Production Lot Management

Slides:



Advertisements
Similar presentations
SiteManager Materials Materials Certification. SiteManager Support System SSS Data Base Two Ways To Access Now Useful Information.
Advertisements

Commissioning needs K.Long. Machine start: Target ready to go Water leak: –In branch in trench serving D2, Q4 – Q6: Small leak exacerbated by header tank.
Company Forms, Records & Administrative Procedures Westwind Air Service.
EVD Preventative Maintenance & Inspections. EVD2 EVD Preventative Maintenance and Inspections  Apparatus Independent Records Accurate Hard Copy Ref.
Ditch Witch Training Cancun 2015 ELECTRONICS & PARTS.
How to use it to Reduce Life Cycle Costs
Customer calls into Call Centre Agent / Administrator verifies customer with CV-1 verification CV-1 verification successful? Yes No Customer walks into.
Inventory tag-out Biodiesel Process Overview Reactor Glycerin Isolated Shipment Lot Shipping sample/test Purchasing Inventory Production Sales Shipping.
Jarrod Asuncion Period 1 Brose. Simple Derivatives Sample 1 ◊^n = something to the “something” power n ∙ ◊^n-1 ∙ d◊ = multiply something by ‘n’ and the.
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200.
1. Zachary rolled a fair number cube twice. Find the probability of the number cube showing an odd number both times. 2. Larissa rolled a fair number cube.
Aviation Maintenance Management
By: Caleb Harris.  The main purpose of QA is to monitor programs to determine their effectiveness, and if they are ineffective, to implement appropriate.
2/25/ Start 2/25/ Round 1 PLAY Your performance improvement partner 2/25/2011www.mindwareincorporated.com.
Инвестиционный паспорт Муниципального образования «Целинский район»
Meeting Deliverables Update on talk with vendor – 5’ Review call flow process – 20 ‘ – Finalize hours issues and next steps – Work to finalize call flows.
Continuing Analysis and Surveillance System (CASS) 03/06/59 1 AIRCRAFT MAINTENANCE Section 10.
Implementing the Physical Activity Plan Module A: Lesson 3 Grade 12: Active, Healthy Lifestyles.
(x – 8) (x + 8) = 0 x – 8 = 0 x + 8 = x = 8 x = (x + 5) (x + 2) = 0 x + 5 = 0 x + 2 = x = - 5 x = - 2.
EVD Apparatus Maintenance. EVD2 EVD Apparatus Maintenance  Basic Systems Battery Braking Coolant Electrical Fuel Ref. Unit 5 LP 1 (Lesson 10) Hydraulic.
FACILITY NEW BUILD/UPGRADE LONG LEAD ITEMS Craig Lavender - HMNII.
2005 Best Practices. AmeriTek's Safety Kick-Off Meeting.
Inventory Flowcharts Page 6 By: Bereket Gebreselassie Vance Cable.
QC Deep Dive Presented by: CONNER HELTON Product Manager 11/10/2015.
Solve x 2 +3x – 5 = 11 xx2x2 +3x-5X 2 +3x-5High/ Low L.
Agenda Roger’s Customer Service Competitor Analysis Alternative Solutions Why xxx is the best solution |||||||||||||| PROBLEM IDENTIFICATION PROBLEM ANALYSIS.
LOG ON (USE WINDOWS). COLLECT YOUR EXERCISE BOOK.
Risks and Rewards of Remote Access Jef Gray VP of Information Technology Kissimmee Utility Authority.
Advances In Software Inspection
HubSpot’s Partner Portal. 1. See the leads you’ve registered to determine whether the lead is a duplicate of another lead in our system, and possibly.
February 2007 Commercial Vehicle Drivers Hours of Service Module 12: Special Permit – Research / Pilot Projects.
照片档案整理 一、照片档案的含义 二、照片档案的归档范围 三、 卷内照片的分类、组卷、排序与编号 四、填写照片档案说明 五、照片档案编目及封面、备考填写 六、数码照片整理方法 七、照片档案的保管与保护.
공무원연금관리공단 광주지부 공무원대부등 공적연금 연계제도 공무원연금관리공단 광주지부. 공적연금 연계제도 국민연금과 직역연금 ( 공무원 / 사학 / 군인 / 별정우체국 ) 간의 연계가 이루어지지 않고 있 어 공적연금의 사각지대가 발생해 노후생활안정 달성 미흡 연계제도 시행전.
Жюль Верн ( ). Я мальчиком мечтал, читая Жюля Верна, Что тени вымысла плоть обретут для нас; Что поплывет судно громадней «Грейт Истерна»; Что.
מאת: יעקב דדוש. פיסול –בין יחיד לרבים יחידה 1 לתלמיד המתבונן לפניך שתי יצירות פיסוליות. התבונן וכתוב (בשקופית הבאה) מהם ההבדלים בין הפסלים המוצגים לפניך?
6th Science Warm-up & Ticket Out 10/23/14 Agenda: (DO NOT write down) Warm-up **PLACE HOMEWORK IN CENTER OF TABLE** 1. Warm-up/Ticket out # 17 (pg 32)
QUALITY ASSURANCE MODULE 3. Definitions Quality Assurance - A process/effort that ensures that processes are followed, that the processes of doing right.
Documentation.

