Toward the final design of a TPC for the ILD detector

Slides:



Advertisements
Similar presentations
TIME 2005: TPC for the ILC 6 th Oct 2005 Matthias Enno Janssen, DESY 1 A Time Projection Chamber for the International Linear Collider R&D Studies Matthias.
Advertisements

CO2 cooling for FPCCD Vertex Detector Yasuhiro Sugimoto KEK 1.
KEK Recent results of beam tests on clearing electrode and grooves 2010/1/191ILC DR WebEx Meeting Y. Suetsugu, KEK.
Research and development of Micromegas detector and related devices (Project N° ) Updated progress report and extension request P. Colas, S. Mukhopadhyay.
D. Peterson, “Status of the Cornell/Purdue Program” TPC R&D Mini Workshop, Orsay 12-January Status of the Cornell/Purdue Program: first events with.
Remaining Issues Tests and demsonstration in the 3.5T magnetic field 1 Tests in the 3.5T magnetic field: (1)Engineering studies such as the possible mechanical.
23 May 2011ILD Workshop - LAL, Orsay1 TPC development status in preparation of DBD (and further) Jan Timmermans.
Gaseous Tracking (TPC) Summary LCWT09 Nov. 5, 2009 LAL, Orsay Takeshi MATSUDA DESY/FLC 1.
P. Colas on behalf of LCTPC. 2 detector concepts : ILD and SiD SiD: all-silicon ILD: TPC for the central tracking 15/05/2012P. Colas - LCTPC2 Both based.
P. Colas on behalf of LCTPC Frontier detectors for frontier physics 12 th Pisa meeting on advanced detectors Isola d’Elba, May 2012.
Status and outlook of the Micromegas modules D. Attié, D.S. Bhattacharya, P. Colas, S. Ganjour, et al. LCTPC Collaboration meeting DESY, 30/05/2014.
1 Pixel readout for a TPC LCWS 2010 – Tracking TPC R&D session 27 March 2010 Jan Timmermans On behalf of the Bonn/CERN/Freiburg/Nikhef/Saclay groups.
ILD Large Prototype TPC tests with Micromegas D. Attié, A. Bellerive, P. Colas, E. Delagnes, M. Dixit, I. Giamatoris, A. Giganon J.-P. Martin, M. Riallot,
A TPC for the Linear Collider P. Colas, on behalf of the LCTPC collaboration Instrumentation for Colliding Beam Physics 2014 Novosibirsk, Russia.
D. Attié CEA Saclay/Irfu RD51 – ALICE Workshop June 18 th, 2014 ILC-TPC Micromegas: Ion Backflow Measurements.
R&D status of FPCCD VTX and its cooling system Yasuhiro Sugimoto for FPCCD VTX group 1.
1 R&D Status and plan for FPCCD VTX Yasuhiro Sugimoto
Large prototype goals Endplate design P. Colas. General ideas We have to agree first on the goals to understand how to build the endplate We have to agree.
EPS-HEP 2015, Vienna. 1 Test of MPGD modules with a large prototype Time Projection Chamber Deb Sankar Bhattacharya On behalf of.
Dan Peterson, Cornell University Presented at the Workshop on Detector R&D Development of a Low-Material TPC Endplate for the ILD Experiment at.
P. COLAS, CEA/SACLAY New Results from the LC Large TPC prototype 31/10/2014 LC TPC recent results 1 Kolkata, RD51 WG1.
FPCCD option Yasuhiro Sugimoto 2012/5/24 ILD 1.
TPC electronics for ILD P. Colas Krakow, IFJ-PAN, ILD Pre-meeting September 24, 2013.
Toward the final design of a TPC for the ILD detector D-RD9 P. Colas, K. Fujii et al. TYL-FJPPL Okinawa 2015.
A TPC for ILC CEA/Irfu, Apero, D S Bhattacharya, 19th June Deb Sankar Bhattacharya D.Attie, P.Colas, S. Ganjour,
TPC Integration P. Colas (thanks to D. Attié, M. Carty, M. Riallot, LC-TPC…) TPC layout(s) Services Power dissipation Endplate thickness and cost Mechanical.
LEPP meeting Dan Peterson ILC highlights : Development of a TPC for the ILD detector at the ILC There are some significant differences between.
