FPL 2012 FPL Vendor Conference Mona Annaddaf Scotland, 7-8/12/2011

Slides:



Advertisements
Similar presentations
Federal Aviation Administration GOLD Introduction By:Tom Kraft Date:8 February 2012 Presented to:SOCM/2 Seminar GOLD.
Advertisements

AMHS/SWIM Seminar Chiang Mai, Thailand 5-6 March 2012
FPL2012 Message Conversion and Migration
Erwin Lassooij PBN Programme Manager 30 January 2014
Federal Aviation Administration Presented By: Dennis Addison, FAA Date: February 8, 2012 SOCM-2 Seminar Data Link Operations.
International Civil Aviation Organization European and North Atlantic Office Outcome of the ICAO EUR FPL2012 Workshop Kiev, Ukraine 29 June – 1 July 2010.
APAC PBN Seminar F.LECAT (ICAO)
Presented to: By: Date: Federal Aviation Administration Transition to RNP 4/10 (MNPS to PBN) OSWG Gordy Rother and Kevin Kelley 10/8/2014 North Atlantic.
ICAO Aviation Data Analyses Seminar Middle East (MID) Regional Office October Economic Analysis and Policy (EAP) Section Air Transport Bureau (ATB)
Objective COM10 ESSIP Plan 2014 Adriatik KOKONA DSS/EIPR
Objective FCM03 ESSIP Plan 2014 Octavian CIOARA DPS/PEPR
International Civil Aviation Organization European and North Atlantic Office CLARIFICATIONS FROM ICAO - ICAO EUR FPL2012 Workshop Kiev, Ukraine 29 June.
GMWG - 2. March 2005 Brian Parish AML Specifications Manager UKHO Brian Parish AML Specifications Manager UKHO.
AMHS (ATS Message Handling System)
© FREQUENTIS 2010 Datum: Rev.1 Autor: ODOSeite: 1 FPL 2012 Kym Shenton Senior Technical Engineer/Safety Engineer Frequentis California, Inc.
International Civil Aviation Organization SAM Regional Seminar/Workshop Tom Brady ICAO Air Navigation Bureau May Flight Plan Implementation and.
AIS/MAP Seminar Kiev May 2003 EUR/NAT Regional Officer AIS/MET Björn Hellroth EUR/NAT Regional Officer AIS/MET Björn Hellroth.
Federal Aviation Administration Federal Aviation Administration 1 Presentation to: Name: Date: Federal Aviation Administration AMHS Security Security Sub-Group.
ICAO Flight Plan 2012 Workshop ARE YOU READY? Durban 24 August 2012.
1 IDNs go live under.eu Conference for ccTLD registries and registrars of CIS Bled, Slovenia – 7 September 2009 Joke Braeken, Deputy Manager External Relations.
ICAO Changes to the Present Flight Plan Form Amendment 1 to the PANS-ATM Fifteenth Edition (PANS-ATM, Doc 4444) Tom Brady ICAO HQ.
Standard Contract Forum 26 March am Customer Suite, BT Centre, London.
FPL2012 TF#7Brussels 10 October 2012 Kim Breivik Operational Requirements Network Management EUROCONTROL Deployment.
Vendors Conference Prestwick 2011 Customer Picture Implementation of Changes to ICAO FPL 2012 Christoph Kunze Lufthansa Systems 7th December 2011.
International Civil Aviation Organization Airspace Allocation and Use Mitchell A. Fox Chief Flight Operations Section, ANB 10 April 2012 IAOPA World Assembly.
IPC Working Group 31 - Updates on IT support for the IPC Geneva May 16, 2014 Patrick Fiévet Head of IT Systems Section.
6-1. 항공안전평가프로그램 항공안전본부 항공기술과 항공사무관 이광희 6-1. 항공안전평가프로그램 항공안전본부 항공기술과 항공사무관 이광희
VHF Redundant System Request for Proposal Pre-Proposal Conference April 7, 2011 Steve Webb, IDOA Strategic Sourcing Analyst.
Submission doc.: IEEE /0015r0 January 2016 Sho Furuichi, SonySlide 1 Proposal for CM discovery/selection/ association as CE operation Date:
Service Enhancement AMHS Implementation Workshop Chennai, India 15 th – 17 th December 2008.
Transition to RNP 4/10 (MNPS to PBN)
APAC PBN Seminar F.LECAT (ICAO)
FPL 2012 Kym Shenton Senior Technical Engineer/Safety Engineer
AMHS (ATS Message Handling System)
SYMPOSIUM OUTCOMES AND THE WAY FORWARD
African Flight Procedure Programme Assistance (AFPP)
CLARIFICATIONS FROM ICAO - ICAO EUR FPL2012 Workshop
Erwin Lassooij PBN Programme Manager 30 January 2014
Social Dialogue Plenary Meeting
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
GOLD GOLD Introduction Presented to: SOCM/2 Seminar
NHS England eDEC 2017/18: summary of proposed changes
Workshop on preparations for ANConf/12 − ASBU methodology
Performance based communication and surveillance
AMHS/SWIM Seminar Chiang Mai, Thailand 5-6 March 2012
Performance-Based Communication and Surveillance (PBCS)
FAA Implementation of Amendment 1
VIEWS II: Motivation and Plans for a Revised Validation Service
the International Civil Aviation Organization
GOLD GOLD Amendment Program Presented to: SOCM/2 Seminar
Transmission Workgroup 4th October 2012
UK Link Technology Refresh
Objective COM10 ESSIP Plan 2015 Adriatik KOKONA DPS/PEPR
AIS/MAP Seminar Kiev May 2003
ICAO 2012 Network Operations Update
2012- ICAO FPL Changes the airline viewpoint Arkady Merkulov IATA
Informal document GRPE-74-20
Economic Analysis and Policy (EAP) Section Air Transport Bureau (ATB)
Objective NAV03 ESSIP Plan 2015 Adriatik KOKONA DPS/PEPR
Training & Documentation
ICAO 2012 FPL Anthony Coult 8 Dec 2011.
AIM Global Strategy Air Navigation Procedures for AIM Seminar
IPC Working Group 31 - Updates on IT support for the IPC
Strategic Planning Timeline Overview
CPD Summary Guide 2018 Version:3.1.
SAM Regional Seminar/Workshop
USOAP Continuous Monitoring Approach (CMA) Workshop
Briefing to ICAO TCB Seminar
Presentation transcript:

FPL 2012 FPL Vendor Conference Mona Annaddaf Scotland, 7-8/12/2011 Presented by: Mona Annaddaf 7/12/2011

Presentation Outline Background Issues regarding use of FPL data Regional Variation State Variation 7/12/2011

Background Sudan 7/12/2011 Ready for FPL Signed contract with a vendor Evaluation of current systems No Progress 3 7/12/2011

Issues regarding use of FPL data The MID states will adopt the FPL guidance material developed by APAC Region. 2. The MID transition period from 1 January 2012 until 14 November 2012, comprising; - Before 31 March 2012 - ANSPs software delivery and internal testing. - 1 April to 30 June 2012 – ANSPs external testing and - 1 July to 14 November 2012 – airspace users testing. 7/12/2011

Issues regarding use of FPL data When a converter can be a viable alternative 7/12/2011

Issues regarding use of FPL data For a state does not wish to upgrade legacy system that approaching end of its lifetime. For end system is not capable of handling both formats in parallel during the transition period. When a state does not need an end system (ATM) supporting new capabilities in new FPL like (ADS, PBN, Data link,… etc) as those technologies are not yet implemented there, the national CNS/ATM plan for each state can determine its current and future need. To support Interoperability with other states that will not comply with the transition date. The cost should not be the criteria 7/12/2011

Issues regarding use of FPL data All Converter vendors offer a manual Intervention position: -> The operator should not append/ correct any data inside the text of FPL. (AFTN principle) -> The manual Intervention position should be used to request repetition or to contact the originator in any way. 7/12/2011

Issues regarding use of FPL data Handling erroneous or unrecognized FPL format: CFMU use “REJ” message to inform the originator about the rejected flight plan, same procedure could be used to request resubmitting an erroneous or unrecognized FPL message when no direct contact is possible with that message originator. 7/12/2011

Issues regarding use of FPL data AFTN Limitations 1- Line Length 69 characters AMHS Migration ( unlimited line length) At MTCU, any line more then 69 will be folded. 2- Max message size 2100 characters AMHS Migration (Unlimited message size) 7/12/2011

Regional Variation ICAO MID office has developed a Proposal For Amendment (PFA) of the SUPPs Doc 7030 to delete “STS/NONRNAV”. Our concern is how the European special requirements will affect our Region??? 7/12/2011

State Variation All MID states are requested to cater any variation in the new FPL and delete any special requirement and updated the regional PFF accordingly. 7/12/2011