Project Location.

Slides:



Advertisements
Similar presentations
Site selection and setting out Biogas ToT Course May 10 – 15, Kampala, Uganda.
Advertisements

CalARP - Examination of Chemical Processes: Drinking Water Treatment
Visalia WCP Trickling Filter Upgrade Project 1994/1995 Trickling Filters, Pump Station and Flow Control Box Modifications.
North Texas Municipal Water District Water Treatment Process.
SYSTEM-WIDE PROCESS CONTROLS UPGRADE Detroit Water & Sewerage Department.
D E P E N D A B L E N A T U R A L G A S Customer Webex July 25 th, 2013.
Cheshire Elementary School Sanitary Sewer Improvements Preliminary Informational Meeting April 13, 2009.
Surface Water Treatment Plant
CONFIDENTIAL Northwest Pipeline Grant Jensen Security Conference Grant Jensen Security Conference.
GALENA WASTEWATER TREATMENT UPGRADES Informational Presentation for the Sassafras River Association Presented by Ryan J. Rangel, PE April 23, 2015.
Improvement of the Capacity of Drinking Water Treatment Plant in East Quantara (Case Study) Dr. Eng. Ibrahim Khaled El-Sayed Chairman 1North & South Sinai.
Tigard_WSP_0410. Existing System Miles of Pipe 2.Twenty One Pressure Reducing Valves (PRV) 3.Seven Pump Stations 4.Two Aquifer Storage and Recovery.
Molalla Water Treatment Plant Field Trip 4/24/07 Molalla Water Treatment Plant Field Trip 4/24/07.
POWER GENERATION TECHNOLOGIES
EXISTING OVERALL PLAN | UICN Plant 3 and Willow Creek Golf Course Figure 1 – Existing Overall Plan Legend Lien Holder (498,584 SF or 12 Acres) UICN (7,000,103.
Bulk flow—Pressure difference Plant Physiology UNI 2009.
ATTACHMENT C Photographic Report. Photo 1 - Influent Pipe to Wastewater Treatment Plant Photo 3 - Influent Flume for Flow Metering Photo 2 - Chart Recorder.
Michigan’s Hydrogen Rules Department of Environmental Quality.
Future Water Supply - for the Ashley Valley D. Gerard Yates Central Utah Water Conservancy District.
Processing, distribution and use of water.
VisiMix Pipe Line VisiMix Ltd, PO Box 45170, Jerusalem, 91450, Israel Tel: Fax:
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
Brian Smith February 2013 Erosion and Sediment Control, Landscape Design Criteria 1.
ENCE 667 Project Performance Measurement Patuxent Water Treatment Plant Upgrade schedule analysis Presented by: Luis Rubio Isobo Tariah.
Water Treatment Plant By Erica Lopez Tiffany Thomas Clay Montgomery Tyler Sims GRA Celina Bochis EMAP 2006.
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
24 CFR Funds may be used for activities which include, but are not limited to:
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
Proposed Dwayne Lane Dealership Reference Slides.
METRO WASTEWATER RECLAMATION DISTRICT CAPITAL IMPROVEMENTS PROGRAM
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
Sunrise JTA Project Jobs and Transportation Act. Project Vicinity I-205 Downtown Portland Oregon City.
NORWOOD PCBS SITE Daniel Keefe, Region 1 Remedial Project Manager.
OPTION 9 CO 2 PLANT PROCESSING Description: Operate the existing Castle Valley CO 2 plant to process the Price area coal-seam gas. Plant can processes.
Hydraulics is defined as the study of fluid behavior, at rest and in motion Properly designed piping with sound hydraulics can: - Greatly reduce maintenance.
Construction OF AMMONIA REMOVAL UPGRADES FOR FIRST BROAD RIVER WWTP
Considerations and operational challenges in choosing Membrane Filtration for a Water Treatment Plant Upgrade Ed Cross Division Manager, Water Supply and.
Flow Equalization 1.  To overcome operational problems caused by flowrate variations  To improve the performance of the downstream processes  To reduce.
Surface Water Plants Hueco Wells Mesilla Wells. Drilling Fresh Water Wells; Both Bolsons.
Reclaimed Water Solution for Disposal Capacity Village of Bald Head Island 2015 NC AWWA - WEA Annual Conference November 17, 2015.
 Project Capacity: 54 MGD  Water Purchase Agreement: 30-year take-if-delivered contract with San Diego County Water Authority for water purchase of.
Date: Monday, May 11 th 2015 Topic: Water Purification Objective: To recognize the stages of it.
Experts in Chem-Feed and Water Treatment Fluid Engineering, Inc. Southern Company Services Cooling Tower Chemical Feed Skids Plant Franklin Combined Cycle.
EXPANSION OF BRUNSWICK COUNTY’S NORTHWEST WATER TREATMENT PLANT Public Utilities.
Presented by: David S. Prinzhorn, P.E. Town Engineer/Public Works Director/Utilities Manager Town of Cave Creek.
University of Wyoming Environmental Engineering Senior Design Team Leah Birgen Brent Brouillard.
Santa Rita Wastewater Treatment Plant Alternative Site Investigation Addendum Sawmill Road Site.
Sustainable Coastal Development Preparing Your Coast.
Tuesday 9/22 Day 2 Science Starters Sheet 1. Please have these Items on your desk. Agenda 2- Fill out your Agenda. Science starter: Physical property:
1 | emwd.org MV 2060 Pressure Zone Potable Water Storage Tank and Transmission Pipeline Joe Mouawad April 6, 2016.
Reed Contracting Concrete Plant (ALG active) November 8, 2012 Madison County Karl M. Ryan, inspector 1.
1 Risks at Komati Water Scheme PED Operations. 2CONTENT  Executive Summary  Pump station layout schematic  KWS Maintenance risks  KWS Operational.
Water Filtration Plant Improvements Project Summary
Planning and Realisation of Wind Farms
Swakopmund desalination plant EIA: Numerical modelling results
How Water Flows Through the Plant
Containerized desalination based on RO:
Self-expanding foam system
A B Bait site: Jk5-coding end (CE)
TGP Outages Remainder of the Year (Sept. thru Dec.)
Groundwater Remediation Status
Flow Equalization Jae K. (Jim) Park Dept. of Civil and Environmental Engineering University of Wisconsin-Madison.
Transwestern Station 1 Heat Recovery Project
Tuesday, November 14, 2017 Board Meeting
Flaring Notification & Requirements
Chemical or Physical Change.
Pinole-Hercules Water Pollution Control Plant Upgrade Project
English for Technician
Southwest Section AWWA 2018 – Baton Rouge, LA
Beacon Hill Common Area Landscaping
Presentation transcript:

Project Location

Existing Conditions N Maintenance Building AEP Line CAPACITY RESTRICTIONS Maintenance Building AEP Line REVISED AEP Easement CAPACITY RESTRICTIONS Influent Metering Station Embankment 2-54” Influent Pipelines 1-72” Influent Pipeline N Pre-Sedimentation Basins Red denotes bottlenecked structures

Proposed Site Improvements 4- Valve Vault Structures Influent Metering Station (Expanded/ Relocated) New Rapid Mix/ Chemical Feed Structure(s) AEP Line 3-54” Influent Pipelines 1-72” Influent Pipeline Control Metering Station REVISED AEP Easement Maintenance Building Relocated to SE of Plant Property Junction Structure (Expanded/ Relocated) N Red denotes bottlenecked structures Existing Piping and Structure Demolition