A PRESENTATION BY HPSEB LTD.

Slides:



Advertisements
Similar presentations
1 Power Development Strategy INDIA R.V. SHAHI SECRETARY MINISTRY OF POWER GOVERNMENT OF INDIA Presentation in World Bank, Washington DC June 23, 2003.
Advertisements

Overview of ER & Availability Based Tariff P.Mukhopadhyay.
It “Pays” to be Environment Friendly Renewable Energy Certificates: IPP Perspective.
1 RESTRUCTURED APDRP-II IN XI PLAN Scope of Part - B :  Strengthening of Distribution System. Fund Allocation of Part - B:  Proposed fund allocation.
Madras Chamber of Commerce & Industry & India Energy Forum Optimizing Transmission Sunil Varma Marri Head-Energy Practice Chennai 5 th September 2014.
Proposed APDRP during 11 th Plan  Continue APDRP during the XI Plan with the revised terms and conditions as a Central Sector Scheme.  The focus of.
Funding for a brighter tomorrow 1 POWER SECTOR CONCLAVE 14th – July Avkash Saxena General Manager (APDRP) Power Finance Corporation Ltd. Restructured.
INDIAN POWER SECTOR. ADMINISTRATION AND MANAGEMENT As per Constitution of India, Electricity comes under concurrent list i.e. the development and management.
Farmers Rural Electric Cooperative Corporation 2006 Load Forecast Prepared by: East Kentucky Power Cooperative, Inc. Forecasting and Market Analysis Department.
Over 3,300 Megawatts and Counting Growing and Transforming One of Nation’s Largest DSM Portfolios.
Energy & Environment Initiatives. 2 Technology Finance Group Supports demonstration projects & activities creating awareness The demonstration projects.
Loss Reduction and CDM at Gubbi Substation Energy Economy & Environmental Consultants Bangalore INDIA.
Cost of Service Indiana Industrial Energy Consumers, Inc. (INDIEC) Indiana Industrial Energy Consumers, Inc. (INDIEC) presented by Nick Phillips Brubaker.
Grid Integration of Renewable in India - Challenges and Policy Responses Sanjay Garg General Manager General Manager PGCIL/ Ministry of Power.
INDIAN POWER SECTOR. Presentation Contents: Power Sector Structure in India Transmission Planning Criteria RLDC ’ s Management System Restoration Procedures.
Electricity Generating Authority of Thailand (EGAT) 1 STRUCTURE, STATUS AND CROSS BORDER POWER INTERCONNECTION 0F THAILAND b y Mr. Prutichai Chonglertvanichkul.
Smart Power Generation in Jordan, IPP3 and IPP4 Case study.
AFREPREN/FWD Cogen Centre Training Workshop on Cogeneration in Africa
OVERVIEW OF INDIAN POWER SECTOR AND PLAN FOR 12 th / 13 th PLAN.
Sanjay Garg General Manager PGCIL/ Ministry of Power
14 TH NOV 2014 OPTIMISING POWER AVAILABILITY: ACTION PLAN FOR THE NEXT DECADE 2024.
Sterlite Grid Limited Committed to the nation's mission to provide quality power for all.
Load Forecast T SRINIVAS MANAGER SRLD C. LINKS PREAMBLE GENERATION ANALYSIS GROWTH OF I/C GROWTH OF I/C Vs DEMAND PHYSICAL INTERPRETATION ELECTRIC CONSUMPTION.
Power Trading By P.S.Bami President – India Energy Forum & Former Chairman & Managing Director, NTPC 1.
SRLDC WELCOMES SHRI VISHNUVARDHAN REDDY DIRECTOR(F) KPC.
WELCOME TO CIGRE MEMBERS
1 Electricity Use in California: Past Trends and Present Usage Patterns Rich Brown May 2002.
HYDRO TARIFF Commission Tariff Notification 26/03/01 Commission Tariff Notification 26/03/01 Applicable Period 01/04/01 to 31/03/04 Applicable Period 01/04/01.
IMPACT OF ABT, NETWORK STRENGTHENING ON GRID OPERATION IN KARNATAKA SOUTHERN REGIONAL LOAD DESPATCH CENTRE POWER GRID CORPORATION OF INDIA LIMITED ADVANTAGE.
Blue Grass Energy Cooperative Corporation 2006 Load Forecast Prepared by: East Kentucky Power Cooperative, Inc. Forecasting and Market Analysis Department.
Licking Valley Rural Electric Cooperative Corporation 2006 Load Forecast Prepared by : East Kentucky Power Cooperative, Inc. Forecasting and Market Analysis.
POWER SECTOR REFORMS Grid Operation and Control in the changed Scenerio.
Presentation on Capacity Addition targets for X th Plan MINISTRY OF POWER 2 nd May 2002.
CHALLENGES AND INVESTMENT OPPORUNITIES: THE CASE OF ZESA By Mr Ikhupuleng Dube, System Development Manager – Zimbabwe Electricity and Transmission Company.
EXPERIENCE SHARING OF AGDSM PROJECT AT CESC MYSORE Shri M. Muniraju Chief Engineer Chamundeshwari Electricity Supply Corporation Limited (CESC), Mysore.
1 AUDITORS. 2 SOUTHERN REGION WESTERN REGION EASTERN REGION NORTHERN REGION NORTH- EASTERN REGION INSTALLED CAPACITY NORTHERN :- 31,230 MW EASTERN :-
Terms & Definitions.
Power to the Coast Project Presented by: Su Wei Tan Industrial Research Ltd.
POWERGRID Welcomes Shri Atal Bihari Vajpayee Hon ’ ble Prime Minister of India on Inauguration of Northern Region Unified Load Dispatch and Communication.
1 SYMPOSIUM: U G A N D A A F T E R I D I A M I N A N D M I L T O N O B O T E Hamburg, Germany 29 th September 2008 INVESTMENT OPPORTUNITIES IN POWER GENERATION.
ENERGY CONSERVATION IN SR - A CASE STUDY
In the Matter of Filing of the Aggregate Revenue Requirement (ARR) for the third Control Period (FY to FY ) under section 62,64 and 86.
Results Framework Document
STATE ELECTRICITY BOARD
Damitha Kumarasinghe Director General
Meeting of Generation Wing Officers
HPSEBL 6th TECHNICAL COORDINATION COMMITTEE (TCC) &
Presented by : Er.Suneel Grover
Presented by : Er.Suneel Grover
CHALLENGES & PLANS FOR DEMAND MANAGEMENT IN INDUSTIAL HUBS - A PRESENTATION BY HPSEB LTD. Venue: Baddi September 28, 2010.
A PRESENTATION BY HPSEB LTD.
AQUIFER MAPPING ARTIFICIAL REACHARGE STRUCTURES ROLE OF CGWB
Existing Power Systems of HPSEBL
REGIONAL GRIDS IN INDIA – QUICK FACTS
Presented by : Er.Suneel Grover
Power Supply Scenario in the State of Himachal Pradesh
SOLAR POWER A SUSTAINABLE ENERGY SOURCE DMRC’s INTITATIVES
DCC Cluster/Working Group Energy MTDS (GoT) priorities for the sector
Rajib Das Dy GM, Planning November 5, 2017 Transition of India’s
Summer Plan: 2013 (1st March – 31st May)
Opportunities in the Changing Energy System
THE 84th ANNUAL GENERAL MEETING
POWER SCENARIO IN HIMACHAL PRADESH
Yangon Region Rural electrification plan
“Efficient & Cost Effective Power Purchase Planning”
Convergence of EVs, Battery Storage
ODISHA POWER SECTOR SUPPORT OF STATE GOVT
HP STATE ELECTRICITY BOARD
Key Biscayne Substation
Perspectives on The Future of the Energy Sector
Presentation transcript:

A PRESENTATION BY HPSEB LTD. Venue: Baddi September 28, 2010

INDEX Peculiar Power Conditions in HP Projected Growth in Availability Projected Growth for Demand Overview of System Network Diagram Inter State Connection Points Category Wise Consumption Meeting Power Consumption Meeting Consumption in the State Meeting Industrial Consumption Trends Our Availability & Demand Pattern Typical Summer Industrial Consumption Typical Winter Industrial Consumption Existing Consumption Pattern Projection Demand & Availability Projected Growth for Energy Requirement Projected Growth in Average Demand New Initiatives Taken

Peculiar Power Conditions In HP Power in Himachal Pradesh is predominantly Hydro with the availability comprising of: Own Generation ( 100 % Hydro) – 467 MW Central Sector/bilateral shares (10 to 15% thermal) – total approx. 900 MW This results in HPSEB being surplus in power during the monsoon months, and extreme deficits in winter months since Our own generation reduces almost to 15- 25% due to lean water discharge Similar reduction happens with our Central Sector Shares from hydros in the region. There is an increase in demand due to the cold weather

Projected Growth in Availability (MW)

Projected Demand (MU)

OVERVIEW OF SYSTEM

Giri PSEB Hamirpur Jasoore Panchkula Bhakra Dehar Full Image

Kandrori (16 MW) Amb I & II (60 MW) Golthai/ Rakkar (35 MW) Baddi-Barotiwala-Nalagarh area (290 MW) Paonta Sahib ( 40 MW) Kala –Amb (90 MW)

Hoshiarpur-Hamirpur 220kV Jalandhar-Hamirpur 220kV HPSEB – Inter State Connection points Pong-Jasoore 220kV Hoshiarpur-Hamirpur 220kV Jalandhar-Hamirpur 220kV Dehar-Kangoo 220/132kV Panchkula-Kunihar 220kV Khodri-Majri 220kV

Category wise consumption (%) Category wise consumers in %age Total consumption = 4038 MUs

AVAILABILITY OF ADEQUATE POWER – PROJECTIONS THEREOF

Meeting the Growing Demand - Measures Utilization of: Own generation. Utilization of 100% SOR shares. GoHP entire entitlements in NJHPS & NHPC Projects & other upcoming Projects connected with CTU during winter months. Generation shares in HPPCL Projects against equity. Purchase of power from existing SHPs and coming up in the State. Emphasis on enhanced shares in Central Sector generating stations particularly UMPPs. Banking of power during monsoon for its return during winter months. Purchase of Power from IPPs with whom GoHP has signed IAs Purchase of power from open market/energy exchange platforms.

