GPP and what next for the Future Francois COURAU 3GPP TSG RAN Chairman.
Doc.: IEEE /209r0 Submission 1 March GPP SA2Slide 1 3GPP System – WLAN Interworking Principles and Status From 3GPP SA2 Presented.
TSG-S Project Coordination Recommendations Nick Yamasaki TSG-S Chair ABSTRACT: This document presents TSG-S recommendations for improved coordination of.
WG 2 Progress Report at TP#9 Group Name: oneM2M TP #9 Source: WG2 leadership Meeting Date: /21 Agenda Item: WG Reports.
IMS developments in 3GPP
Recent Results of JCA-NID and TSAG Byoung Nam LEE HyoungJun KIM ETRI, Korea.
Page 1TTT - May 12, GPP IMS Standardization Update Bell Labs Innovations Lucent Technologies Room 9C Lucent Ln. Naperville, IL E Mail.
Proposed Co-convened WG1/2 Objectives, Schedule, and Activities Group Name: TP#1 Source: Omar Elloumi (Alcatel-Lucent), Laurent Laporte (Sprint) Meeting.
IEEE MEDIA INDEPENDENT HANDOVER DCN: Title: Proposed Presentation for 3GPP Date Submitted: September,
WG5 – MAS#22 Status Report Group Name: WG5 MAS (Management, Abstraction & Semantics) Source: Tim Carey(Alcatel-Lucent, WG5 Vice Chair) Meeting Date:
TSG-S OMA (Open Mobile Alliance) Ad-Hoc Report Richard Robinson Chair - 3GPP2 TSG-S SC D.
ETSI TCCE WG4 work G. Marque-Pucheu (Airbus / ETSI TCCE WG4) 26-27/08/ 2014.
3GPP TSG RAN WG2 meeting #92 Nanjing, China 23-27, May 2016 R
Doc.: IEEE /1060r1 Submission September 2013 S. Rayment, Ericsson & S. McCann, BlackBerrySlide 1 3GPP Liaison Report Date: Authors:
Month Year doc.: IEEE yy/xxxxr0 July 2017
IEEE MEDIA INDEPENDENT HANDOVER
Review of new Question descriptions under ITU-T SG11
Update on 3GPP RAN3 Multi-RAT joint coordination
CT WG6 status report to TSG CT #75
ETSI–3GPP NGN ACTIVITIES
ETSI–3GPP NGN ACTIVITIES
WG2 - ARC TP#29 Status Report
3GPP interworking in R3 Group Name: ARC
WPM ad-hoc group report TP#25
WG2 - ARC TP#29 Status Report
Bruno Chatras, ETSI TC TISPAN Vice-Chairman
China Communications Standards Association ZTE Corporation, P.R. China
SA1 Report to TSG SA#41 SP draft1
GSC-EM TF goal, as defined initially
Service requirements from 3GPP TS
SA WG6 status report to TSG SA#77
Motivation for WI on "LTE-based V2X Services"
ETSI Standardization Activities on M2M communications
July 2010 doc.: IEEE /0xxxr0 A summary of draft LS from 3GPP in response to IEEE 802 LS in March May 2017 Authors: Name Company Phone.
3GPP Status.
Outcome TFCS-11// February Washington DC
Glenn Parsons, GTSC-9 Chair, ISACC
5G Architecture Standardization Landscape in 3GPP
IP Project and NGN issues in SG13 Jean-Yves Cochennec France Telecom SG13 Vice Chair SSG – SG13 meeting, Nov 5th /19/2018.
IEEE MEDIA INDEPENDENT HANDOVER
IP and NGN Projects in ITU-T Jean-Yves Cochennec France Telecom SG13 Vice Chair Workshop on Satellites in IP and Multimedia - Geneva, 9-11 December 2002.
3GPP and Fixed Mobile Convergence
July 2010 doc.: IEEE /0xxxr0 A summary of draft LS from 3GPP in response to IEEE 802 LS in March May 2017 Authors: Name Company Phone.
IEEE MEDIA INDEPENDENT HANDOVER DCN:
GISFI #5 Meeting Report: SIG (Special Interest Group)
IEEE MEDIA INDEPENDENT HANDOVER DCN: bcst
IEEE MEDIA INDEPENDENT HANDOVER DCN:
IEEE MEDIA INDEPENDENT HANDOVER DCN:
Progress report of GRSG informal group
IEEE MEDIA INDEPENDENT HANDOVER DCN:
ETSI–3GPP NGN ACTIVITIES
Dino Flore TSG-RAN Chairman Balazs Bertenyi TSG-SA Chairman
Glenn Parsons, GTSC-9 Chair, ISACC
DSG Governance Group Recommendations.
Hans, KIM TTA Release approach and CJK requirements Hans, KIM TTA
3gpp-liaison-report-may-2005
Senior Telecommunication Adviser, Swisscom
Presentation transcript:

SA1 Report to TSG SA-34 SP-060___ TSGS#NN(0n)nnnn SA1 Report to TSG SA-34 SP-060___ Michele Zarri 1

– I – General information and statistics

SA1 Leadership Chairman: Michele Zarri (T-Mobile) Secretary: Michael Clayton (MCC) Vice-chairs: Paul Carpenter (RIM), Elected at SA1#28 (April 2005) Jörg Swetina (Siemens), Elected at SA1#31 (February 2006)

SA1 Sub Working Groups Convened during SA1-34 Network Composition Public Warning Systems Paging Permission with Access Control System evolution requirements Services migration Priority Customized Alerting Tones Converged MultiMedia Conferencing Not convened during SA1-34† M2M † the SWGs in this category will be closed if not meeting for two plenary cycles

SA1 Sub Working Groups New Sub working groups (depending on number of inputs) IMS Sub working groups that will be closed M2M

Meetings Held SA1 Plenary SA1 CAT SWG SA1#34: 23 Oct – 27 Oct 2006 Paris, France E3F SA1 CAT SWG 19 Oct – 20 Oct 2006 EF3

SA1 General Progress Work well under way for Release 8 with several work items close to completion Agreed 6 new work items which may be included in Release 8 Handled a very large number of documents and wide variety of topics TS 22.278 (requirements for evolved 3GPP system) delivered on schedule Addressed all the action items allocated by TSG SA.

SA1 General Progress Received a presentation from Mr Pascal Benois (Sagem) on the GSM Direct Mode of Operation. A work item to introduce this concept in the 3GPP system was agreed during the meeting (see here <link!>) Received a presentation from Mr Robert Sarfati (chairman of ETSI TC-RT) on the latest activity of this group and discussed the future cooperation between the two groups.

SA1 General Progress statistics Received 35 Liaison statements Agreed 24 Change requests Agreed 9 new work items or revised WIDs Sent 14 liaison statements Agreed 4 TS and/or TR for information or approval Handled 476 documents

SA1 Documents

SA1 Plenary meetings calendar

– II – Sub Working Groups

Sub working groups summaries (I/II) Converged Multimedia Conferencing (chaired by Jörg Swetina from Siemens) Network Composition (chaired by Cornelia Kappler from Siemens) Priority (chaired by Jim Garrahan from Telcordia) Public warning system (chaired by Frederic Thepot from DoCoMo)

Sub working groups summaries (II/II) System Evolution requirements (chaired by Randy Wohlert from AT&T) Services Evolution and Migration (chaired by Paul Carpenter from RIM) Paging Permission with Access Control (chaired by Tsuyoshi Takakura from DoCoMo) Customized Alerting Tones (chaired by Peter Bleckert from Ericsson)

Services Migration SWG Statistics: 22 participants Discussed 2 documents Progress Created the first version of the technical report on services migration

Network Composition SWG Statistics: 3 sessions of the NWC SWG were held on Tuesday and Wednesday. 8 - 16 delegates attended the SWG meeting 19 contributions to TR 22.980 from 7 companies were handled. The meeting could agree 11 contributions to be included into TR 22.980. Progress: Clarification of terminology Concept and use case for multi-party composition was included

Network Composition SWG Progress: Requirements for decomposition and compensation were added Most sections are nearing completion The Conclusion section was agreed TR 22.980 ready to be presented to SA for information For the next meeting contributions on the following topics are expected Use case and requirements for “service continuity” Streamlining terminology

