Advertisements

MICE Fiber Tracker Electronics AFEII for MICE (Front end readout board) Recall: AFEs mount on ether side of the VLPC cass, with fibers going to the VLPCs.
Status of MICE Tracker System H. Sakamoto, Osaka University (on behalf of the MICE Collaboration) International Muon Ionization Cooling Experiment (MICE)
First Results from Tracker 1  Cryostat Commissioning  AFE/VLSB Firmware and Readout  Cosmic Ray Setup  Tracker Readout  Software  Trigger Timing.
Workshop Goals MICE Controls and Monitoring Workshop September 25, 2006 A. Bross.
Tracker DAQ Makoto Yoshida (Osaka Univ.) MICE Frascati 2005/6/27.
MICE Tracker Readout Overview channel AFE II-t boards - 8 Visible Light Photon Counter (VLPC) cassettes - 4 cryostats.
1 VLPC system and Cosmic Ray test results M. Ellis Daresbury Tracker Meeting 30 th August 2005.
MICE CM15 June 2006Jean-Sébastien GraulichSlide 1 DAQ for BTF o BTF Overview o Hardware Overview o DAQ Software Description o What’s next o Summary Jean-Sebastien.
SciFi Tracker DAQ M. Yoshida (Osaka Univ.) MICE Tracker KEK Mar. 30, 2005.
MICE Tracker Front End Progress Tracker Data Readout Basics Progress in Increasing Fraction of Muons Tracker Can Record Determination of Recordable Muons.
1 MICE Tracker Readout Update, Preparation for Cosmic Ray Tests Introduction/Overview AFE-IIt firmware development VLSB firmware development Hardware progress.
Tracker Controls MICE Controls and Monitoring Workshop September 25, 2005 A. Bross.
2005/10/22 MICE CM at RAL, Tracker Parallel, Makoto Yoshida 1 KEK test beam - introduction - M. Yoshida MICE CM tracker parallel 2005/10/ /10/22.
M. Ellis - 11th February 2004 Sci Fi Cosmic Light Yield 2 views 3 views.
DAQ for KEK beam test M.Yoshida (Osaka Univ.). Components VLPC readout –Stand Alone Sequencer (SASeq) Slow < 100Hz –Buffering VLPC data with VME interface.
Tracker 2 Cryo &Electronics Update Linda Coney, UC Riverside Terry Hart, U Mississippi Ben Freemire, IIT Malcolm Ellis, Brunel University ADB MICE Collaboration.
DAQ WS03 Sept 2006Jean-Sébastien GraulichSlide 1 DDAQ Trigger o Reminder: DAQ Trigger vs Particle Trigger o DAQ Trigger o Particle Trigger 1) Possible.
MICE Workshop Sept 2004 AFEII for MICE Recall: AFEs mount on ether side of the VLPC cass, with fibers going to the VLPCs between them. AFE has 8 identical.
MICE Tracker Readout Increased Data Readout Rate VLSB Development 16 AFE II t boards 8 Visible Light Photon Counter (VLPC) cassettes 4 cryostats.
MICE Tracker Readout and Data Acquisition; Solenoid Magnetic Field Measurement Terry Hart for the MICE Collaboration, Illinois Institute of Technology,
VC MICO Report July 07Jean-Sébastien GraulichSlide 1 Main news  DAQ test bench running in Geneva 2 LDCs connected to 2 different PCs, 1 GDCs DAQ trigger.
Takashi Matsushita Imperial College T. Matsushita 1 Tracker Status.
1 MICE Tracker Update M. Ellis UKNFIC Meeting 25 th August 2005.
Imperial College Tracker Slow Control & Monitoring.
Status of NA62 straw electronics and services Peter LICHARD, Johan Morant, Vito PALLADINO.
Plans for the 2015 Run Vito Palladino Straw Working Group 2/2/2015.
MICE CM25 Nov 2009Jean-Sebastien GraulichSlide 1 Detector DAQ Issues o Achievements Since CM24 o Trigger o Event Building o Online Software o Front End.
1 Online Calibration of Calorimeter Mrinmoy Bhattacharjee SUNY, Stony Brook Thanks to: D. Schamberger, L. Groer, U. Bassler, B. Olivier, M. Thioye Institutions:
Overview of Tracker Interlocks Designed to protect tracker equipment, in particular the VLPC cassettes, from damage due to failure in part of the tracker.
S. Brambilla, “Recent DAQ integration test at L.N.L May 2008” 7 th AGATA Week, Uppsala, 8-11 July th AGATA Week Uppsala, 8-11 July 2008 Recent.
MICO July 07Jean-Sébastien GraulichSlide 1 Detector DAQ Status o Overview – Hardware status o Installation at RAL o DAQ workshop o Current Activities Jean-Sebastien.
