UTSA Capital Projects Update Facilities, Engineering & Projects Financial Area Representatives Meeting November 30, 2016 Paul Goodman, Assistant Vice President
Science and Engineering Building
Science and Engineering Building
Science and Engineering Building
Science and Engineering Building
Science and Engineering Building
Science and Engineering Building
Science and Engineering Building
Science and Engineering Building
Science and Engineering Building
Science and Engineering Building Cost Per Gross Square Foot Benchmarks Science and Engineering Building (with 7% Shell Space) $426 Science and Engineering Building (Estimated Total Finish-Out) $437 THECB Average for Laboratory, General $501 Low Quartile Median High Quartile Other U. T. System Projects $483 $527 $575 Other National Projects $536 $593 $781
Science and Engineering Building $95,000,000 Total Project Cost $70,000,000 TRB $10,000,000 PUF $10,000,000 Designated Funds $ 5,000,000 RFS Total Building Cost GSF Building Cost/GSF Science and Engineering Building $63,154,000 148,250 $426
UC Retama Renovation Upgrade seating and increase capacity Update finishes and lighting Upgrade technology Total Project Cost: $2 million
UC Retama Renovation
UC Retama Renovation
Recreation Center Pool Features: 8-lane 200,000-gallon lap pool, depths from 3’-6” to 9’-6” 60,000-gallon leisure pool, depth 3’-6” Crawl space with mud slab adjacent to and beneath both pools Relocated sand volleyball court New pool equipment and piping New pool chemical system Site drainage improvements New sidewalks, concrete flatwork, landscape, irrigation, & fire lanes Lead Consultant/Architect: Marmon Mok Architecture, San Antonio, TX Aquatics Designer: Aquatics Design Group, Carlsbad, CA Contractor: Byrne Construction Services, San Antonio, TX Total Project Cost: $6.5 million