XW36 and MG67 MK 205 Mod 1/2 Catapult Cartridge MK 113 Mod 0/1 Rocket Motor Assembly Tina Simms CAD/PAD Logistics 23 May 2017.

Slides:



Advertisements
Similar presentations
Physiology of Flight Objective: Know the protective equipment used in actual flight.
Advertisements

Intro. Navy Logistics Concept - TAV Organization - NAVSUP Processes - SMR Technology - Systems, general IS/IT.
Welcome to Today’s Training. MILITARY AIRCRAFT EJECTION SYSTEMS and SHUTDOWN.
Advanced Training Systems International Ejection/Egress System.
DOE OFFICE OF INDIAN ENERGY Step 4: Project Implementation 1.
Launch Lug – helps to guide the rocket upward until it reaches enough velocity for the fins to engage. Parachute – assists in the safe recovery of the.
Emergency Evacuation Procedures
Summary of Fuse Testing for Barrel Module Fuse Boxes Duke University Jack Fowler.
EJECTION SEAT BY AJESH KUMAR.M.V NO:4401.
Science Fiction. Rocket flight Centre of Mass or Centre of Gravity (CM or CG) Centre of mass is the mean or central location of all the mass of an object.
LBT Q Engineering Review MCSC Mount Control System.
C-17 Program Description Three Contracts (All Solicited prior to 1 Jan 04) – Development – Production – Sustainment 180 Aircraft by Aug 08/126 currently.
Service Unit Validation What is it and how does it work.
Initiating Equipment PRs using ERP Process & Common Mistakes Dr. Khaled Al-Athel Director, Lab Technical Support Office.
© The McGraw-Hill Companies, Inc., Just-in-Time and Lean Systems.
February Monthly Status Review (MSR) Note: No presentation this month
Dale Roberts Sustainment Engineering Branch Defense Supply Center Richmond Defense Logistics Agency March 2005 Defense Logistics Agency Standardization.
Aprille Joy Ericsson Chapter 18
Advanced Planning Briefing for Industry TAC OVERVIEW and REVERSE AUCTION Wendy J. McCutcheon Technology Acquisition Center (TAC) Office of Acquisition.
1 BNL LHC Hi-Lumi QXF Vertical Test Facility Status Update M. Anerella, H. Hocker, P. Joshi, P. Kovach, A. Marone March 28, 2016.
JL47 PERIPHERY, MILD DETONATING CORD
Armament Directorate USAF Items of Interest Tim Culbertson
Tim McDavid AFLCMC/EBHJ – E23 23 May 2017
CAD/PAD Engineering Division Overview
2017 CAD/PAD Industry Summit
PIXEL CAEN Installation Status
Agenda Program Manager, Air (PMA)-201 Organizational Structure
DCMA On Time Delivery: Procedures & Business Rules
CAD/PAD Ordnance Assessment (OA) & Surveillance
CAD/PAD Development Process
DMSMS Management at NAVICP
Customer Advocate, Army CAD/PAD
CAD/PAD Life Cycle Sustainment Plan (LCSP) 2017 CAD/PAD International Logistics meeting Lee Manis USN/USMC CAD/PAD APML 23 May 2017.
Add Graphic(s) or Photo(s) CAD/PAD Staff Engineer
COMMANDseries V3 Roadmap
Small Column Insulated Delay (SCID) Issues
Program Shutdown Update
MT23/JM61 FIRE EXTINGUISHER CARTRIDGE
Naval Surface Warfare Center Indian Head Explosive Ordnance Disposal Technology Division Contract Demetrius Green Contract Support Division Director.
Joint Strike Fighter (F-35) Program Update 2017 CAD/PAD International Logistics meeting Lee Manis USN/USMC CAD/PAD APML 23 May 2017.
Rocketry.
USN/USMC CAD/PAD Program Overview 2017 CAD/PAD Industry Summit
USAF CAD/PAD Program Overview
FMCB Calendar 1/9/2017 Meeting Item Notes FMCB GM & COO remarks
The Cost of Service Life Extension 2017 CAD/PAD Industry Summit
Add Graphic(s) or Photo(s) CAD/PAD Acquisition Team Lead
CAD/PAD Requirements Determination
Foreign Military Sales (FMS)
Presenters: Andrew Brady & Bert Mannhalter
DCMA On Time Delivery: Procedures & Business Rules
Cockpit Thermal Environments
X-ray Pump-Probe Instrument
US Army CAD/PAD Program Overview CAD/PAD Industrial Summit 23 May 2017
Chief Information Officer
Lockheed Martin Canada’s SMB Mentoring Program
USN/USMC CAD/PAD Program Update 2017 CAD/PAD International Logistics Meeting Jurgen Smith USN/USMC CAD/PAD DPM 23 May 2017.
Reserved for Intro Picture
Detonating Cord Assembly (DCA)/ Thin Layer Explosive (TLX) Delivery Delays & Performance Issues Ben Kerlin, CAD/PAD, In-Service Engineering Detonating.
DMSMS Management at NAVICP
LESSON LD02 The Model Rocket
CAD/PAD In-Service Engineering
2017 International Logistics Meeting (ILM)
LESSON LD02 The Model Rocket
Quick reference: entering a requisition In escape RECEIVING AN ITEM
ISDEAA - P.L SECTION 105(l) LEASE PROPOSALS
Software System Integration
IT Managed Services Transition Weekly Activity Report: May 21st, 2019
Service Delivery Summaries
XRN 4954 – MiR Drop 5 - Status Update
Caplink Document Statuses
Presentation transcript:

XW36 and MG67 MK 205 Mod 1/2 Catapult Cartridge MK 113 Mod 0/1 Rocket Motor Assembly Tina Simms CAD/PAD Logistics 23 May 2017

XW36 and MG67 MK 205 Mod 1/2 Catapult Cartridge (XW36) Used to provide upward thrust of the ejection seat. MK 113 Mod 0/1 Rocket Motor Assembly (MG67) The Wind-Oriented Rocket Deployment (WORD) Motor Assembly assists in the initial downwind deployment of personnel parachute during low velocity, low altitude ejections. Items are used on both AV-8 and TAV-8 Aircraft MK 205 /XW36 MK 113 /MG67

Issue and Status Obsolescence issues have created a shortfall in production of new units Previous vendor was unable to deliver successfully Limited vendor base available to solicit Propellant quality issues continue to hamper current production Extremely low stock levels available world-wide for XW36 and zero stock available for MG67 Stock is issued by priority/deploying aircraft

Plan Forward XW36 and MG67 units are being managed on through Service Life Extensions (SLE) XW36 Units extended up to 108 months shelf MG67 Units extended up to 148 months shelf New plan/process approved and production has been initiated Ongoing effort to produce new acceptable propellant Expectations are to have the entire fleet of AV-8 and TAV-8 aircraft changed out by 2 Qtr FY18 Due to LAT failures and Eng Investigations FAT was invoked on both items. Once MK 205 passes FAT it will satisfy the FAT requirement for both MK 113 and MK 205. FAT and LAT are to be done concurrently which is scheduled for completion Dec 17.

MG67 RED STRIPE UPDATE On 18 Apr 2017 during OA testing of MG67, UPC07F004-005/-005A had a catastrophic failure resulting in a Red Stripe Condition Code F and J TAC05J004-007 lot assets were tested and recertified by Indian Head engineering for installation back into the fleet to replace the failed lot Contracting efforts are ongoing in an attempt to expedite delivery of new MG67s Propellant has been cast and is currently in the cure process