P roblem S olving I nnovator Solving Tomorrows Problems Today IS - IS NOT / COMPARITIVE ANALYSIS motivates deliberate thinking about the Boundaries of.

Slides:



Advertisements
Similar presentations
Using Other Accounts in QuickBooks
Advertisements

1 09/10/02 WG12 Software Primer For RTVIS Committee September 10, 2002.
Overview of Withdrawal Designs
Filing a Warranty Claim On-Line Claim Filing. 1.Upon successful login, the screen to the right appears. 2.To start a new warranty claim or check the status.
P roblem S olving I nnovator Solving Tomorrows Problems Today The 1 st Why can be formed once the Team has Brainstormed for Potential Causes The 1 st.
P roblem S olving I nnovator Solving Tomorrows Problems Today Electronic Brainstorm Database Electronic Brainstorm Database Brainstorming stimulates new.
6-1 CHAPTER 5 Time Value of Money The most powerful force in the universe is compound interest-Albert Einstein Future value Concept/Math/Using calculator.
© International Road Transport Union (IRU) 2007 Page 1 Incidents, Accidents & the Use of the Certified Report Procès Verbal de Constat A step by step guide.
P roblem S olving I nnovator Solving Tomorrows Problems Today 4 th Why / Root Cause Cause & Effect (Fishbone) 4 th Why / Root Cause Cause & Effect (Fishbone)
P roblem S olving I nnovator Solving Tomorrows Problems Today Primary function is to identify and organize possible causes of a specific effect and then.
P roblem S olving I nnovator Solving Tomorrows Problems Today To prevent any potential defects reaching the customer, define and implement containment.
General Ledger Fiscal Year End Closing out WELCOME! To the Year End Workshop. During this workshop and presentation, references will be made to.
P roblem S olving I nnovator Team problem solving in a production Environment.
P roblem S olving I nnovator Solving Tomorrows Problems Today Overview of how the 5 why automatically generates an FMEA & Control Plans 5 Why - FMEA Relationship.
Spill Prevention Control & Countermeasures Compliance and Planning.
P roblem S olving I nnovator Solving Tomorrows Problems Today User Help The help feature is found through out the PSI.This enables the user to gain a.
P roblem S olving I nnovator Solving Tomorrows Problems Today 3 rd Why / Failure Effect Development 3 rd Why / Failure Effect Development 3 rd Why / Failure.
once the Team has Completed the 4th Why
P roblem S olving I nnovator Solving Tomorrows Problems Today Warnings Clear All prepares the PSI for the next problem. Clearing of D1-D3.
BINDER UPDATE FEBRUARY 13, UP TO TODAY, CHECK THAT… 1.You have glued or taped the cover sheet to the front of the first divider and filled it in.
EPA Pesticide Container and Repackaging Regulations, Flow Chart 2: Can I fill this large portable refillable container (greater than 119 gallons)? (end.
P roblem S olving I nnovator Solving Tomorrows Problems Today Potential Failure Mode DBS & Chart Root Cause DBS Reviewing/Updating the Databases and Analysing.
Step – by – step Tutorial.  Enter Username  Enter Password  Select OK.
Global Business Management Group
BIG IDEA: Rocks and minerals have properties that can be: observed, tested, described, identified and recorded.
P roblem S olving I nnovator Solving Tomorrows Problems Today Identify the need and reason for the PSI. Clearly document the Opportunity Description Identify.
P roblem S olving I nnovator Solving Tomorrows Problems Today 2 nd Why/Voting Techniques Automatic Ranking 2 nd Why/Voting Techniques Automatic Ranking.
P roblem S olving I nnovator Solving Tomorrows Problems Today 1 st Why / Function Pareto Chart 1 st Why / Function Pareto Chart Overview of Percentage.
P roblem S olving I nnovator Solving Tomorrows Problems Today 2 nd Why / Requirements Cause & Effect (Fishbone) 2 nd Why / Requirements Cause & Effect.
