UTSA Capital Projects Update Facilities, Engineering & Projects

Slides:



Advertisements
Similar presentations
Farewell to Jennifer After three years with De Anza, we said goodbye to Jennifer who accepted a promotion to San Diego.
Advertisements

Avenida La Pata/Avenida Vista Hermosa Park and Development Study Land Use Charette MAY 15, 2004.
CAPITOL COMPLEX MULTIPLE PROJECT UPDATE. OBJECTIVES Overview of Scheduled Capitol Complex Projects Review of Various Projects Locations Scopes of Work.
J P LIVING AT CATALINA PHOENIX, ARIZONA Project Team DEVELOPER ARCHITECT ENGINEER John A. LiSanti, President Damon Leverett, AIA Rachid Dia, P. E. American.
ASPHALT & CONCRETE FOR INDOOR FACILITIES Presented by Tom DeRosa.
Campus Master Plan 2012 Update University Senate November 6,
Capital Improvement Plan May 8 th, 2013 Presented by City Administration: Public Works Department Finance Department.
UBC Athletics and Recreation – Facilities overview / Master planning.
75 Express Lanes Segment D Construction From South of Sheridan Street to North of Griffin Road Presentation to Ivanhoe Community August 27, 2014.
Classroom Addition Facility Planning funds to study a possible addition Enrollment Projections Increase capacity for 2300 students Program includes 19.
Capital Planning Task Force Update Interim Report November 18, 2003 THE UNIVERSITY OF TEXAS SYSTEM.
1 Manassas Park Town Meeting 29 October Welcome This is the first Manassas Park Town Meeting Governing Body implemented this as a way to improve.
Science Research Laboratories (formerly PSL and LSL) 23,111 GSF $24 million Total Project Cost (PUF and RFS) November 2010 Completion 1.
Infrastructure Improvements Dependable infrastructure for CSUCI campus… Dave Chakraborty Director, Planning, Design & Construction.
Alpha Borough Community Recreation Project Preliminary Design Presented by Group 3 February 28, 2002 From left to right: Pamela Vislocky, Erin O’Brien,
Tackle Engineering We Tackle the Tough Jobs Proposed Developments for New Park and Recreation Center in Alpha, NJ Presented to the Alpha Borough Council.
Arizona State University Student Services Projects DOWNTOWN | POLYTECHNIC | TEMPE | WEST MARCH 2012.
ACQUATICS FACILITY STUDY City of Vincennes Department of Parks & Recreation.
Overview of UTSA’s Discretionary Budget
General Faculty Meeting October 9, 2012 By: Dan King By: Dan King Assistant Vice President 1.
US 1 COLLEGE PARK – SEGMENT 1 FROM COLLEGE AVE/REGENTS DRIVE TO MD 193 (UNIVERSITY BLVD) Presentation to College Park City Council August 5,
2013 Bond Task Force Proposal Presentation & Proposal by Cory Baker Director Scottsdale Center for the Performing Arts 3 Vice President Scottsdale Cultural.
Grace Bible Church Ministry Goals & Master Plan Presentation.
Committed to providing safe, high quality water and related business services earning customer trust and confidence. Louisville Water Company Capital Program.
1 SHEFO New Trends in Capital Outlay August 16, 2002 Overview of the Demands on Capital for Construction and Facility Renewal at The University of Texas.
UF Research and Academic Center at Lake Nona Presentation to Florida Board of Governors, March 17, 2010 Dr. Win Phillips – Vice President for Research.
Mt. Lebanon Public Works Facility Master Planning March 11, 2014 Update.
Presented by: Servus Place – A Plan for the Future Report on Public Consultation and Revised Plans Diane Enger Director Servus Credit Union Place March.
March 2015 ALLEN INDEPENDENT SCHOOL DISTRICT School Board Meeting March 2015 Construction Update for the Service Center.
Facilities Update Capri Paul Ecke Central Ocean Knoll Olivenhain Pioneer La Costa Heights Park Dale Lane Encinitas Union School District October 12, 2004.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II CFAC Review Conventional Facilities Geotechnical Conditions Tom Joos Civil/Structural Engineer BNL Plant Engineering.
Chart A Pool Usage – Public Programs Before/After School 9/201310/201311/201312/20131/20142/20143/20144/20145/20146/2014 AM Laps
Space Use Overview November 2010 Council for the Built Environment Facilities Utilization Review Sub Council.
Planning Team Facility Owner Local CTA/Facility Users Parks and Recreation Facility Manager/Tennis Professionals Facility Maintenance Design Professionals.
Budget & Legislative Update Staff Senate August 5, 2015 Charles D. Leffler Vice Chancellor for Finance and Administration.
Judson Early College Academy Judson ISD - San Antonio, Texas High School New Construction PBK 2011 Exhibition of School Planning and Architecture.
Energy Huntsville Opportunity Report and Government Collaboration February 2016.
TRUMAN MIDDLE SCHOOL Presented by Counsilman ▪ Hunsaker Facility Audit.
Facility Committee June 17, Othello Community Pool Features: Leisure amenities: including a 2,800-square-foot leisure pool, lazy river and spray.
May 18, 2004 City Bond Election. MAY 2004 BOND ELECTION General Election May 18, 2004 Elections City Mayoral Election City Council Election City Bond.
Opsis Architecture | Ballard*King Opsis Architecture | Lango Hansen Hillsboro Community Center and Park Public Meeting 3.
Opsis Architecture | Ballard*King Opsis Architecture | Lango Hansen 53 rd Avenue Park / Community Center Public Meeting 2.
Title slide. Planning Process Where are we now? Where do we want to be? How do we get there? Action plan Park and Facility Inventory and Analysis Recommendations,
CII Annual Conference San Diego, California July 25-27, 2006 Committee Presentation Benchmarking & Metrics Committee Industry Demands Clear Measurements:
April 2016 Bond / Facilities Update Presentation
East Tennessee State University
Parks & Recreation 2016 Bond Referendum Project Information.
Bond Project Update September 2017
CITY COUNCIL STUDY SESSION:
Student Services Projects
January 18, 2017 City of San Diego
De Pere Aquatic Presentation
Equipment Maintenance Direct $pend Opportunity
Fun Facts: James M. Bennett High School
* 07/16/96 Site Development Plan * ##.
Southern Lehigh School District
Renovation and Expansion
MIRACOSTA COMMUNITY COLLEGE DISTRICT
BURROUGHS HIGH SCHOOL PROJECT STATUS REPORT February 2017 Fast Facts
CAPITAL PROGRAM OVERVIEW
Cornerstone Corporate
College West Residence Renewal Project
The Bond Street Wharf Baltimore, Maryland
Issaquah-Fall City Road
City of Pilot Point 2018 bond election
Brencal Contractors Inc.
February 14, 2019.
Master Facilities Committee Evaluation and Identification
Pre-K Classes in San Antonio | Pre-K San Antonio | Discovery World Learning Center
June 13, 2019.
Presentation transcript:

UTSA Capital Projects Update Facilities, Engineering & Projects Financial Area Representatives Meeting November 30, 2016 Paul Goodman, Assistant Vice President

Science and Engineering Building

Science and Engineering Building

Science and Engineering Building

Science and Engineering Building

Science and Engineering Building

Science and Engineering Building

Science and Engineering Building

Science and Engineering Building

Science and Engineering Building

Science and Engineering Building Cost Per Gross Square Foot Benchmarks Science and Engineering Building (with 7% Shell Space) $426 Science and Engineering Building (Estimated Total Finish-Out) $437 THECB Average for Laboratory, General $501 Low Quartile Median High Quartile Other U. T. System Projects $483 $527 $575 Other National Projects $536 $593 $781

Science and Engineering Building $95,000,000 Total Project Cost $70,000,000 TRB $10,000,000 PUF $10,000,000 Designated Funds $ 5,000,000 RFS Total Building Cost GSF Building Cost/GSF Science and Engineering Building $63,154,000 148,250 $426

UC Retama Renovation Upgrade seating and increase capacity Update finishes and lighting Upgrade technology Total Project Cost: $2 million

UC Retama Renovation

UC Retama Renovation

Recreation Center Pool Features: 8-lane 200,000-gallon lap pool, depths from 3’-6” to 9’-6” 60,000-gallon leisure pool, depth 3’-6” Crawl space with mud slab adjacent to and beneath both pools Relocated sand volleyball court New pool equipment and piping New pool chemical system Site drainage improvements New sidewalks, concrete flatwork, landscape, irrigation, & fire lanes Lead Consultant/Architect:  Marmon Mok Architecture, San Antonio, TX Aquatics Designer:  Aquatics Design Group, Carlsbad, CA Contractor:  Byrne Construction Services, San Antonio, TX Total Project Cost:  $6.5 million

Recreation Center Pool

Recreation Center Pool

Recreation Center Pool