Public Warning System SWG Meeting Statistics: 2 sessions of the PWS SWG were held 28 delegates attended the SWG meeting from 23 companies 1 LS and 10 contributions to TR 22.968 from 5 companies were handled. The meeting could agree 5 contributions text to be included into TR 22.968. Progress on TR 22.968 Tsunami use case has been introduced Aspect of Urgent messages More UE control understanding

Public Warning System SWG No requirements from the FCC before 2008 For the next meeting contributions on the following topics are expected: Mapping of CAP to PWS categories Aspects derived from Tsunami use case The Work item description needed modifications to take the new “regional” requirements situation into account

System evolution requirements SWG Body

Priority SWG Meeting Statistics Progress 16 participants from 14 companies 7 input documents, 4 output documents Progress The meeting agreed to update the WID for Multimedia Priority Service specification to address an action item from SA#33. The meeting agreed to TS 22.xyz, “Multi-media Priority Service – Stage 1” (version 0.1.0) to be used as a basis for contribution to this meeting. The meeting agreed to text for the Charging, Security, and High Level Requirements clauses for TS 22.153, “Multi-media Priority Service – Stage 1” (version 0.2.0).

Priority SWG Progress The Rapportuer prepared version 0.2.0 to reflect meeting agreements and to be used as a basis for contribution to the next meeting. The meeting reviewed the Use Case related to Priority Service for work on Paging Permission with Access Control

Paging permission with access control SWG Meeting statistics 9 documents, handled in two sessions 17 participants from 14 companies Progress Introduction of TR 22.908 skeleton Introduction of use cases and corresponding consideration Editorial modifications and corrections For the next meeting Consideration regarding access control related use-case Other possible use-cases and corresponding consideration Gap analysis on current service

Converged Multimedia Conferencing SWG Meeting Statistics 2 sessions of the Converged MultiMedia Conferencing (CMMC) SWG were held on Wednesday. 20 delegates attended this very productive meeting, handling 9 documents and agreeing on 2. Progress on TR 22.948 The structure of TR 22.948 was agreed and initial text to the first 5 chapters could be agreed The TS will contain a description of Converged Multimedia Conferencing, proposed requirements and a section on Considerations on re-use of existing Conferencing capabilities

Converged Multimedia Conferencing SWG Progress on TR 22.948 Not all contributions could be handled fully. The parts, that could not be dealt with at this SWG meeting will be re-submitted at the next meeting The updated version 0.3.0 of the TR 22.948 distributed on email soon after the meeting.

Customized Alerting tones SWG Meeting Statistics Before SA1: 2 days meeting with 9 delegates from 7 companies The SWG handled 10 input documents- all were handled. During SA1: The SWG had in total 9 delegates from 9 companies. SWG had 3 input documents – all were handled. Progress on TR 22.982 before SA1 9 contributions (mostly editorial) to TR 22.982. One LS to OMA TP was discussed and suggested to SA1#34. A new basic structure of the TR was agreed but not implemented due to time constraints.

Customized Alerting tones SWG Progress on TR 22.982 during SA1 The SWG had 1 contribution suggesting to restructure TR 22.982 The TR 22.982 considered to be more then 90% ready and version 1.3.0 made available to SA1#34. The SWG also recommended to send a LS to OMA TP to synchronize the activities on CAT. The group prepared TR 22.982 to be sent for approval to TSG SA

– III – Work plan

Release 7 Update

Work Items and study items update (Rel-7) Feature, Building block or task Service Requirements for IP-based emergency calls Stage 1 for Enhancements of VGCS for public authority officials Stage 1 of PNPAM Stage 1 of MTSI Stage 1 for VCC Towards A-GNSS Concept Network Composition MBMS Enhancements Stage 1 for CSICS Stage 1 for CAMEL Trunk Triggers Add padding to balance the slide Legend Status updated No update in this meeting Completed continued...

