INTRODUCTION TO THE BRIDGE INSPECTION AND MAINTENANCE SYSTEM (BIM)

Slides:



Advertisements
Similar presentations
Best Practices for Bridge Management and Inspection
Advertisements

Managing Hardware and Software Assets
Understanding Capacity Building Assistance
IMPLEMENTING FINANCIAL AND ACCOUNTING SYSTEMS FOR GOVERNMENT CHRISTIAN T. SOTTIE THE CONTROLLER AND ACCOUNTANT-GENERAL GHANA.
Performance Framework Part 2 – Performance and Resource Management Multi Donor Trust Fund for Justice Sector Support in Serbia.
Global Congress Global Leadership Vision for Project Management.
Pertemuan 10 Cara mengelola Sumber Daya Teknologi secara baik Matakuliah: H0402/PENGELOLAAN SISTEM KOMPUTER Tahun: 2005 Versi: 1/0.
Idaho Transportation Department Karen A. Strauss, P.E. Pavement Management Engineer.
© Prentice Hall CHAPTER 14 Managing Technological Resources.
PAVEMENT MANAGEMENT SYSTEMS OVERVIEW Lecture 2. n Provide a historical perspective of the evolution of PMS over the last 20 years n Describe the basic.
Federal Transit Administration Office of Safety and Security FTA BUS SAFETY & SECURITY PROGRAM 18 th NATIONAL CONFERENCE ON RURAL PUBLIC AND INTERCITY.
Section 4 – Supplement Maintenance Management System (MMS) (WAC 136 – 11) Larry Pearson, Maintenance Programs Manager.
UNLV Data Governance Executive Sponsors Meeting Office of Institutional Analysis and Planning August 29, 2006.
1 I n t e g r i t y - S e r v i c e - E x c e l l e n c e The Air Emissions Inventory (AEI) Project: An Update on a Universal Schema Darren Carpenter,
Traffic Incident Management – a Strategic Focus Inspector Peter Baird National Adviser: Policy and Legislation: Road Policing.
Justice Information Network Strategic Plan Development Justice Information Network Board March 18, 2008 Mo West, JIN Program Manager.
Database Systems: Design, Implementation, and Management Tenth Edition
1 Ministry of Transport, Public Works and Water Management.
Introduction PMBOK® © Whizlabs.
MnDOT-ACEC Annual Conference March 5,  Capital planning and programming at MnDOT  Major considerations  A more transparent and collaborative.
Physical Building Audit Physical Building Audit By; Engr.Dr.Attaullah Shah PhD ( Civil) Engg, MSc Engg ( Strs), BSc Engg ( Gold Medalist),), MBA, MA (
Introduction to IT Governance Support System (ITGSS)
Implementing a Client Level Database Using CAREWare Across the System of Care 2008 Ryan White HIV/AIDS Program Grantee Meeting Presented by: Kevin McNeal.
Database Systems: Design, Implementation, and Management Ninth Edition Chapter 15 Database Administration and Security.
BIM Bridge Inspection and Maintenance Technical Standards Branch Class B Bridge Inspection Course Inspection Policies and Procedures INSPECTION POLICIES.
BIM Bridge Inspection and Maintenance Technical Standards Branch Class B Bridge Inspection Course Forms Completion Technical Standards Branch Class B Bridge.
Institutionalizing Drinking Water Security: Making the Issues Real for Small System Capacity Development Joy Barrett Rural Community Assistance Partnership.
Programme Performance Criteria. Regulatory Authority Objectives To identify criteria against which the status of each element of the regulatory programme.
Cargo Strategic Action Plan Prepared by: Cargo Strategic Action Group Air Carrier Maintenance Branch, AFS-330.
USACE Asset Management Risk and Reliability Workshop Condition Index Definitions Primer Allen C. Estes United States Military Academy.
BIM Bridge Inspection and Maintenance Technical Standards Branch Class B Bridge Inspection Course Bridge Maintenance and Inspection Responsibilities Technical.
Consultant Advance Research Team. Outline UNDERSTANDING M&E DATA NEEDS PEOPLE, PARTNERSHIP AND PLANNING 1.Organizational structures with HIV M&E functions.
There are 2 Types of Bridge Inspectors – Class B and Class A.
Why we need a rating system
BIM Bridge Inspection and Maintenance Technical Standards Branch Class B Bridge Inspection Course Bridge Inventory Information Technical Standards Branch.
The SQL Applications Documentation Tool for Dublin City Council.
Census Processing Baku Training Module.  Discuss:  Processing Strategies  Processing operations  Quality Assurance for processing  Technology Issues.
State of Georgia Release Management Training
LOADS 1.
Information Resource Stewardship A suggested approach for managing the critical information assets of the organization.
KING COUNTY BRIDGES AND ROADS TASK FORCE Roads Services Division Financial Review September 16, 2015.
BIM October-2014Dr. Walid Al-Awad 1 Building Information Modelling.
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Program Performance Criteria.
Towards a dependable and sustainable National IT Infrastructure MANAGING IT INFRASTRUCTURE ASSETS: IMPLEMENTATION NEEDS.
Road Investment Decision Framework
Trade Union Training on the Validation of the training manual entitled “Union Training on Occupational Safety and Health” OCCUPATIONAL SAFETY & HEALTH:
Transportation Asset Management PM Peer Exchange Performance Reporting and Target Setting (Section 2): VDOT’s Experience Connie Sorrell Chief of System.
1 The XMSF Profile Overlay to the FEDEP Dr. Katherine L. Morse, SAIC Mr. Robert Lutz, JHU APL
ODOT Culvert Inventory & Inspection Program. Ohio defines a bridge as any structure with span or diameter equal to or greater than 10 feet as measured.
Level II Inspection.
Inventory Information
Verifying and Updating Inventory Data
There are 2 Types of Bridge Inspectors – Class B and Class A.
39 - SPECIAL SESSION: Quality of International Statistics.
Inspector's Role and Responsibilities
INSPECTION POLICIES AND, PROCEDURES CLASS A CERTIFICATION REQUIREMNTS
Inspector's Role and Responsibilities
Software Requirements
Inspector's Role and Responsibilities
Inspection Form Completion
BRIDGE INVENTORY INFORMATION
Cluster, Multi-Site, and Multi-Level Evaluation Systems and Frameworks
UNLV Data Governance Executive Sponsors Meeting
INTRODUCTION TO THE BRIDGE INSPECTION AND MAINTENANCE SYSTEM (BIM)
Pryaska Veramoothea André Breytenbach
Key Stakeholders are aware of the Coalitions activities
Capital Improvement Plans
BRIDGE INVENTORY INFORMATION
National level Objective:
GIS-MO Project CRAB.
Presentation transcript:

INTRODUCTION TO THE BRIDGE INSPECTION AND MAINTENANCE SYSTEM (BIM)

BIM System Definition A comprehensive management system with the ability to process inspection and component information to support: Inspection management Maintenance programming Strategic planning Rehabilitation programs Replacement programs Budget development Page 1

BIM System Functions Ensures appropriate levels of safety and service. Maximizes life and utility of bridge structures. Assists service life prediction of bridge elements or structure types. Identifies need for continued monitoring. Provides a electronic system for managing inspection information and collecting and verifying inventory data. Provides data for setting priorities. Page 2

BIM System Functions (cont’d) Assists the allocation of resources. Provides information to develop maintenance costs (.i.e. materials, quantities). Facilitates information exchange with others. Provides a framework for training and evaluation of inspectors. Provides information for evaluating design, construction and maintenance standards. Page 3

BIM System Management Alberta Transportation uses a single Web Based knowledge system designed manage infrastructure assets known as the Transportation Infrastructure Management System (TIMS). Page 4

BIM System Management TIMS BIS Application (BIM) Inventory Inspection Maintenance The BIS component of the TIMS system consists of a central database repository containing information for all bridges in the province. Access to the system is web based and provides the ability to view and modify data by the users, depending on the security level assigned. TIMS - BIS Application Standard Bridge: BF 02397 Culvert: BF 77444 Page 5

Bridge Information System (BIS) TIMS BIS Application (BIM) Inventory Inspection Maintenance Page 6

Bridge Structure Categories Standard Bridges A bridge constructed using “standard” components and “standard” drawings. (except standard girder bridges with composite overlays, such as SMC, SCC, SLC) Culverts A bridge sized culvert is one with an equivalent diameter of 1500 mm or larger (or multiple smaller diameter culverts with equivalent hydraulic capacity – e.g. - 2-1200mm) Major Bridges All bridges which are not standard Also includes SLC bridges Sign Structures Overhead sign structures Page 7

BIM - Bridge Structure Statistics Page 8

Bridge Structures Statistics Number of Bridge Structures Built per Year by Road Type Page 9

BIM System – Critical Considerations The accuracy of the information contained within the BIM system directly impacts the effectiveness of the system. Consistency of inspection standards Inspection accuracy Inventory accuracy Maintenance accuracy The bridge inspector must adhere to the highest standard at all times. Page 10