Meeting Consumption in the State HPSEB Ltd. Has requisitioned power from upcoming UMPP & other projects being developed in Central Sector/ Joint venture as per details given below: Barh-I & II STPP North Karanpura STPP Rihand-III STPP Meja STPP Lata Tapovan HEP Rupsiabagar HEP Orissa-I (UMPP) (100MW) (2014-15) Tamil Nadu-II (UMPP) (45MW) (2015-16)

TYPICAL TRENDS

Our Annual Availability and Demand Pattern Monthly Availability (MU) Monthly Demand (MU)

Typical Summer Consumption Curve Peak Consumption > 900 MW MW Hours of the day

Typical Winter Consumption Curve Peak Consumption > 1118 MW MW Hours of the day

Location wise Industrial Load for a Typical Day (14.08.10) MW Hour of the Day

220kV Panchkula -Baddi Line 400/220kV Nalagarh (Powergrid) 2x315 MVA 400kV Kunihar 132/33kV = 1x16+1*25/31.5MVA 132/11kV=1x25/31.5MVA 33/11kV = 1x2.5MVA 220/132kV = 2x80/100MVA 220/33kV = 1x25/31.5 MVA 66/33kV= 1x20 MVA 66/11kV = 4x20KVA 132/66kV=3x31.5MVA 132/11kV =31.5*2+16*1+20*1 Capacity = 193.5 220/132kV=2x80/100MVA 132/33kV = 1x8 MVA 132/66kV=1x31.5 MVA 132/33kV=1x50 MVA 132/33kV = 2x25/31.5MVA 132/11kV = 2x25/31.5MVA 220/ 132kV Devani 220/132/66/33/ 11 kV Baddi 132/66/33 kV Solan 132/66/11kV Baroti-wala Giri 132/33 /11kV Kala Amb 132/33 /11 KV Poanta Sahib 400/220kV Nalagarh (Powergrid) 2x315 MVA 220/66kV Uparla Nangal (1x80/100) MVA ~ From Khodri (Uttaranchal) GIRI HEP 100 MVA 220/132/ 33kV Kunihar Panchkula

MEASURES TO MEET GROWING DEMAND IN INDUSTRIAL BELTS

To ensure availability of power to all, especially to our esteemed industrial consumers; Transmission system is being upgraded/ augmented and new elements are being added Also, Sub-Transmission & Distribution elements are being added in the existing system

New Initiatives Infrastructure worth Rs. 1,000 Crs has already been set up in the state to cater to the Industrial belts of the state Another Rs. 900 Crs is being spent on augmenting/upgrading the infra- structure in the next two to three years…

New Initiatives Works to be completed during next two years for capacity addition 220/66 kV substation at Uparala Nangal (Nalagarh) 400 kV, 2X 315 MVA sub station at Kunihar along with 400 kV transmission line from Nalagarh to Baddi R-APDRP (Part-B) Scheme for Baddi Town worth Rs.87.65 Cr. has been submitted to GOI under which provision for HVDS, renovation, modernization & strengthening of 11kV system has been made. Augmentation of existing 20 MVA power transformer to 40 MVA at 132/66 kV substation Pong (Sansarpur Terrace) Reduction in T&D Losses to enhance availability.

EHV Substations catering to Industrial Demand: Name New Initiatives EHV Substations catering to Industrial Demand: Name Existing System Details MVA Nalagarh 66/33 kV 2X20 MVA, 66/11 kV 2 X20 MVA. 66 kV feeders to Gauntar and Jaypee 80 Baddi 220/66 kV 2 X 80/100 MVA 220/33 kV 1 X 25/31.5 MVA 231.5 Barotiwala 132/66 kV 3 X 31.5 MVA 132/11 kV 1 X 25/31.5, 1 X 16 MVA, 1 X16/20 MVA, 1 X 25/31.5 MVA 173.5 Paonta Sahib 132/33 kV 1 X 25/31.5 MVA, 1 X 16 MVA, 132/11 kV 1 X 25/31.5 99 Kala-Amb (i) 132/33 kV 2 X 25/31.5 MVA, (ii) 132/11 kV 1 X 25/31.5 MVA 94.5

New Initiatives EHV Substations catering to Industrial Demand: Name Existing System Details MVA Una (Amb I & II) 132/33 kV 1 X 25/31.5, 1 X 16 MVA 47.5 Kandrori 132/33 kV 2 X 16 MVA 32 Golthai & Rakkar 66/11 kV 1X6.3 MVA, 66 kV feeder to Industry 6.3 Pinjore -Parwanoo 66/11 kV 2 X 20 MVA 40 Terrace 66/11 kV 2 X 10 MVA 20 TOTAL 824.3