Takeshi Matsuda LC TPC Collaboration March 5, 2008 TPC Endcap Materials.
The LC TPC Review by ECFA Detector Panel On 4-5 Nov at DESY & After T. Matsuda LCTPC Collaboration Meeting 30 July, 2014 DESY.
Towards a 7-module Micromegas Large TPC prototype 1 D. Attié, P. Baron, D. Calvet, P. Colas, C. Coquelet, E. Delagnes, M. Dixit, A. Le Coguie, R. Joannes,
R&D by LCTPC collaboration Last week: DESY PRC review: Status report:
Wenxin Wang 105/04/2013. L: 4.7m  : 3.6m Design for an ILD TPC in progress: Each endplate: 80 modules with 8000 pads Spatial Resolution (in a B=3.5T.
P. Colas on behalf of LCTPC. Strategy for Micromegas The Micromegas option is studied within the same (EUDET) facility as the other options (see R. Diener’s.
1 FPCCD VTX Work Plan Y. Sugimoto 2010/1/22. 2 FPCCD: Features and R&D issues (1/2) Small pixel size (~5  m) –Sensor development Small size chip; ~6mm.
R&D Status and plan for FPCCD VTX Yasuhiro Sugimoto
Research and development of Micromegas detector and related devices (Project N° ) Updated progress report and second extension request (up to March.
Tracking in a TPC D. Karlen / U. Victoria & TRIUMF for the LCTPC collaboration.
D. Attié, P. Baron, D. Calvet, P. Colas, C. Coquelet, E. Delagnes, R. Joannes, A. Le Coguie, S. Lhenoret, I. Mandjavidze, M. Riallot, E. Zonca TPC Electronics:
On behalf of the LCTPC collaboration VCI13, February 12th, 2013 Large Prototype TPC using Micro-Pattern Gaseous Detectors  David Attié 
LCTPC “Advanced Endplate” (Discussion) LC TPC Meeting at ALCGP07 T. Matsuda.
D. Attié, P. Colas, E. Delagnes, M. Riallot M. Dixit, J.-P. Martin, S. Bhattacharya, S. Mukhopadhyay Linear Collider Power Distribution & Pulsing Workshop.
TRACKING AND VERTEXING SUMMARY Suyong Choi Korea University.
1 TPC Large Prototype (LP) Beam Tests Jan Timmermans NIKHEF/DESY (for LCTPC Collaboration) ALCPG 2011, Eugene.
D. Attié, P. Colas, K. Fujii,T. Matsuda, M. Riallot, A. Sugiyama, W. Wang Thanks to M. Dixit, Yun-Ha Shin, S. Turnbull,Yulan Li Construction and tests.
On behalf of the LCTPC collaboration -Uwe Renz- University of Freiburg Albert-Ludwigs- University Freiburg Physics Department.
2016/12/6 Yasuhiro R&D status of a gas-compressor based 2-phase CO2 cooling system for FPCCD vertex detector 2016/12/6 Yasuhiro Sugimoto.
For the CMS Pixel detector
Large Prototype TPC using Micro-Pattern Gaseous Detectors
Readiness of the TPC P. Colas What is left before final design?
Status and Future Developments of TPC’s with MPGD readout systems
SUMMARY OF THE ORSAY LD-TPC ELECTRONICS MEETING
Large Area Endplate Prototype for the LC TPC
Electronics for ILD TPC
P. Colas for the LC TPC collaboration
Effect of primary ions in a FCC-ee/TLep Philippe Schwemling.
Power pulsing of AFTER in magnetic field
A TPC for the Linear Collider
HARPO, a Micromegas+GEM TPC for gamma polarimetry above 1 MeV
Potential Ion Gate using GEM: experiment and simulation
Micromegas module for ILC-TPC
TPC electronics for ILD
TPC Paul Colas Technical meeting, Lyon.
Paul Colas, CEA Saclay, Akira Sugiyama, Saga U.
TPC Development at Cornell
Ron Settles MPI-Munich ALCPG09 Testbeam Session
Development of gating foils using FPC production techniques
Barry Barish Paris ICHEP 24-July-10
D. Attié, P. Colas, K. Fujii,T. Matsuda,
Covering a Large Area ILC-TPC endplate
For the CMS Pixel detector
Presentation transcript:

Toward the final design of a TPC for the ILD detector D-RD9 P. Colas, K. Fujii et al.