The Forecast Process. Objectives Develop a best practice scheme for the use of data in producing a forecast Produce a ‘flow chart’ illustrating this for.
P roblem S olving I nnovator Solving Tomorrows Problems Today Potential Benefit Description Force Field Analysis will identify the viability of Recommended.
P roblem S olving I nnovator Solving Tomorrows Problems Today The Team should Accept the PSI Innovation and develop the Team Structure & Logistics The.
Does Anyone Remember Lawn Darts?. Yet Another Picture of Lawn Darts.
Your Catapult Team Do the following:
Environmentally Conscious Design & Manufacturing (ME592) Date: April 19, 2000 Slide:1 Environmentally Conscious Design & Manufacturing Class 19: Reuse.
The Quality Improvement Model
Total Quality Management BUS 3 – 142 Tools of Quality Week of Mar 7, 2011.
P roblem S olving I nnovator Solving Tomorrows Problems Today Once the Problem Profile is determined, the Process Control can be implemented correctly.
P roblem S olving I nnovator Solving Tomorrows Problems Today Problem / Improvement Confirmation Problem / Improvement Confirmation Management should.
8D Report provides a summary of the PSI
P roblem S olving I nnovator Solving Tomorrows Problems Today The Fault Tree will automatically be generated once the Team has Completed the 5 th Why.
Progress report of e-Lab sub-group (WLTP-10-12e) 1. Proposals for Adoption 2. Proposals for Discussions 3. Next Actions.
P roblem S olving I nnovator Solving Tomorrows Problems Today Databases for Improvements Prevention/ Lessons Learned Prevention/ Lessons Learned Potential.
Problem Solving Methodology
P roblem S olving I nnovator Solving Tomorrows Problems Today Before beginning, establish the parameters of the opportunity. Do this by completing the.
QN = BQ403E One-Page B/W Quad Processor USER MANUAL.
QCR = CQ406E One-Page Color Quad Processor USER MANUAL.
P roblem S olving I nnovator Solving Tomorrows Problems Today Current Situation Prevention / Detection Current Situation Prevention / Detection Analyzing.
Technical Support and RMA Tutorial Customer Interaction Center - CIC.
Presented by Steven P. Feltman Food Safety and Quality Specialist.
Chapter 3 Eclipses and the Motion of the Moon The phases of the Moon were introduced in Section 1, but without discussion of eclipses of the Sun and Moon.
PHY 202 (Blum)1 Analog-to-Digital Converter and Multi-vibrators.
Malte HildebrandtDC Status Report, Dear MEG Committee,PSI, April 14 th 2009 this is the first report concerning the drift chamber status as.
900-LC P. van Poppel – Field Support Specialist October 2009.
PHY 202 (Blum)1 Analog-to-Digital Converter and Multi-vibrators.
Hydro Electric Generator FEA Analysis Ryan MacTarnaghan Mechanical Engineer Department of Water Resources.
P roblem S olving I nnovator Solving Tomorrows Problems Today Analysis to minimize all future negative unforeseen effects of stated PSI subject Risk Analysis.
1 Prof. Indrajit Mukherjee, School of Management, IIT Bombay Bill Smith’s findings…. Bill Smith’s paper concluded that if product was found defective and.
P roblem S olving I nnovator Solving Tomorrows Problems Today Saving with a Backup insures that the work that has been done in the PSI can be recovered.
P roblem S olving I nnovator Solving Tomorrows Problems Today Actions taken refers to the actual action taken as described in the FMEA Prevention & Detection.
CHAPTER 6 Confirm Phase. Introduction What is Confirmation? Confirmation is the investigation of the theory, in operation, to determine its accuracy.
FLOW CHARTS IN PROCESS DESCRIPTION FRANK CHINGARANDE.
HARDWARE DEFECTIVE PARTS PROCESS
Welcome to the 13 th Annual TSA Conference, 2016.
Parking brake selector valve
Short introduction to aeroelasticity
Failure mode and effect analysis
The dates of your CPD cycle.
Ken Periman Problem solving, Brake Booster Fluid leak
Record your QUESTIONS as your read.
Presentation transcript:

P roblem S olving I nnovator Solving Tomorrows Problems Today IS - IS NOT / COMPARITIVE ANALYSIS motivates deliberate thinking about the Boundaries of What Is or Is Not. WHAT Object / Deviation WHERE Seen on Product / Process WHERE Seen on Product / Process WHEN First seen / Last Reported WHEN First seen / Last Reported HOW BIG How many objects / Defects HOW BIG How many objects / Defects

COVER PAGE

D2 – Fill in the data for the WHAT section accordingly WHAT section Help What object has the Defect? Auto Input from Problem Workbook Help What similar object(s) could have the Defect Help CONSIDER Part Numbers Shop Floor Descriptions Customer Descriptions Help What is the Defect? Auto Input from Problem Workbook Help What other Defects could have been observed? Help What has changed In / and / around this difference? Help Date change was reversed. If still same ? Enter current Help How could these Differences or Changes have Created or Caused the Problem – as it is defined? Other Similar Valves Major Leak Data to confirm Problem has not previously occurred on similar Parts Help What could CAUSE the Difference between the IS Compared to the IS NOT? Different Operating Conditions Higher Operating Pressure Seal introduced to cope with increased pressure Help CONSIDER How could the changes Have CAUSED the differences Used only by TooGood Motor Corporation Current

D2 – Fill in the data for the WHERE section accordingly WHERE section Help Where specifically on the object does the Defect occur? Help Where in the Process Flow is the Defect seen Help Where specifically on the object does the Defect occur? Help Where could the Defect have been observed? Help CONSIDER Environmental factors Contamination Possible Abuse Help What could CAUSE the Difference between the IS compared to the IS NOT? Help CONSIDER How could the changes have CAUSED the differences Help What has changed In / and / around this difference? Help How could these Differences or Changes have Created or Caused the Problem – as it is defined? At other Joints On the Pressure Test Validate Leakage in Field Vibration of Valve Loss of Torque on Union Used in Potentially harsh Operating Conditions Vibration could weaken Torque on Union Around Sealing Washer When Vehicle is in the Field

D2 – Fill in the data for the WHEN section accordingly WHEN section Help What has changed In / and / around this difference? 09-Feb April-12 After three months of use Before 27-Mar-12 During Product/Vehicle Testing Validate Service History Product Cycle Time Loss of Torque Seal Surface deteriorates Valve was subject to Operating Conditions and Seal possibly settled in Vibration could weaken Torque on Union Help When in time was the Defect first observed? Help When was it Seen But NOT Reported Help When in time could the Defect have been observed? Help Where should the Defect have been seen, but wasnt. Help CONSIDER Mode of Operation Modifications/ Changes Reliability Data Help What could CAUSE the Difference between the IS compared to the IS NOT? Help CONSIDER How could the changes have CAUSED the differences Help How could these Differences or Changes have Created or Caused the Problem – as it is defined? Help When since that time has it been seen? Help Consider changes in the Process Cycle.

HOW BIG section D2 – Fill in the data for the HOW BIG section accordingly Help What has changed In / and / around this difference? Help How many units, items, objects, have the defect? Use % or how many out of? Help Is the Problem getting Bigger/ Stable / Smaller? Help How often could the Defect occur Help Could the Problem be worse or better without intervention? Help CONSIDER Warranty Returns Quality Records CP / Cpk Help What could CAUSE the Difference between the IS compared to the IS NOT? Help How could these Differences or Changes have Created or Caused the Problem – as it is defined? Help How many Defects per Object, Part or Unit? Help CONSIDER How could the changes have CAUSED the differences One 8 from 40,000 units Erratic On 39,992 units Multiple Leaks Predictable Investigate unreported instances from routine Servicing Interpretation of extent of Leakage Operational Use Different Service Outlets Different Service Outlets Help How many objects could have had the Defect?

P roblem S olving I nnovator Solving Tomorrows Problems Today This completes the D2 Comparative Analysis Now start the Flow Chart