Work Items and study items update (Rel-7) Service Requirements for VGCS improvements Stage 1 of SDoUE Study of PNPAM Service Requirements for OSA Service Broker Stage 1 on Session Continuity Stage 1 of NSP ...continued Add padding to balance the slide Legend F: Feature BB-1: BB, feature in SA1 BB-O: BB, feature in other group

Work Items and study items update (Rel-7) Study of Customised Alerting Tone (CAT) Requirements Behaviour of Multi system UEs Feasibility Study on Combining CS calls and IMS sessions Study on Videotelephony service requirements Review of Network Selection Principles Multimedia Priority Service Transferring of emergency Call data Study of (MITe) - IMS Multimedia Telephony Communication Enabler and supplementary services IMS Multimedia Telephony Service Add padding to balance the slide

Service Requirements for IP-based emergency calls Activity at SA1-34: Agreed a change request to remove the requirement for an global IMS emergency calls identifier WID status No update to the WID

Stage 1 for Enhancements of VGCS Activity at SA1-34: Agreed 5change requests to 22.004, 42.068 and 42.069 Some other change requests that corrected mistakes in pre Rel-7 versions of these specifications were not agreed. WID status No update of the WID, however SA1 would like to invite TSG SA to consider if this feature should be moved to Rel-8

Stage 1 of PNPAM Activity at SA1-34: WID status Agreed 3 change requests to TS 22.259 to clarify some aspects related to simultaneous access WID status No updates to the work item which is still considered complete

Stage 1 of MTSI Activity at SA1-34: WID status Agreed 3 change requests; one CR to remove the requirement to align the supplementary service settings between CS Speech and IMS Multimedia Telephony, one CR to clarify that ODB is part of release 7 and one CR to clarify the purpose with the media component list. WID status No updates to the work item which is still considered complete

Study of Customised Alerting Tone (CAT) Activity at SA1-34: Prepared TR 22.982 for presentation for approval at this TSG SA meeting. WID status The study item is considered to be completed and a proposal has been made to start the specification work.

Stage 1 for VCC Activity at SA1-34: WID status Agreed one change request clarifying the call hold and call waiting applicability to VCC. WID status The work item is still considered completed

Release 8 update

Work Items and study items update (Rel-8) Requirements for evolution of the 3GPP system architecture Multimedia Priority Service in Emergency Situations Emergency Data Transfer requirements BS30 enhancements for videotelephony SA1 aspects for EVA Stage 1 of ISB Local Charging Zone Requirements Add padding to balance the slide

Work Items and study items update (Rel-8) Facilitating Machine to Machine Communication in GSM and UMTS (M2M) Study of Requirements of IP-Multimedia Subsystem (IMS) Multimedia Conferencing Study on support of a Public Warning System (PWS) Paging permission with Access control All-IP Network Feasibility Study Stage1 for All-IP networks Add padding to balance the slide

Requirements for 3GPP System Evolution Activity at SA1-34: TS 22.278 presented to TSG SA-34 for approval See here for details WID status The SA1 task is now complete although some additional change requests to TS 22.278 are expected at the next SA1 meeting

Multimedia Priority Service Activity at SA1-34: A new version of TS 22.253 has been created and is expected to be presented for information at the next TSG SA 35 meeting WID status The work item was updated as follows

Emergency Data Transfer requirements (eCall) Activity at SA1-34: A change request to 22.101 has been agreed A liaison statement was sent to TSG SA WG4 to give guidance on the requirements that SA1 has formulated WID status The SA1 task with regards to this work item is complete

Machine to Machine Communication Activity at SA1-34: The TR 22.868 has been updated: some terminology modification and update of smart card applications The TR is expected to be presented for approval at the next TSG SA-35 meeting WID status On track (presentation of TR for approval expected at TSG SA-35)

Study on IMS Multimedia Conferencing Activity at SA1-34: Work has started on a new TR and progressing well WID status On track (presentation of TR for information forecast for TSG SA-36)

Study on support of a Public Warning System Activity at SA1-34: Produced a new version of TR 22.980 WID status The work item was updated to remove the dependency on regional regulatory requirements

Paging permission with Access control Activity at SA1-34: Started the drafting of the new Technical report WID status The work item description was updated

New Work Items

New Work Items and study items Study on GSM DMO (SI) WI on Support for CAT service (WI) WID for network selection for I-WLAN (WI) Study on Supplementary Service for Short Message Service (SMS-SS) (SI) Simultaneous access to multiple networks (SI) WID for proposed study for incorporation of non 3GPP networks selection (SI) (WI = Work Item, SI = Study Item) Add padding to balance the slide

Study on GSM Direct Mode of Operation GSM Direct Mode Operation (DMO) allows mobile-to-mobile radio communications of a predefined group of DMO service subscribers in half duplex mode without the help of any ground infrastructure using the GSM technology. The objectives of this WID are to identify the requirements of GSM-DMO that apply to 3GPP specifications as well as the impact of introducing GSM-DMO in the 3GPP system. New!

