Florida Keys Canal Remediation Diel Results

Slides:



Advertisements
Similar presentations
London Performance March London Performance Londons CPA scores have improved significantly since 2002 The performance of Londons councils compares.
Advertisements

WATER QUALITY MONITORING Demonstration of Remediation Methods Florida Keys Canals Henry O. Briceño Florida International University Southeast Environmental.
1 Hurunui River Dissolved Reactive Phosphorus Concentrations and Loads A tool to manage periphyton growth ? Review of Ecan & NIWA Dataset of DRP measurements.
Line Plots and Histograms Similar but Different. Line Plots Easy and visual way to organize data. Easy and visual way to organize data. consists of a.
DESIGNING MONITORING PROGRAMS TO EVALUATE BMP EFFECTIVENESS Funded by grants from USDA- CSREES, EPA 319, NSF Nancy Mesner - Utah State University, Dept.
. Topographic map of the Refuge marsh (figure provided by Dr. E.A. Meselhe based on USGS topography data). Elevations are in feet, NGVD29.Form USGS data;
Mitigation Defined Session Name: Mitigation Defined Coastal Hazards Management Course Hazard ….a possible source of danger Slide 16.1 The American Heritage.
Updating indicator implementation in Indistar Assessment Step Plan/Tasks Step Monitoring Step Flag to Re-assess.
Hurricanes are HUGE storms that occur in warm waters (like the Caribbean). They can cause great damage when they come onto land. But they don’t start.
Seasonal Patterns in the Relative Importance of Organic Acids and Sulfate in Episodic Acidification of Downeast Salmon Rivers By Mark Whiting, Maine DEP.
Interim Update: Preliminary Analyses of Excursions in the A.R.M. Loxahatchee National Wildlife Refuge August 18, 2009 Prepared by SFWMD and FDEP as part.
1 Observed Changes in Heavy Precipitation Events and Extratropical Cyclones David R. Easterling 1, Kenneth E. Kunkel 2, David Kristovitch 3, Scott Applequist.
Water Quality Monitoring and Constituent Load Estimation in the Kings River near Berryville, Arkansas 2009 Brian E. Haggard Arkansas Water Resources Center.
Water Quality Sampling, Analysis and Annual Load Determinations for Nutrients and Solids on the Ballard Creek, 2008 Arkansas Water Resources Center UA.
SITE STATUS UPDATE TOP STOP PETROLEUM RELEASE SITE GUNNISION, UTAH Morgan Atkinson – Division of Environmental Response and Remediation, Project Manager.
Sammamish River Diel Dissolved Oxygen and pH Study September 21, 2005.
Review of Current Conditions Report and Work Plan for Area 1 Presented by The Great Plains/Rocky Mountain Technical Outreach Services for Communities.
Rick Cruse, Matt Helmers, Greg Brenneman, and John Laflen Iowa Water Center, and Iowa State University Extension.
U.S. Department of the Interior U.S. Geological Survey Bee Lake Water Quality Monitor Data Summary Period of record: to 2/19/07.
How Extreme South West Rainfall Has Changed It is likely that climate change will be felt most through changes in extreme events.
Southwest Florida Water Management District Association of State Floodplain Managers Orlando, Florida June 9, 2009.
Jan, 2001CMS Tracker Electronics1 Hybrid stability studies Multi – chip hybrid stability problem when more then ~ 2 chips powered up -> common mode oscillation.
Changes to assessment and reporting of children’s attainment A guide for Parents and Carers Please use the SPACE bar to move this slideshow at your own.
Sunglasses Sales Excellence Discussion. Sunglasses Identify and describe at least one further feature of this time series data with reasons. – Sunglasses.
Status update presentation #1 for the Cayucos Sustainable Water Project Status update presentation #1 for the Cayucos Sustainable Water Project November.
An Examination of Dissolved Oxygen Levels and the Effects of Macroalgae in Chincoteague Bay, Maryland Renee Harrington, Southampton College, Honors Thesis,
Florida Keys National Marine Sanctuary Steering Committee Meeting WATER QUALITY MONITORING Demonstration of Remediation Methods Florida Keys Canals Summary.
Parent information evening 2016 Key Stage two SATs.
2016 Fire Season Considerations and Outlook SWCC Predictive Services Updated February 17, 2016.
Water Quality Sampling, Analysis and Annual Load Determinations for the Illinois River at Arkansas Highway 59 Bridge, 2008 Brian E. Haggard Arkansas Water.
Beth Kacvinsky - Lead Project Manager Office of Everglades Policy and Coordination March 1, 2016 IRL-S / C-44 Overview.
SA Economic Indicators Report updated:April 2016 Next update:May 2016.
VTS - Purpose VTS is being introduced to improve the safety of our staff by helping them to drive within the speed limit by providing a system that enables.
Data Book Review & Discussion Biometric & Spectral Analysis
The Effect of the 2016 Presidential Election on Humana Stock
Day 51 – Introduction to Statistics; Mean Median Mode
Subject Development in History
A Closer Look at CODAR HF Radar Spectra
HW 9 Key.
Guidelines for NSPRC Presentations
West Pacific Typhoon/Hurricane VongFong
GATEWAY DRAINAGE SYSTEM 2017 WET SEASON/IRMA OVERVIEW
Commemorative Events.
Understanding and Comparing Distributions
Understanding and Comparing Distributions
U.S. Lodging Industry Overview
Weight-Volume Relationships
Sample Presentation. Slide 1 Info Slide 2 Info.
Guidelines for NSPRC Presentations
Understanding and Comparing Distributions
The Wrap-up.
Southeast Environmental Research Center
Moab UMTRA Uranium Mill Tailings Remedial Action
Information for Parents on Key Stage 2 SATs
The role of weather conditions on PM2.5 concentrations in Beijing
DIGITAL COUNTDOWN WATCH - 5 MIN
12.1 Frequency Tables and Line Plots
Understanding and Comparing Distributions
Rainer Kurre, Berenike Maier  Biophysical Journal 
TAG Agenda – April 6th 2006 Minutes from last TAG meeting – 13.45
©G Dear 2008 – Not to be sold/Free to use
Ozone Monitoring Network
Section 12.2 Frequency Tables, Line Plots and Histograms
Information for Parents on Key Stage 2 SATs
Bell Work – Range, Measures of Center, and Dot Plot
Power On & Skin Install RockOn! 2008.
Tukey Box Plots Review.
Analyzing a Credit-Card Statement
Service Access Management Tool Notification Preferences
Jenny Watts Coastal Process Scientist, Plymouth Coastal Observatory
Presentation transcript:

Florida Keys Canal Remediation Diel Results As of 11/01/2016

Plots Two types of plots: % of measurements during a full day rendering %DO Saturation above 42% and Average of %DO Saturation for a full day of measurements Sampling frequency is 10 min

Relevant information on improvement (if any)

Storm events as that of 8/1 to 8/3/2016 impact DO concentrations Storm events as that of 8/1 to 8/3/2016 impact DO concentrations. These values were not plotted on following slide

Decoupling of Remediated (C29) from Control canal (C28) after backfilling C29 displays significant improvement in both, number of readings above 42%DO Saturation and daily average %DO Saturation Average %DO Sat has been at or above 42% since backfilling

Decoupling of Remediated (C137) from Control canal (C132) after remediation C137 displays significant improvement in both, number of readings above 42%DO Saturation and daily average %DO Saturation Some low DO values keep occurring after remediation tracking the control canal

No improvement yet. Remediation effective just since 3/11/16 Monitoring after remediation was performed in June and Sep 2016

No improvement yet. Although muck removal was completed in 01/16/16, full remediation was effective since 5/20/16 when a weed barrier was installed. Monitoring after remediation was performed in June and Sep 2016 with a shy improving trend appearing since installation of the barrier DO values are still very low.

Decoupling of Remediated (C277) from Control canal (C282) after backfilling C29 displays a significant improvement trend in both, number of readings above 42% DO Saturation and daily average %DO Saturation

No sustained improvement yet. Remediation effective just since 6/6/16 Monitoring after remediation was performed in June and Sep 2016. More time is necessary for recovery

Decoupling of Remediated (C472) from Control canals (C458, 460 and 470) after remediation (culvert installation) is clear, as is the significant degradation in water quality when the culvert was closed. C472 displays significant improvement in both, number of readings above 42%DO Saturation and daily average %DO Saturation Effective remediation stage began on 05/05/16 when the culvert was re-open. After a marked improvement some low DO values keep occurring after remediation tracking the control canals, but sustaining above control levels