TABLE OF CONTENTS Summary of TEIN4 Strategy for Expected Outcomes for

Slides:



Advertisements
Similar presentations
AICTEC 30 November February 2002 East-West Center University of Hawaii, Honolulu Connections to Europe from the Pacific Rim George McLaughlin.
Advertisements

Kazunori Konishi NOC Director of APAN-JP Consortium Seoul NOC Report.
International Research Networking David West, DANTE Global Collaborations, APAN, Manila, 23 January 2007 Using TEIN2 while Planning TEIN3 TEIN
Fellowship Program Committee - 18 th APAN Meetings Jie An Cairns.
Internationalized Domain Names: Opportunities for the Arab World Baher Esmat ICANN.
Regional ATN Transition Planning
A S I A P A C I F I C N E T W O R K I N F O R M A T I O N C E N T R E Welcome! Training BOF APNIC Open Policy Meeting August 2001, Taipei, Taiwan.
1 APNIC Status Report RIPE 50 Stockholm, Sweden. 2 Selected activities – Services IPv4 Allocations – accelerating –Single /8 allocation in Japan IPv6.
Report on APIX meeting #4. What is APIX Forum? An association of Internet Exchange Providers (IXP) in Asia-Pacific region Goals and Objectives – To share.
ASGC Updated HSIN-YEN CHEN LHCONE workshop CERN 10 Feb
Organization TEIN*CC Project TEIN4 TEIN*CC is located in Korea. TEIN4 starts in APAN since The.
1 Analysis and Study on BGP Routing Information and Flow Data Yoshiaki HARADA Graduate School of Information Science and Electrical Engineering (ISEE)
Confidential & Proprietary Copyright © 2009 The Nielsen Company Nielsen Global Consumer Confidence Survey - Willingness to Pay for Online Content Asia.
APIX update APIX association AP* retreat, Sunday 14 Sep
From Asia / For Asia 扬名亚洲 联系全球. DotAsia Organisation Membership-based, Not-for-profit Organisation incorporated in Hong Kong SAR, China First gTLD (Generic.
NREN Users in Eastern Europe CEENGINE Work Package #2 Dr. Krasimir Simonski – Chair of CEENet Krasimir Simonski,
APAN Update Jianping Wu Vice Chairman of APAN Feb. 25, 2007.
ASGC T1 report HSIN-YEN CHEN APAN38 NanTou 13 Aug
Subbiah Arunachalam M S Swaminathan Research Foundation Chennai , India Communication flow and information access in South and South East.
Internet Education and Research Laboratory (intERLab) APStar Retreat and Asia Africa Networking Forum Meeting 20 February 2011.
LHC network in Asia HSIN-YEN CHEN APAN38 NanTou 13 Aug
APII APII & TEIN Update: New Agenda & Initiative(2) APAN-18/North Asia 5 July 2004, Cairns, AU Bo-Hyun SEO Director of APII-CC, KISDI Member of ANF Council,
LHCONE & TEIN TEIN*CC Patch Lee 1 Nantou, TW 13 August 2014 TABLE OF CONTENTS 1.TEIN4 Networks 2.Understanding of Data Flow from CERN 3.Benefits for deploying.
20 th APAN Meeting, Taipei 23/27 August 2005 TEIN TEIN2 Overview David West TEIN2 Project Manager DANTE Slide 1.
Transition of APAN December 19, 2003 Bangkok, Thailand.
1.  Infrastructure status  Up to 60G backbone for testing network equipment capability  10~60G backbone is deployed nationwide (6 Pops)  About 60.
APAN Regional Network Meeting, Busan, S Korea, 26th Aug 2003 SEA REN By Borhanuddin Mohd Ali, UPM.
AP* Retreat APAN Activities Kilnam Chon APAN Chair
International Research Networking David West, DANTE 26 April 2007 S Asia Planning Meeting Crystal Gateway Marriott, Arlington, Virginia TEIN2 experiences.
A S I A P A C I F I C N E T W O R K I N F O R M A T I O N C E N T R E APNIC Update ARIN-VII San Francisco, April 2001.
Internet Education and Research Laboratory (intERLab) APStar Retreat Gold Coast Meeting 23 August 2010.
1 APAN Secretariat Report 21 July 2006 Dr. Wanchai Rivepiboon MD, APAN-Sec.
1 APAN and South Asia Shigeki Goto APAN. 2 APAN is a coordinating body. APAN does not have any links. APAN members have many links. APAN APAN members.
IntERLab 2009 Kanchana Kanchanasut. Roles Information Center for AP Internet development and various initiatives HRD for Internet infrastructure in AP.
Services Area Report Sanjaya Services Area Manager.
1 APCAUCE Updates Jeonghye Choi APCAUCE Secretariat AP* Retreat Meeting (Kuala Lumpur, 22 Feb 2004)
TEIN & APII Update and New Agenda & Initiative APAN-17/North Asia Net Group 29 Jan 2004, East West Center, HNL Bo-Hyun SEO Director of APIICC, KISDI
TEIN/APII(KR) Update & Agenda APAN-17/Backbone Com. 28 Jan 2004, Univ Hawaii, HNL Bo-Hyun SEO Director of APIICC, KISDI KOREA INFORMATION.
APAN Secretariat Report 30 August 2007 Dr. Vimolrat MD of APAN-Sec
Report Fellowship Committee Meeting 23 rd APAN, Manila Meeting Chair: Rahmat Budiarto NAv6, USM.
Introduction to Asia Tier Center Forum Seo-Young Noh GSDC, KISTI.
APAN Secretariat Report 25 January 2008 Dr. Vimolrat Ng. MD of APAN Secretariat
FELLOWSHIP REPORT 24 th APAN MEETING XI’AN, RAHMAT BUDIARTO CHAIR.
Inter-Cluster Links between North and South Jan. 28, 2004 Kazunori Konishi ( APAN-JP )
APAN Secretariat Report 25 January 2008 Dr. Vimolrat Ng. MD of APAN Secretariat
Medical Workshop Network Update on TEIN2 Xing Li :00-10:30.
ASGC Activities Update Hsin-Yen Chen ASGC LHCONE/LHCOPN meeting Taipei 13 Mar
APAN members Primary members: AARNet (AU), APAN-CN,  HARNET (HK), APAN-JP, ANF (KR),  SingAREN (SG), APAN-MY, APAN-TW, ASTI.
Regional ATN Transition Planning
TEIN3 NOC Updates (Feb 2011 – Jul 2011)
Visibility Activities and Plan
2nd Asia Tier Centre Forum Summary report 4th April 2017 edoardo
TEIN / NOC Report Zhonghui Li 28 Aug 2017.
Zhonghui Li TEIN3 NOC Service Manager
Report from TEIN*CC - Activity Report -
APNIC Report LACNIC VIII Lima, Perú.
Combined Budget of Awarded
Fellowship Program Committee - 19th APAN Meetings
CanalAvist Operation ID TH MY HK* KR JP JP VN PH CN CN KR HK* VN PH TH
ATCF3 - discussion 3rd Asia Tier Centre Forum Daejeon, South Korea 12th October 2017
Asia/Pacific ATN Regional Backbone
TEIN2 Project - Initial Consideration (revised) -
11/23/13 Topic 5: Legal Status Juneho Jang Senior Regional Manager.
KRNIC Member Workshop November 2001 Seoul, Korea
Brokerage Event Robotics Digital Factories Smart Anything Anywhere
APAN update & update Yasuichi Kitamura APAN Board member Steering Committee member.
Yong Jin Park Busan, Korea
APAN Secretariat Report
APAN Network Research Workshop
Unadvertised Addresses in APNIC’s Registry
Presentation transcript:

Asi@Connect & its’ Network TABLE OF CONTENTS Summary of TEIN4 Strategy for Asi@Connect Expected Outcomes for Asi@Connect Applications/Services Connectivity - Backbone Connectivity - Access 16 Feb. 2017 New Delhi, India Patch Lee, TEIN*CC

1. SUMMARY – Participation in the project 23 18 +5

TEIN PARTNERS – COUNTRY/ECONOMY 1. SUMMARY – Participation in the project TYPE TEIN PARTNERS – COUNTRY/ECONOMY TEIN3 TEIN4 BENEFICIARY BD, BT, ID, IN, KH, LA, LK, MY, NP, PH, PK, TH, VN (13) BD, BT, ID, IN, KH, LA, LK, MY, NP, PH, PK, TH, VN, AF(Aug. ‘13, Daejeon), MM(Aug. ‘14, Nantau), MN(Mar. ’15, Fukuoka) (16) NON-BENEFICIARY AU, CN, JP, KR, SG (5) AU, CN, JP, KR, SG, HK(Aug. ’12, Colombo), NZ (Mar. ‘15)(7) NO-STATUS HK, TW (2) TW (1)

1. SUMMARY – Traffic Growth 2 fold increase in 4 years

1. SUMMARY – Scale up of Bandwidths 3 fold increase in 4 years

1. SUMMARY – Scale up of Bandwidths 3 fold increase in 4 years

1. SUMMARY - Asi@Connect (DEC. 2016) AF, 155M CN, 2X1G BT 10G NP, 45M EU BJ TH, 1G BD, 45M KREONET/KR, 1G LK, 1G KOREN/KR, 10G 10G IN, 10G 10G TW, 2.5G 10G HK IN JGN/JP, 10G PK, 1G HK, 1G MY, 1G 10G 10G VN, 1G SG TH, 600M PH, 1G KH, 10M LA, 10M MM AU, 2.5G ID, 622M MN NOT CONN. NZ, 100M SG, 10G SINET/JP, 10G KOREN/KR, 1G

2. Strategy for the Asi@Connect project PLATFORM

2. Strategy for the Asi@Connect project

2. Strategy for the Asi@Connect project

BREAK TIME 31,235K€ 14,000 1,485 3,350 4,500 4,100 3,800 45% 5% 11% 14% 13% 12% WP1 WP2 WP3 WP4 WP5 WP6

2. Strategy for the Asi@Connect project PLATFORM - New setup of or further development of existing one Applications/Services Technology based/oriented Social benefits focused Network Connectivity Backbone Access

3. Expected Outcomes – Applications/Services 5Gx2 100G 10G IN SG HK BJ EU PLATFORM(場) SDN, Cloud Telemedicine E-learning Digital library E-culture …

3. Expected Outcomes – Applications/Services Common platform for Network Service (LHCONE)

3. Expected Outcomes – Applications/Services Common platform for Applications (Cyber performance) Country A Country B Country C

3. Expected Outcomes – Applications/Services Common platform for Applications (Requirements) Websites Event notice, progress & result Networks Multicast enabled -> live distribution and real time view Storages/Clouds Records of previous performances stored & accessible anytime anywhere

3. Expected Outcomes – Backbone DEC. ‘16 DEC. ‘21 10G EU BJ 10G IN SG HK BJ EU 100G 5GX2 100G HK IN 5GX2 100G SG 1) SG-EU: ’19~’20 2) HK-SG: ‘20 3) HK-BJ: ‘20~’21

3. Expected Outcomes – Access 10G EU BJ Connection of not-connected BT, MM & MN Newcomer – Brunei(?) Bandwidth >= 10G(?) Change of Control (?) Procurement for access all hand-over to each partner TEIN*CC manages backbone and its relevant services 100G 5GX2 100G HK IN 5GX2 100G SG

Q&A