WI on Support for CAT service The objective of this work item is to make the technical specification for requirements that need to be standardized for CAT, especially additional features of CAT. Multiple domains roaming/interworking and interaction with other services such as IMS based services (e.g. MITe), Supplementary Services, Charging and User profile will be specified as well, based on the study on Customized Alerting Tone Requirements (TR 22.982). New!

WID for network selection for I-WLAN The objective of this WI is to integrate requirements for the selection of I-WLAN access into the existing PLMN network selection mechanisms and define these in one specification. The changes agreed for PLMN network selection will therefore apply to I- WLAN also New!

Study on Supplementary Services for SMS The objective of this study item is to document the requirements of value added services for SMS, and identify which can be met by existing solutions and which could be candidates for future standardisation. New!

Simultaneous access to multiple networks Some FMC scenarios require seamless roaming and handover between a GSM/GPRS/3G mobile network and a WLAN. The fixed and mobile networks may be independently authenticated. To maintain the quality of the customer experience, seamless handover is also important. The objective of this work item is therefore to determine the requirements for seamless roaming and handover between a GSM/GPRS/3G mobile network and a WLAN. New!

Incorporation of non 3GPP networks selection The objective of this WI is to study how a UE which can support both cellular and non 3GPP access performs the network selection procedures. The study could lead to a further work item to update TS22.011 to include selection of these access types. New!

– IV – Items highlights & Questions

Item Highlight SMS service level interworking The meeting discussed a proposed work item description on SMS service level interworking but could not reach consensus. A show of hands indicated that the majority of the delegates were in favour of sending the WID for approval at SA. Concerns raised included the following: The objectives of the WID can already be met (Vodafone, Siemens, Motorola) More time is needed to assess the interaction with OMA SA1 would like to ask guidance to SA to break the deadlock

Other Issues/highlights Study items on 3GPP system interaction with non-3GPP system At TSG SA-33 it was stated that generic solutions for support of non-3GPP accesses are preferred. SA1 has therefore started two study items investigating the interaction between 3GPP and non 3GPP access technologies. SA1 would like SA to confirm the above statement therefore allowing the progress of the study and eventually the start of work items on the subject. Changes to frozen releases for VGC Body Any other?

– V – Action Items

Actions on WG1 allocated during SA#33 (I/XII) A32-06 MBMS.3: request for performance requirements (SP-060410) RAN requested TSG SA WG1 to review document TD RP-060220 (CR to 25.913) and to comment on the overall service requirements related to Broadcast in LTE MBMS. Status: SA1 has agreed a change request on the subject and produced a reply to TSG RAN. CLOSED

Actions on WG1 allocated during SA#33 (II/XII) AI33-01: MITe.1 Supplementary services alignment TSG SA asked SA1 to remove from the Release-7 version of TS 22.173 the requirement to align the supplementary services provided in the CS domain and in PS domain. Status: SA1 has created a Release 7 CR to remove the requirement for aligning the supplementary services in the CS and PS domain as requested and submitted it for approval at this TSG SA. CLOSED

Actions on WG1 allocated during SA#33 (III/XII) AI33-02: LCS.1 Status of LCS for I-WLAN TSG SA asked SA1 to provide information on the status of the requirements for LCS for I-WLAN. This information will be needed in order to update the work plan. Status: As far as SA1 is concerned the work is finished. SA1 is now waiting for SA2 to progress the work and will check if updates to the stage 1 are needed as a consequence of SA2 decisions. CLOSED

Actions on WG1 allocated during SA#33 (IV/XII) AI33-03: USIM.1 change of USIM on the fly TSG SA WG3 (SA3) presented a change request to TS 33.220 (CR 101 in SP-060496) where they propose to prevent the possibility of changing the active USIM application as a result of the invocation of a service. TSG SA asked SA1 to verify that there is no requirement to perform USIM change on the fly. If instead a requirement exists for this functionality a change request to Release 8 should be created. Status: SA1 has not addressed this topic in the meeting. OPEN