FACT2 Instructional Support Community College
Capturing Wastes & Issues
Personal not recording Ph records daily
Responding to a Ford Service Quality Rejection
GLAST Large Area Telescope:
Valero Memphis Refinery Quality Control Management System Links
עקרונות ניהול איכות דני חייט MSM.
Data Flow Diagramming Rules
STEM Fair: Formulating Questions
Applicants & Decision.
.., - I ':\ ' !' #
Partnership reference success story <partnership name>
First and last name D E P T O F L First and last name A B R Y M
System Inspection: Preparing the Final Report
Six Sigma/ Process Analysis*
Welcome to eHEPQUAL.
Order procurement Input: customer need Sales: identifies customer need
Stoke 100 Reads Reading log Name: Class:.
4 + (-5) = A. Start at zero B. Move ______ spaces ___________ to get to the first number. C. From there, move _____ spaces __________ D. My final answer.
Jeopardy - Factoring Review of Factoring.
One more Lection.
Project sample 1,000, , /2015 – 12/2017
Stoke Reads On Reading log Name: Class:.
C.2.10 Sample Questions.
C.2.8 Sample Questions.
C.2.8 Sample Questions.
Project sample 1,000, , /2015 – 12/2017
Paper Title ICES Paper 20XX-XXX
SIPOC Diagram --- Planning of Product Realization Process
Sample EuMW Poster The name of the speaker must be underlined
Valero Memphis Refinery Quality Control Management System Links
Presentation transcript:

Production Lot Management Production Authority Transfer to Production Lot TKxxx 30K FO 30-30-0100 Tank Lot Ticket FO 30-30-0000 Production Lot Ticket ProductionLot: LOT-yymm-xx FO 30-30-0240 Daily Priority FO 30-30-0100 Tank Lot Ticket TKxxx 30K FO 30-30-0100 Production Tank Ticket ProductionTK: TK-yymm-xxx TKxxx 30K Tank Samples FO 20-30-8000 COA FO 20-30-8400 Final Tank Sample & Inspect Checklist Shift Records FO 30-30-0210 Walk-thru Checklist FO 30-30-0300 Shift Lot Notes FO 30-30-0099 RIN Transfer FO 30-30-0220 DeltaV Checklist FO 50-30-0000 Transfer Ticket QA FO 20-30-8500 In-process Surveillance Tests FO 20-30-8010 QTA Surveillance FO 50-30-0000 Transfer Ticket 1 per Lot Ref Lot# FO 30-30-0230 Confined Space GO 1 per tank ref TK# FO 30-30-0400 Production Data Log NoGo CUSTOMER Form 30-88-4000_14a00 Rework