WF on CB-group based retransmission

Slides:



Advertisements
Similar presentations
Way forward for LTE DL 4Rx AP SI on RF
Advertisements

WF on design of physical downlink control channel for MTC CATT, Alcatel Lucent, Alcatel Lucent Shanghai Bell, Ericsson, ETRI, InterDigital, MediaTek, NTT.
WF on PBCH Coverage Enhancement
Way forward on eIMTA signaling to support up to 32 component carriers
3GPP TSG RAN WG1 # R1-15xxxx Fukuoka, Japan 25th – 29th May 2015
WF on BS MMSE-IRC receiver
WF on CQI Table for eMTC ZTE, Sony, Nokia, Ericsson, Samsung… R GPP TSG RAN WG1 #83 Anaheim, USA, 15th – 22nd November, 2015 Agenda item
WF on Support of EBF/FD-MIMO Features in TM9
WF on MCOT and CWS for LBT priority classes
Way forward to NB-IoT 3GPP TSG RAN WG1 #83 R1-157xxx
WF on SIB1bis Transmission
WF on LAA DL Multi-Channel LBT
Proposal for NB-IoT single-tone only UE
WF on UE capability signaling for FD-MIMO Class B LG Electronics, Intel Coorporation, NTT DOCOMO, Qualcomm 3GPP TSG RAN WG1 Meeting #84 R St Julian’s,
Clarification of the scope of the study on latency reduction techniques for LTE 3GPP TSG RAN Meeting #71RP-16xxxx Göteborg, Sweden, March , 2016.
WF on MCOT limit Signaling and Modifying LBT type Ericsson, … 3GPP TSG RAN WG1 #85 R1-16xxxx Nanjing, China 23 rd – 27 th May 2016 Agenda item:
WF on Supporting different Numerologies in a NR carrier LG Electronics, [Huawei, HiSilicon, Panasonic], 3GPP TSG RAN WG1 Meeting #85R Nanjing,
Overview of open issues in
WF on Bandwidth Part for DL common channel
3GPP TSG-RAN WG4 Meeting NR#3 Nagoya, Japan, 18 – 21 Sep, 2017
Summary of SLS for RRM NTT DOCOMO
Offline Discussion on remaining details about RACH Procedure
WF on UL Transmission for Difficult Band Combinations in LTE-NR DC
Draft WF on single Tx switched UL
Single Tx switched UL DRAFT 3GPP RAN #77 September , 2017
R GPP TSG RAN WG1 Meeting #90 Prague, P.R. Czechia, 21st – 25th August 2017 Agenda: WF.
WF on NPUSCH scrambling for Rel-14 NB-IoT
WF on pre-DFT PT-RS pattern for DFTsOFDM
Summary of proposals on CBG-based retransmission
WF on single Tx switched UL
Proposals on remaining issues on PDCCH structure
RACH configuration ZTE, Sanechips R1-171xxxx
Summary of offline discussion for PDCCH structure
Proposals on remaining issues on search space
WF on Beam Indication for Beam Management
WF on NB-IoT Radio Link Monitoring Performance Test Procedure
Way forward on UE EIS Spherical Coverage and Beam Correspondence
3GPP TSG RAN WG1 Meeting #90bis
R : SRS Enhancements for LTE-A
R WF on channel raster Nokia,.
R WF on channel raster Nokia,.
WF on remaining open items for allowing 1Tx transmission in LTE-NR DC
WF on Beam failure recovery
Way forward on cell identification in NR
Discussion on TB-ack/CBG-Nack for initial transmissions
Proposal for defining requirement of LTE BHH TRP/TRS
WF on transmit diversity for DFTsOFDM
Way forward on DL ACLR&ACS for WP5D LS
Samsung, KT Corp., NTT DOCOMO, Verizon, [ZTE], [CATT], [Intel]
WF on beam reporting CATT, Intel R1-17xxxxx
WF on Beam-Related Indication
WF on CSI timing offset for PUSCH
R WF on channel raster Nokia,.
Shanghai, China, April 11-15, 2011 Source: Qualcomm Incorporated
WF on Radio Link Monitoring in NR
Motorola Mobility, Lenovo, …
WF on UE mandatory channel bandwidth for NR bands
WF on scenarios and evaluation assumptions for flexible duplex
WF for 4Rx CA 256QAM(1/2 layer) and 3/4 layers tests in Rel-14
Motivation for WI on "LTE-based V2X Services"
WF on LTE-NR DC with UL coexistence
Summary on CA Aspects Samsung 3GPP TSG RAN WG1#91
WF on 4Tx UL Codebook For CP-OFDM
WF on UL Beam Management
WF on UL Beam Management
Summary on CA Aspects Samsung 3GPP TSG RAN WG1#91
WF on LTE-NR Coexistence
3GPP RAN1 status on NR-Unlicensed
Status of NR-U - Wi-Fi coexistence
Jing Sun, Qualcomm Incorporated Rapporteur of Rel.16 NR-U Work Item
Presentation transcript:

WF on CB-group based retransmission 3GPP TSG RAN1#88bis Spokane, USA, 3rd – 7th, April, 2017 Agenda Item: 8.1.3.3.2 R1-17xxxxx WF on CB-group based retransmission Samsung, [Ericsson, KT, ZTE, ZTE Microelectronics, SEQUANS], …

Background In RAN1#88, the following working assumption was made. CBG-based transmission with single/multi-bit HARQ-ACK feedback is supported in Rel-15, which shall have the following characteristics: Only allow CBG based (re)-transmission for the same TB of a HARQ process CBG can include all CB of a TB regardless of the size of the TB – In the such case, UE reports single HARQ ACK bits for the TB CBG can include one CB CBG granularity is configurable

Proposal Confirm the working assumption as below. CBG-based transmission with single/multi-bit HARQ-ACK feedback is supported in Rel-15, which shall have the following characteristics: Only allow CBG based (re)-transmission for the same TB of a HARQ process CBG can include all CB of a TB regardless of the size of the TB – In the such case, UE reports single HARQ ACK bits for the TB CBG can include one CB CBG granularity is configurable

Proposal The UE is semi-statically configured by RRC signaling to enable CBG-based retransmission. The above configuration to enable CBG-based retransmission is separate for DL and UL. For initial transmission of a PDSCH or PUSCH, the CBs of the PDSCH or PUSCH transmission are grouped into the configured number of CBGs based on a rule on how to group CBs. The rule on how to group CBs is described in the L1 specs. FFS how to operate CBG-based retransmission when the number of CBs is smaller than the configured number of CBGs. FFS how to group CBs for retransmission of the PDSCH and PUSCH