Actions on WG1 allocated during SA#33 (V/XII) AI33-04: SMS-IP.1 Requirements for SMSIP TSG SA WG2 (SA2) presented TS 23.204 (“Support of SMS and MMS over generic 3GPP IP access; Stage 2 (Release 7)”) for approval, however it was noted that some of the contents of section 4 are more suitable for a stage 1 document. As a consequence TSG SA has asked SA1 to include the relevant requirements in the suitable 22 series document. It should also be noted that TSG SA asked TSG SA WG2 to remove the MMS from the title. Status: SA1 has agreed a number of change requests addressing this issue. CLOSED

Actions on WG1 allocated during SA#33 (VI/XII) AI33-05: SMS-IP.2 Change request on messaging interworking The change requests on “Requirements for supporting SMS/EMS/MMS in IMS (Rel-7, Rel-8)” in document SP-060469 were sent back to SA1 for further elaboration. The revision of the change requests sent back to SA1 should be created under a new work item. Status: See slide <link!> . OPEN

Actions on WG1 allocated during SA#33 (VII/XII) AI33-06: MPS.1 Rename the TS “Multimedia Priority Service Requirements” During the presentation of the new work item on Multimedia Priority Service it was noted that it would be worthwhile to modify the name so that it is differentiated from the feasibility study TR 22.953. TSG SA tasked SA1 to rename the work item as well as the deliverable to avoid confusion as well as to adopt this as a general rule. Status: SA1 has approved a revision of the work item which is presented to this TSG SA. CLOSED

Actions on WG1 allocated during SA#33 (VIII/XII) AI33-07: SAE.1 continuity of voice service between evolved 3GPP system and legacy TSG SA asked SA1 to consider to extend the requirement on continuity of TS11 at domain and RAT changes to cover also emergency calls (TS12). Status: A contribution on the subject was agreed to be included in TS 22.278 which is presented to this plenary for approval. CLOSED

Actions on WG1 allocated during SA#33 (IX/XII) AI33-08: SAE.2 Question on QoS for LTE from TSG RAN A liaison statement from TSG RAN (SP-060605) on on minimum number of supported SAE bearers in the UE was presented for information to TSG SA. It was asked if the question was going to be relevant also for SA1 (which is copied in the LS). TSG SA decided to ask SA1 to provide a reply to TSG RAN if so they wish. Status: SA1 has handled the LS from TSG RAN but did not agreed on a reply. Further clarification of described use cases from TSG SA2 need to be provided before replying. OPEN

Actions on WG1 allocated during SA#33 (X/XII) AI33-09: CAT.1 Interaction with OMA The Customized Alerting Tones feasibility study (TR 22.982) was presented for information at TSG SA. It was noted that a similar activity has recently started in OMA therefore there is a need to evaluate the potential overlapping of activity in this area. SA1 should produce a liaison statement. Status: A Liaison statement has been sent to OMA TP on the subject. CLOSED

Actions on WG1 allocated during SA#33 (XI/XII) AI33-10: eCall.1 Revision of change requests Change Request 195 to 22.101 on eCall in SP-060481 has been sent back to SA1 for further elaboration. TSG SA asked SA1 to review it in light of the additional questions raised by TSG SA WG4 on the subject and warned against the use of terminology such as E112. Status: SA1 has agreed a change request in line with the expectation of TSG SA (hopefully) and replied to the SA4 liaison statement. CLOSED

Actions on WG1 allocated during SA#33 (XII/XII) AI33-11: PWS.1 Liaison statement from TIA TR47 TSG SA received a liaison statement SP-060675 from TIA TR-47 where this group highlighted their intention to contribute to the ongoing PWS activity. TSG SA asked therefore to provide a reply to this liaison statement. TIA TR-47 was added to the list of the 3GPP liaison partners. Status: SA1 PWS SWG has proposed a reply LS which was later on approved by SA1 and sent. CLOSED

– VI – Documents for information and approval

Documents from SA1 to SA (I/II) Colour coding Information Change request Technical specification/report Work Item Description