SIT AND FTD DESIGN FOR ILD

Slides:



Advertisements
Similar presentations
5 th ILD Workshop Orsay, 23 rd -25 th May 2011 D. Moya, J. Duarte, I. Vila, A. Ruiz - IFCA (CSIC-UC) F. Arteche, C. Esteban - ITA Strip FTD Readiness for.
Advertisements

DCS meeting, CERN, 17 June 2002Børge Svane Nielsen, NBI1 Forward Detectors DCS Forward Detectors (FWD): T0- quartz Cherenkov V0 - plastic scintillator.
Forward Detector Meeting, 11 Mar 2003Børge Svane Nielsen, NBI1 Si-FMD status Forward Detector meeting, CERN, 11 March 2003 Børge Svane Nielsen Niels Bohr.
Technical Board, 12 July 2005Børge Svane Nielsen, NBI1 Status of the FMD Børge Svane Nielsen Niels Bohr Institute.
ATLAS SCT Endcap Detector Modules Lutz Feld University of Freiburg for the ATLAS SCT Collaboration Vertex m.
Charged Particle Tracker for a RHIC/EIC joint detector Detector layouts based on EIC and NLC Physics drivers Silicon detector technologies Simulations.
Mechanical Status of ECAL Marc Anduze – 30/10/06.
The SVT in STAR The final device…. … and all its connections … and all its connections.
LHCC referees meeting, 10 October 2005Børge Svane Nielsen, NBI1 Status of the FMD LHCC referees meeting, 10 October 2005 Børge Svane Nielsen Niels Bohr.
1 Module and stave interconnect Rev. sept. 29/08.
Module Production for The ATLAS Silicon Tracker (SCT) The SCT requirements: Hermetic lightweight tracker. 4 space-points detection up to pseudo rapidity.
The LHCb Inner Tracker LHCb: is a single-arm forward spectrometer dedicated to B-physics acceptance: (250)mrad: The Outer Tracker: covers the large.
L. Greiner1PXL Sensor and RDO review – 06/23/2010 STAR Heavy Flavor Tracker Overview With parameters pertinent to the PXL Sensor and RDO design.
STATUS OF THE CRESCENT FLEX- TAPES FOR THE ATLAS PIXEL DISKS G. Sidiropoulos 1.
Drift Chambers Drift Chambers are MWPCs where the time it takes for the ions to reach the sense wire is recorded. This time info gives position info:
SVX4 chip 4 SVX4 chips hybrid 4 chips hybridSilicon sensors Front side Back side Hybrid data with calibration charge injection for some channels IEEE Nuclear.
D. Lissauer, BNL. 1 ATLAS ID Upgrade Scope R&D Plans for ATLAS Tracker First thoughts on Schedule and Cost.
26 April 2013 Immanuel Gfall (HEPHY Vienna) Belle II SVD Overview.
Marc Anduze – 09/09/2008 Report on EUDET Mechanics - Global Design and composite structures: Marc Anduze - Integration Slab and thermal measurements: Aboud.
Mechanical Status of EUDET Module Marc Anduze – 05/04/07.
2 Silicon pixel part Done and to be written Written! Under way To be done Introduction 1.Hybrid Pixel Assembly Concept 2.Silicon sensor 1.First thinned.
Thin Silicon R&D for LC applications D. Bortoletto Purdue University Status report Hybrid Pixel Detectors for LC.
PHENIX Silicon Vertex Tracker. Mechanical Requirements Stability requirement, short and long25 µm Low radiation length
EUDET JRA3 ECAL in 2007 : towards “The EUDET module” C. de La Taille IN2P3/LAL Orsay.
- Performance Studies & Production of the LHCb Silicon Tracker Stefan Koestner (University Zurich) on behalf of the Silicon Tracker Collaboration IT -
Proposal for the assembly of the PHOBOS ring counters (H.P. 3/20/98) I would like to propose and discuss with you an alternative layout and assembly procedure.
Vessel dimensions GTK assembly carrier Electrical connections Cooling pipes integration Vessel alignment with the beam Next steps Conclusion 3/10/20102.
1 ILD meeting LAL M. Joré – Integration status Matthieu Joré – 25 th of May ILD integration status and open issues.
