Inventory Control Models.
1
Feichter_DPG-SYKL03_Bild-01. Feichter_DPG-SYKL03_Bild-02.
© 2008 Pearson Addison Wesley. All rights reserved Chapter Seven Costs.
Copyright © 2003 Pearson Education, Inc. Slide 1 Computer Systems Organization & Architecture Chapters 8-12 John D. Carpinelli.
Copyright © 2011, Elsevier Inc. All rights reserved. Chapter 6 Author: Julia Richards and R. Scott Hawley.
Author: Julia Richards and R. Scott Hawley
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
Properties Use, share, or modify this drill on mathematic properties. There is too much material for a single class, so you’ll have to select for your.
Multiplication X 1 1 x 1 = 1 2 x 1 = 2 3 x 1 = 3 4 x 1 = 4 5 x 1 = 5 6 x 1 = 6 7 x 1 = 7 8 x 1 = 8 9 x 1 = 9 10 x 1 = x 1 = x 1 = 12 X 2 1.
Division ÷ 1 1 ÷ 1 = 1 2 ÷ 1 = 2 3 ÷ 1 = 3 4 ÷ 1 = 4 5 ÷ 1 = 5 6 ÷ 1 = 6 7 ÷ 1 = 7 8 ÷ 1 = 8 9 ÷ 1 = 9 10 ÷ 1 = ÷ 1 = ÷ 1 = 12 ÷ 2 2 ÷ 2 =
UNITED NATIONS Shipment Details Report – January 2006.
BUS 220: ELEMENTARY STATISTICS
1 1  1 =.
1  1 =.
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
Year 6 mental test 10 second questions
Who Wants To Be A Millionaire?
1 The Impact of Buy-Down on Sell Up, Unconstraining, and Spiral-Down Edward Kambour, Senior Scientist E. Andrew Boyd, SVP and Senior Scientist Joseph Tama,
Auto-Moto Financial Services- The Old Process
Inventory BA 339 Mellie Pullman
Operations Management
Role of Inventory in the Supply Chain
Independent Demand Inventory 1. Inventory Firms ultimately want to sell consumers output in the hopes of generating a profit. Along the way to having.
Independent Demand Inventory Systems
Slides prepared by JOHN LOUCKS St. Edward’s University.
REVIEW: Arthropod ID. 1. Name the subphylum. 2. Name the subphylum. 3. Name the order.
Chapter 11. Order Point Inventory Control Methods
Managing Inventory throughout the Supply Chain
1 Managing Flow Variability: Safety Inventory The Newsvendor ProblemArdavan Asef-Vaziri, Oct 2011 The Magnitude of Shortages (Out of Stock)
Break Time Remaining 10:00.
The basics for simulations
PP Test Review Sections 6-1 to 6-6
Chapter 12 Capturing Surplus.
5-1 Chapter 5 Theory & Problems of Probability & Statistics Murray R. Spiegel Sampling Theory.
Cost-Volume-Profit Relationships
MCQ Chapter 07.
Capacity Planning For Products and Services
Re-Order Point Problems Set 1: General
Copyright © 2012, Elsevier Inc. All rights Reserved. 1 Chapter 7 Modeling Structure with Blocks.
Basel-ICU-Journal Challenge18/20/ Basel-ICU-Journal Challenge8/20/2014.
1..
© 2012 National Heart Foundation of Australia. Slide 2.
Elasticity of Demand and Supply
Before Between After.
Benjamin Banneker Charter Academy of Technology Making AYP Benjamin Banneker Charter Academy of Technology Making AYP.
Model and Relationships 6 M 1 M M M M M M M M M M M M M M M M
25 seconds left…...
Subtraction: Adding UP
Equal or Not. Equal or Not
Statistical Inferences Based on Two Samples
Analyzing Genes and Genomes
Operations Management Inventory Management Chapter 12
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
Essential Cell Biology
Converting a Fraction to %
Fundamentals of Cost Analysis for Decision Making
Intracellular Compartments and Transport
PSSA Preparation.
Operations Management
Essential Cell Biology
Energy Generation in Mitochondria and Chlorplasts
3 - 1 Copyright McGraw-Hill/Irwin, 2005 Markets Demand Defined Demand Graphed Changes in Demand Supply Defined Supply Graphed Changes in Supply Equilibrium.
Schutzvermerk nach DIN 34 beachten 05/04/15 Seite 1 Training EPAM and CANopen Basic Solution: Password * * Level 1 Level 2 * Level 3 Password2 IP-Adr.
MBPF1 Managing Business Process Flows: Supply Chain Management Module Managing the Supply Chain Economies of Scale (Chapter 6) Managing Flow Variability:
1 Inventory Analysis under Uncertainty: Lecture 6 Leadtime and reorder point Uncertainty and its impact Safety stock and service level Cycle inventory,
Managing Uncertainty in the Supply Chain: Safety Inventory
Chapter 12 Managing Uncertainty in the Supply Chain: Safety Inventory
Presentation transcript:

Managing Inventory under Risks Leadtime and reorder point Uncertainty and its impact Safety stock and service level The lot-size reorder point system Managing system inventory

Leadtime and Reorder Point Q Usage rate R Inventory level Average inventory = Q/2 Reorder point Time Receive order Place order Receive order Place order Receive order Leadtime

When to Order? ROP (reorder point): inventory level that triggers a new order ROP = LR (1) Example: R = 20 units/day Q*= 200 units L = leadtime with certainty μ = LR = leadtime demand L (days)  ROP 2 40 7 140 14 280 22 440

Motorola Hong Kong Revisited It takes the supplier 3 full working days to deliver the material to Motorola Consumption rate is 90 kg/day At what inventory level should Mr. Chan place an order?

Uncertainty and Its Impact Sandy is in charge of inventory control and ordering at Broadway Electronics. The average demand for their best-selling battery is on average 1,000 units per week with a standard deviation of 250 units With a one-week delivery leadtime from the supplier, Sandy needs to decide when to order, i.e., with how many boxes of batteries left on-hand, she should place an order for another batch of new stock What is the difference between Mr. Chan’s task at Motorola and this one?

Forecast and Leadtime Demand Often we forecast demands and make stocking decisions accordingly trying to satisfy arriving customers from on-hand stock Often, forecasting for a whole year is easier than for a week Leadtime demands usually can not be treated as deterministic

Inventory Decision Under Risk Inventory on hand When you place an order, you expect the remaining stock to cover all the leadtime demands Any order now or later can only satisfy demands after the leadtime L When to order? ROP1? order ROP1 ROP2 L L

ROP under Uncertainty When DL is uncertain, it often makes sense to order a little earlier, i.e., at an inventory level higher than the mean ROP =  + IS (2) IS = safety stock or extra inventory IS = zβ ×s (3) zβ = safety factor

Random Leadtime Demand Random Variable Mean std Demand Leadtime Leadtime demand (DL) R L  = LR

Safety Stock Leadtime Inventory on hand L Time t L order order order ROP mean demand during supply lead time safety stock Time t L Leadtime

Some Relations ROP safety stock safety stock safety factor safety factor service level Given demand distribution, there is a one-to-one relationship, so we also have ROP Is zβ β

Safety Stock and Service Level Service level is a measure of the degree of stockout protection provided by a given amount of safety inventory Cycle service level: the probability that all demands in the leadtime are satisfied immediately SL = Prob.( LT Demand ≤ ROP) =β

Service Level under Normal Demands Service Level: SL = ? (The area of the shaded part under the curve) Is= ROP – µ = 200 Mean: µ = 1,000 ROP = 1,200 SL = Pr (LD  ROP) = probability of meeting all demand (no stocking out in a cycle)

Compute Cycle Service Level Given Is and σ Use normal table, we find β from zβ Use excel: SL= NORMDIST(ROP, ,σ,True) (5) (4)

Example 7.3 (MBPF) zβ = or SL = NORMDIST(24,000,20,000, 5,000, True) ROP = 24,000, µ = 20,000, σ = 5,000 zβ = β = or SL = NORMDIST(24,000,20,000, 5,000, True) NT 9-EX1

Compute Safety Stock Given β, we obtain zβ from the normal table Use (3), we obtain the safety stock Use (2), we obtain ROP Given β, we can also have zβ = NORMSINV (β) (6) ROP = NORMINV(β, µ, σ ) (7)

Example 7.4 (MBPF) µ = 20,000, σ = 5,000 β = 85% 90% 95% 99% zβ = β = 85% 90% 95% 99% zβ = ROP = NT

Price of High Service Level NORMSINV ( 0.999)·200 NORMSINV ( 0.99)·200 Safety Stock NORMSINV ( 0.97)·200 NORMSINV ( 0.95)·200 NORMSINV ( 0.90)·200 NORMSINV ( 0.85)·200 0.5 0.6 0.7 0.8 0.9 1.0 Service Level Suppose I said I want 100% service level and it turns out it costs me $8.1b and the company only has $2m to invest. What should I do? Look at the curve. More towards perfection, more costly. Go to the computer example! 9-EX2