Tracker Summary Alan Bross MICE CM October 10, 2007.
1 MICE Tracker Readout Update, Preparation for Cosmic Ray Tests Cosmic Ray Tests at RAL AFE-IIt Firmware Development VLSB Firmware Development Summary.
C. Combaret DIF_GDIF_MDIF_D ASU 6x 24 HR2 ASU USB Hub RPi USB2 DCC SDCC RPi USB 1 hub+Rpi for 4 cassettes 1 DCC for 8 cassettes (1 spare) Trigger.
Features of the new Alibava firmware: 1. Universal for laboratory use (readout of stand-alone detector via USB interface) and for the telescope readout.
Dec.11, 2008 ECL parallel session, Super B1 Results of the run with the new electronics A.Kuzmin, Yu.Usov, V.Shebalin, B.Shwartz 1.New electronics configuration.
John Coughlan Tracker Week October FED Status Production Status Acceptance Testing.
January 31, MICE DAQ MICE and ISIS Introduction MICE Detector Front End Electronics Software and MICE DAQ Architecture MICE Triggers Status and Schedule.
MICE Phase 1 Koji Yoshimura KEK June
DAQ Status for cosmic-ray test in RAL Hideyuki Sakamoto MICE Phone meeting 12 th July 2007 Contents Status Setup for cosmic-ray test bench Schedule.
1M. Ellis - 17th May 2007 SciFi Decoding (Everything you never wanted to know but couldn’t avoid going over and over)  VLSB Data (unpacking to AFE, MCM,
1Malcolm Ellis - Tracker Meeting - 28th November 2006 Electronics - Station Acceptance  Hardware: u 1 MICE cryostat with 1 VLPC cassette. u VME crate,
June 7, 2004Karen Dow CODA at Bates BLAST Data Acquisition.
CM20 Vassil Verguilov DAQ Software Status  DATE Readout  Data Decoding  Data Monitoring  Next steps  Summary.
1 MICE Tracker Readout Update AFE IIt firmware development VLSB firmware development Hardware progress Summary Terry Hart, MICE Tracker Meeting, August.
CM19 Vassil Verguilov DAQ Status  Progress  DAQ  Next steps  Summary.
1 MICE Tracker Readout Update Introduction/Overview TriP-t hardware tests AFE IIt firmware development VLSB firmware development Hardware progress Summary.
Tracker Cosmic Ray Test 2011 Linda R. Coney UC Riverside CM 29 - February 16, 2011.
Detector Summary Tracker. Well, as far as the tracker hardware is concerned, we are done. – Need to do the system test to make sure nothing has degraded.
16th May 2007 MICE tracker phone meeting 1 Setup test bench/ Installation DATE Hideyuki Sakamoto 16 th May 2007 MICE phone meeting.
MICE CM February 08Jean-Sébastien GraulichSlide 1 Report on DAQ & CAM o Detector DAQ Status Hardware Trigger Software o Controls and Monitoring (CAM) o.
Tracker Readout Progress Terry Hart, MICE Tracker Meeting, July 29, 2008 Cosmic Ray Readout with 1 st Tracker at RAL 2 nd Tracker Preparation at FNAL Firmware.
Station Acceptance Test. 22/02/2007 M. Takahashi 2 Lab Layout at IC.
1 DATE-based DAQ Hideyuki Sakamoto CM22, RAL 19/10/08.
Plans for the 2015 Run Michal Koval, Peter Lichard and Vito Palladino TDAQ Working Group 25/3/2015.
VC98 March 07Jean-Sébastien GraulichSlide 1 DDAQ Status o DAQ Software o Front-End and Trigger o What will happen soon o Schedule Milestones Jean-Sebastien.
Scalable Readout System Data Acquisition using LabVIEW Riccardo de Asmundis INFN Napoli [Certified LabVIEW Developer]
The ALICE Data-Acquisition Read-out Receiver Card C. Soós et al. (for the ALICE collaboration) LECC September 2004, Boston.
Tracker readout, DAQ, C&M and calibration
Vito Palladino Straw Working Group 23/3/2015
Iwaki System Readout Board User’s Guide
AFE II Status First board under test!!.
APV Readout Controllers DAQ
Preparation for Station Acceptance Test
DMA CONTROLLER 8257 Features: It is a 4-channel DMA.
University of California Los Angeles
Tracker Software Status
The CMS Tracking Readout and Front End Driver Testing
Multi Chip Module (MCM) The ALICE Silicon Pixel Detector (SPD)
Presentation transcript:

Hideyuki Sakamoto CM22, RAL 19/10/08 Tracker DAQ Hideyuki Sakamoto CM22, RAL 19/10/08

Tracker DAQ with EPICS By the last week, DAQ using DATE with EPICS has been checked to work correctly by the following procedures. Installation of DATE package Write test code Rebuild trigger logic Take data of C1-4 counters with DATE Check data Take data of C1-4 and 8 VLSBs Check data with that taken by EXCEL Replace code of AFE with EPICS one

R8 cosmic-ray test stand In R8, cosmic-ray test for Tracker#1 is running, and Tracker DAQ has been tested this time. Trigger counter (C3,4) Light-guides Light-guides Tracker#1 Cryo#1 Cryo#2 Lead block Trigger counter (C1,2)

AFEIIt (512 channels/board) Light-guides Light to VLPC LVDS To VLSB Clock from VLSB trigger board DATA FGPA D-FGPA A-FGPA ADC Tript preamp Signal VLPC array in bottom of cassette convert light to signal

VME modules a b c d e f SBS VME bus adaptor CAEN V977 I/O Register CAEN V792N QDC (16ch-lemo) MIL-1553 VLSB Trigger module VLSB module a b c d e f From AFEIIt From C1-4

DATE installation http://ph-dep-aid.web.cern.ch/ph-dep-aid/ Installed on 15thOct08 Installed

Notes on v6.28 Few codes were needed to fix to start readout process. Path to readout exe. file is changed as below. ${DATE_SITE}/hostname (@v6.09)  ${DATE_SITE}/aloneldc (@6.28)

List of equipments at cosmic-ray test Name Description Type D T #/pars. VME VME bus adapter 40 AFE AFEIIt boards 50 1 V977 CAEN I/O Register 60 2 V792N CAEN QDC (16ch-lemo) 70 VLSBSlave VLSB board 80 6 VLSBMaster VLSB trigger board/ VLSBSlave controller 90 10 Type : Number to identify the equipment D : GENDATA T : GENTRIGGER #/pars. : Number of parameters registered in MySQL

Responsibility of DATE and EPICS in Tracker DAQ Readout data from VLSB Enable/Disable trigger of VLSB Clear VLSB buffer EPICS Configure AFEIIt boards Enable/Disable trigger of AFE Read temp./heater values of cassette

GUIs for EPICS 2 1 3 4 5 1. EPICS server 2. RunControlUI 3. Logger 4. ConfigurationUI 5. AFEIItMonitor 1 2 3 4 5

Embedding EPICS code in DATE EPICS - wrapped with C++ DATE - written by C Compile equipmentList file by g++, then linked with other DATE object files to make readout exe. file. ~10 lines in “infoLogger.h” were changed as below. - extern void infoLog  extern “C” void inforLog #ifdef __cplusplus #endif __cplusplus

Start run ArmAFE() 1. Check if AFEIIt boards are configured If no, run stop, and User configures boards using EPICS ConfigurationUI. 2. Enabling trigger of AFE boards by EPICS

Event loop AFEIIt Coin. V977 I/O T560 VLSB Trig 2 3 4 6 MIL1553 1, 5 VETO Delay module TTL clock AFEIIt Coin. V977 I/O T560 VLSB Trig Triggger C1-4 2 3 4 LVDS 6 MIL1553 EventArrivedVLSBMaster 1, 5 VLSB 7 ReadEventVLSBSlave 1 Enable trigger of VLSB 2 Reset VETO 3 Wait until trigger is arrived 4 Check if trigger was accepted to AFE. If no, go back to 2 5 Disable trigger of VLSB 6 Enable monitoring  Read Temp/Heat of cassette  Disable monitoring 7 Read VLSB data  Clear VLSB buffer

Data taking Latest run(#323) is currently taking data, now it has 2k events. Trigger rate is about 0.016 Hz (1 event/min)

Decoding There 3 equipments to record data V792N: ADC of trigger counters (4 channels) AFE: Temp/Heater of 4 cassettes (32 channels) VLSBSlave: ADC/TDC of 8 VLSBs (4096 channels)

V792N (QDC) Data Format V792N 32bit data format: name #/words description data 16 Raw data (ch0 – ch15) V792N 32bit data format:

AFE Data Format name #/words description cassetteSize 1 #/cassettes (currently 4) tempSize #/temperatures (should be 8) temperature Temperature (9.0 etc.) heaterSize #/heater values (should be 8) heatervalue heatSize Heater value (100 etc.) …continue to the next cassette Note that, temperature is NOT integer. Use float (4 bytes) to read its value. Heater value is integer.

VLSB Data Format name #/words description trigSize 1 #/triggers (currently, 1) bank1Size #/data (180, etc..) bank1data VLSB 32bit data bank2Size bank2data bank3Size bank3data bank4Size bank4data …continue to the next trigger VLSB32bit data format: 31 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 Counter Status bits Data flag Pair1 Pair0 syncbit Chan/ADC/TDC Chan/ADC/TDC

C1-4 ADC distribution

Temperatures/Heater values of Cassettes Data unpacked from recorded data

VLPC ADC distribution

Summary Tracker DAQ based on DATE in combination with EPICS has been tested and checked to work correctly at R8 cosmic-ray test stand. Next step is to take data for Step II.