D. M. Lee, LANL 1 07/10/07 Forward Vertex Detector Overview Technical Design Overview Design status.
TC Straw man for ATLAS ID for SLHC This layout is a result of the discussions in the GENOA ID upgrade workshop. Aim is to evolve this to include list of.
ILD Vertex Detector Y. Sugimoto 2012/5/24 ILD
Marc Anduze – CALICE Meeting – KOBE 10/05/07 Mechanical R&D for Technological EUDET ECAL Prototype.
The CMS Silicon Strip Tracker Carlo Civinini INFN-Firenze On behalf of the CMS Tracker Collaboration Sixth International "Hiroshima" Symposium on the Development.
Upgrade PO M. Tyndel, MIWG Review plans p1 Nov 1 st, CERN Module integration Review – Decision process  Information will be gathered for each concept.
Vessel dimensions GTK assembly carrier Electrical connections Cooling pipes integration Vessel alignment with the beam Next steps Conclusion 3/23/20102electro-mechanical.
8/12/2010Dominik Dannheim, Lucie Linssen1 Conceptual layout drawings of the CLIC vertex detector and First engineering studies of a pixel access/insertion.
RD program on hybrids & Interconnects Background & motivation At sLHC the luminosity will increase by a factor 10 The physics requirement on the tracker.
Paul Rubinov on behalf of Gene Fisk, Kurt Krempetz 22 Aug 2012.
10 September 2010 Immanuel Gfall (HEPHY Vienna) Belle II SVD Upgrade, Mechanics and Cooling OEPG/FAKT Meeting 2010.
1 ILD inner region integration meeting M. Joré – Introduction ILD inner region integration meeting Welcome words Charge of the meeting The current concept.
T-THERMO-MECHANICAL MODEL FOR THE LC FORWARD TRACKER Ciemat, October 27 th, FPA2013ILC workshop D. Moya, I. Vila, Instituto de Física de Cantabria (CSIC-UC.
Tapes and Integration of Powering (endcap) Pepe Bernabeu (IFIC) Valencia/UK - Experience and future collaboration on staves/petals, June 17 th 2010.
24 September 2012 Immanuel Gfall (HEPHY Vienna) Annekathrin Frankenberger (HEPHY Vienna) SVD Status of Mechanics PXD-SVD Meeting Göttingen.
Depfet Evo meeting. D. Moya IFCA (CSIC-UC) FOS based displacement sensors for PXD-SVD movements measurements.
Atlas SemiConductor Tracker final integration and commissioning Andrée Robichaud-Véronneau Université de Genève on behalf of the Atlas SCT collaboration.
Marc Anduze – EUDET Meeting – PARIS 08/10/07 Mechanical R&D for EUDET module.
Thermal Analysis of Outer Tracker Modules and Rod Susanne Kyre UCSB 2/8/20101Susanne Kyre UCSB.
EC: 7 DISK concept Preliminary considerations
Straw man layout for ATLAS ID for SLHC
De Remigis The test has been accomplished with an SLVS signal, since that was chosen for the serial communication between the readout and the optical converter.
EUDET HCAL prototype; mechanics Felix Sefkow Work by K.Gadow, K.Kschioneck CALIC collaboration meeting Daegu, Korea, February 20, 2009.
SVD Electronics Constraints
Developing Radiation Hard Silicon for the Vertex Locator
- STT LAYOUT - SECTOR F SECTOR A SECTOR B SECTOR E SECTOR D SECTOR C
? ENDCAP: Mechanics IFIC-Valencia.
Assembly procedure – Inner Region
Simulated vertex precision
Mini-drawers, FE-ASIC , Integrator
C.Clerc ILD session, ALCPG /03/2010
Vertex Detector Mechanical R&D Design Questions and Issues
Phase 2 Outer Tracker Module analysis
First of all we will remind some numbers:
SuperB SVT Definition of sensor design and z-side connection scheme
WG4 – Progress report R. Santoro and A. Tauro.
Design and fabrication of Endcap prototype sensors (petalet)
Final Design CGEM Workshop HIEP, 14/03/2017 M. Melchiorri - INFN FE.
The LHCb vertex detector
Setup for testing LHCb Inner Tracker Modules
R&D of CMOS pixel Shandong University
Presentation transcript:

SIT AND FTD DESIGN FOR ILD Rod and Petals modules modeling 30 JUNE 2010 David Moya IFCA

SIT DESIGN GUIDELINES 1 Rod contains 4 sensors in the case of the inner layer and 7 in the case of the outer layer Module design is compatible with 6” wafers The following numbers are for 2.5 cm strips length The Sit has 6 rods at inner layer and 12 rods at the outer layer 30 JUNE 2010 David Moya IFCA

SIT module design Design for 2.5 cm strip length Sensor glued on 2 TPG strips TPG strips on both side of sensors Hybrid with chip’s glued on sensor, strip side, above the TPG strip DC-DC converter glued on the TPG strip of the sensor. One DC-DC converter powers 2 hybrids r/o chip: 128 channels , 50 um pitch Two options Same pitch for the sensor an the r/o chip Alternatively, integrate the pitch adapter in the sensor (double metal layer) 30 JUNE 2010 David Moya IFCA

Dimensions Rod envelope 143 x 20 x 645 / 371 mm Sensor 200 micron, 84.5 x 100.3 mm (50 um strip) TPG strip 0.3 mm thick, 14 x 116 mm Hybrid envelope 30 x 107 x 0.3 mm Connector 9 x 5 x 4 mm DC-DC converter 35 x 20 mm Coil on DC-DC converter 12 x 12 x 9 mm Optohybrid 84,5 x 70 mm Optoconverter 50 x 14 x 9 mm 30 JUNE 2010 David Moya IFCA

Cabling 1 HV cable per sensor 2 twisted pairs for readout per 2 Chips' = 52 tp per module = 208 tp per inner rod /364 tp per outer rod 1 supply cable per DC-DC converter (12 V) 1 output (1-2 V) connector per DC-DC converter containing 2 cables for 2 hybrids 30 JUNE 2010 David Moya IFCA

SIT FRONT END ELECTRONIC 30 JUNE 2010 David Moya IFCA

SIT OPTOHYBRID 30 JUNE 2010 David Moya IFCA

MODULE LAYOUT 30 JUNE 2010 David Moya IFCA

SIT EXTERNAL LAYER 30 JUNE 2010 David Moya IFCA

SIT INTERNAL LAYER 30 JUNE 2010 David Moya IFCA

FTD MECHANICAL STRUCTURE First Step: Define the Front End electronic of the module This will allow us to make a more realistic mechanical design of the module: Once the Front end is defined: Will start defining the cable rooting, cooling and Simulations 30 JUNE 2010 David Moya IFCA

FTD Module Design 4 sensors per petal. 2 sensors per side in Stereo (6º / -6º) Sensors in a 6” wafer Front end electronic design same as SIT but without bottom support 30/JUNE/2010 David Moya IFCA 12

FTD MODULE DESIGN Sensor glued on petal directly Hybrid with chip’s glued on sensor, strip side, above the TPG strip DC-DC converter glued on the TPG strip of the sensor. One DC-DC converter powers 2 hybrids 30 JUNE 2010 David Moya IFCA 13

Dimensions Sensor size different depending of the FTD disk and the position in the petal. TPG strip 0,3mm Hybrid envelope 30 x 0.3 mm (131,365mm maximum length) Connector 9 x 5 x 4 mm DC-DC converter 35 x 20 mm Coil on DC-DC converter 12 x 12 x 9 mm Optohybrid geometry to be defined Optoconverter 50 x 14 x 9 mm 30 JUNE 2010 David Moya IFCA 14

FTD Cabling 1 HV cable per sensor 2 twisted pairs for readout per 2 Chips' 1 supply cable per DC-DC converter (12 V) 1 output (1-2 V) connector per DC-DC converter containing 2 cables for 2 hybrids 30 JUNE 2010 David Moya IFCA 15

FTD ROUTING Will be defined by the chosen front end electronic of the module. Routing: The SIT, Vertex and FTD cables will go between the Beam Pipe and the FTD Disks after the 2nd FTD. Before it would be better the cables to go between the disk an the support structure. It must be know the total quantity of cable of all the subdetectors to make a good routing and a good mechanicals design of the routing. 30 JUNE 2010 David Moya IFCA

FTD PETAL DESIGN 30 JUNE 2010 David Moya IFCA

FTD MODULE LAYOUT 30 JUNE 2010 David Moya IFCA

4th FTD DISK 30 JUNE 2010 David Moya IFCA

SUPPORT STRUCTURE Petals will be assembled to a ring shape support structure In the actual design the petals would be glued in a toothed ring. It would be better an assembly by aluminium inserts. 30 JUNE 2010 David Moya IFCA

SUPPORT STRUCTURE 30 JUNE 2010 David Moya IFCA

Mechanical Design Checking It must be done a mechanical simulation of all the structure: In order to obtain stress, strain an displacements of the structure and the natural frequency's. For this wee need information about typical materials used in the Particles physics Compare with the high module MTM45/IM7 ( it will be tested in radiation environment to obtain the change in the mechanical parameters Perhaps a change of the design will be needed. 30 JUNE 2010 David Moya IFCA

FTD Cooling We would need to do some thermal simulations We would need for a realistic simulation Thermal properties of the material Convection coefficients Chip produced heat 30 JUNE 2010 David Moya IFCA

Bt SUPPORTED BY FTD Mechanical simulation needed: The last design of the Beam Tube and materials We think that it could be possible but before we must see the strain induced by the beam Tube in the FTD 30 JUNE 2010 David Moya IFCA

CONCLUSIONS SIT AND FTD FRON END ELECTRONIC DESIGN SIT LADDERS AND FTD DESIGN MECHANICAL AND THERMAL SIMULATIONS MUST BE DONE FOT BOTH INITIAL DESIGN: OPENED TO DISCUTION AND CHANGES.