Example, Broadway Sandy orders a 2-week supply whenever the inventory level drops to 1,250 units. What is the service level provided with this ROP ? If Sandy wants to provide an 95% service level to the store, what should be the reorder point and safety stock ? Average weekly demand µ = 1,000 Demand SD  = 250 Reorder point ROP = 1,250

The Service Level Safety stock Is = Safety factor zβ = Service level By normal table β = By excel SL= NORMDIST (1250, 1000, 250, True) NT 9-EX1

Safety Stock for Target SL For 95% service rate By the normal table z0.95 = ROP = Is = By excel ROP =NORMINV (0.95, 1000, 250) NT 9-EX1

Lot Size-Reorder Point System Having determined the reorder point, we also need to determine the order quantity Note that we can forecast the annual demand more accurately and hence treat it as deterministic Then, the order quantity can be obtained using the standard EOQ

The Average Inventory Let the order quantity be Q The average inventory level = (Q+Is+ Is)/2 = Q/2 +Is The holding cost = HQ/2+HIs The ordering cost = S(R/Q) The optimal inventory cost = HQ* + HIs Inventory on hand Q +Is order ROP mean demand during supply lead time safety stock Time t Leadtime

Example, Broadway R=52000/year (52 weeks) H=$1/unit/year S=$200/order Lot-size Reorder point Order quantity Q* = For 95% service rate Is = 250zβ = Inventory cost = Sandy’s current policy µ= 1000, Q = 2000 ROP = 1,250, SL =84% Holding cost = Ordering cost Inventory cost 9-EX1

Managing System Inventory There are different stocking points with inventories and at each stocking point, there are inventories for different functions Total average inventory includes three parts: Cycle + Safety + Pipeline inventories Total Average Inventory = Q/2 + Is + RL (8)

Pipeline Inventory If you own the goods in transit from the supplier to you (FOB or pay when order), you have a pipeline inventory Average pipeline inventory equals the demand rate times the transit time or leadtime by Little’s Law Pipeline inventory = RL

Sandy’s Current System Inventory Q=2,000, L =1 week, R = 1,000/week ROP = 1250, Safety stock = Is = 250 Total system average inventory: not own pipeline I = 2000/2+250 = 1250 owns pipeline I = 2000/2+250+1000 = 2250

Managing Safety Stock Levers to reduce safety stock - Reduce demand variability - Reduce delivery leadtime - Reduce variability in delivery leadtime - Risk pooling

Demand Aggregation By probability theory Var(D1 + …+ Dn) = Var(D1) + …+ Var(Dn) = nσ2 As a result, the standard deviation of the aggregated demand is (9)

The Square Root Rule Again We call (9) the square root rule: For BMW Guangdong Monthly demand at each outlet is normal with mean 25 and standard deviation 5 Replenishment leadtime is 2 months. The service level used at each outlet is 0.90 The SD of the leadtime demand at each outlet of our dealer problem The leadtime demand uncertainty level of the aggregated inventory system

Cost of Safety Stock at Each Outlet The safety stock level at each outlet Is = z0.9σ = 1.285×7.07 = 9.08 The monthly holding cost of the safety stock TC(Is) = H×Is = 4,000x9.08 = 36,340RMB/month

Saving in Safety Stock from Pooling System-wide safety stock holding cost without pooling 4×C(Is) = 4 ×36,340=145,360 RMB/month System-wide safety stock holding cost with pooling C(Isa ) = 2 ×36,340=72,680 RMB/month Annual saving of 12x(145,360-72,680) = 872,160 RMB!!

BMW’s System Inventory With SL = 0.9: L = 2, Q = 36 (using EOQ), R=100/month z0.9 =1.285, Is =(1.285)(14.4)= 18.5 ROP = 2x100+ 18.5 =218.5 Total system average inventory: not own pipeline I = 36/2+18.5 = 36.5 owns pipeline I = 36/2+18.5+200 = 236.5

Takeaways (1) ROP =  + IS = RL + zβσ Leadtime demand usually must be treated as random, and hence creates risks for inventory decision We use safety stock to hedge the risk and satisfy a desired service level Together with the EOQ ordering quantity, the lot-size reorder point system provide an effective way to manage inventory under risk Reorder point under normal leadtime demand ROP =  + IS = RL + zβσ

Takeaways (2) For given target SL For given ROP ROP =  + zβσ = NORMINV(SL, ,σ) For given ROP SL = Pr(DL  ROP) = NORMDIST(ROP, , σ, True) Safety stock pooling (of n identical locations) Total system average inventory = Q/2 + Is not own pipeline = Q/2 + Is+RL owns pipeline