26/05/2014 Final Design of ILD TPC

D_RD9 Toward the final design of a TPC for the ILD detector 26/05/2014 D_RD9 Toward the final design of a TPC for the ILD detector From 2007 to March 2013, the feasability of a MPGD TPC for the LC was demonstrated in D_RD2 (Construction and tests of a MPGD TPC endplate prototype for the Linear Collider) ILD Detailed Baseline Document completed in March 2013 Started in April 2013 : New project D_RD9 In the new context (Higgs 125 GeV, realism of a ‘fast track’ scenario in Japan for the LC, gain also in realism in our TPC study Tackle engineering issues: electronics, cooling, software List remaining issues Final Design of ILD TPC

A Possible Schedule of ILC in Japan As presented in the 2013 ILD meeting in Cracow 26/05/2014 Final Design of ILD TPC

Events in the Large Prototype

Distortions from the Large Prototype

26/05/2014 Final Design of ILD TPC

300 W compressor purchased by KEK at Nikhef 26/05/2014 2-phase CO2 cooling Principle : CO2 has a much lower viscosity and a much larger latent heat than all usual refrigerants. The two phases (liquid and gas) can co-exist a room temperature (10-20°C at P=45-57 bar). Very small pipes suffice and hold high pressure with low charge loss. Results from a test at Nikhef 300 W compressor purchased by KEK at Nikhef Final Design of ILD TPC

26/05/2014 Final Design of ILD TPC

26/05/2014 Tests with 1 module were performed at Nikhef in December 2013, and tests with 7 modules at DESY in February 2014 2-phase CO2 cooling Final Design of ILD TPC

26/05/2014 Electronics The test electronics are not those to be used in the final ILD detector, for the following reasons: AFTER (T2K chip) not extrapolable to Switched Capacitor Array depths of 1 bunch train S-Altro 16 (ALICE-based) has to evolve : improve packing factor, lower power consumption, power pulsing from the beginning (probably 65nm) Present work within AIDA : Common Front End for Gas Detector Signal processor, 130 nm Final Design of ILD TPC

26/05/2014 Ion space charge Primary ions create distortions in the Electric field which result to O(<1µm) track distortions. 1 to 2 orders of magnitude safety margin with estimated BG. However ions flowing back from the amplification region produce a high density ion disk for each train crossing. This disk drifts slowly (1m/s) to the cathode, influencing electron drift of subsequent train crossings Final Design of ILD TPC

Distortions from backflowing ions 26/05/2014 Example for the case of 2 ion disks : 60 µm distortion for ‘feed-back fraction’ x ‘gain’ = 1 GATE NEEDED Distortions from backflowing ions

26/05/2014 Final Design of ILD TPC

Remaining R&D issues Ion backflow and ion gating 26/05/2014 Remaining R&D issues Ion backflow and ion gating Fully understand, mitigate and correct distortions Design a new electronics, at a pace adapted to the progress of the technology. Optimization of power consumption and power pulsing must be included in the design from the beginning. Carry out technical research for connections to many channels, precision mechanics for large devices, cooling, etc… Final Design of ILD TPC

Toward the Final Design of ILD TPC 26/05/2014 Toward the Final Design of ILD TPC The earliest timeline? 2014-15 R&D on ion gates and a decision on the ion gate: 2015-17 Beam tests of new LP modules with the gate 2017 Prioritization of the MPGD technology and module ILC LAB & ILD detector proposal 2017-19 Final design of the readout electronics for ILD TPC and its tests Design of ILD TPC 2018-19 TDR for the ILD tracking system: 2019-23 Prototyping and production: Electronics (chipsboards) Prototyping and production: Modules Production: Field cage/endplate and all others 2024-25 TPC integration and test 2026 TPC Installation into the ILD detector ILC commissioning Final Design of ILD TPC

26/05/2014 Conclusion The French-Japan R&D work within the LCTPC collaboration entered a new phase, more engineered and realist. It also allowed to identify a few points requiring active R&D to be pursued in the next few years Final Design of ILD TPC