CR184 (Quintette Road) Bridge #480045

Slides:



Advertisements
Similar presentations
Public Meeting Presentation March 15, Project Location Project Purpose –Traffic reliever to I-95 –Integrate road with the Northwest Sector Plan.
Advertisements

City of Omak Central Avenue Bridge Replacement Project Prepared by Highlands Associates Photos by FlyBy Photos.
Titusville to Edgewater Bike Loop PD&E Study
Northwest Florida Transportation Corridor Authority.
Tysons 1 Operational Analysis of Dulles Toll Road Ramps to Tysons Board Transportation Committee Meeting September 17, 2013 Seyed Nabavi Fairfax County.
State of Florida Department of Transportation SR 7 (US 441) Value Engineering Study September 24-28, 2001 Segment III - From North of Hollywood Blvd to.
Board of County Commissioners November 8, Recommendation Project Background and Location Traffic Analysis Comparison of Alternatives Public Meeting.
Space Coast Loop Trail - Brevard County
AASHTO Sub Committee Internal and External Audit Todd Long, P.E. August 10 th, 2014.
Congressional District Projects New CD-1 Central Park Blvd/I-70 — $47.2 million project funded through the American Recovery and Reinvestment Act (ARRA).
TRANSPORTATION ALTERNATIVES PROGRAM FY 2016 Project Priorities.
Functional Classification Maranda Obray, Transportation Planner Idaho Transportation Department.
NE 203 rd Street & NE 215 th Street Intersection Improvements between US 1 & West Dixie Highway Florida Department of TRANSPORTATION Upcoming Project Development.
Polk Transportation Planning Organization 2035 Mobility Vision Plan June 2010 Steering Committee - January 28, 2010 Polk Transportation Planning Organization.
Public Comment Mobility Vision Plan 2035 MVP Website 2035 MVP Brochure and Survey. Provides specific information on the Plan Update. Survey – your opinion.
SR 997 / KROME AVENUE Florida Department of Transportation April 27th, 2006 South Miami-Dade Watershed Study Advisory Committee.
Special STP Application Cycle for SFY 2016 Projects ICC and Executive Committee Meetings September 2015.
Freight Advisory Committee May 13th, 2013 Ashley Probart Deputy Director Freight Mobility Strategic Investment Board At-Grade Rail Crossings.
ALACHUA COUNTY TRANSPORTATION PRIORITIES FOR FLORIDA DEPARTMENT OF TRANSPORTATION WORK PROGRAM Fiscal Year 2011/12 – 2015/16 Presentation to Board of County.
ALACHUA COUNTY TRANSPORTATION PRIORITIES FOR FLORIDA DEPARTMENT OF TRANSPORTATION WORK PROGRAM Fiscal Year 2010/11 – 2014/15 Presentation to Board of County.
Palm Beach MPO Draft Complete Streets Policy Palm Beach MPO Draft Complete Streets Policy Advisory Committees September
Welcome March 20th 2009 Roads 101 GCMPC Presentation By Derek Bradshaw.
Bay County’s Intelligent Transportation System (ITS) Keith C. Bryant, P.E., PTOE Public Works Director Bay County, FL 2015 TRANSPORTATION SYMPOSIUM November.
MANATEE COUNTY TRAFFIC SIGNAL RETIMING Orange Blossom Trail (SR 500/US 441) from Oak Ridge Road to I-4 FPID Design Phase Public Information.
Titusville to Edgewater Bike Loop PD&E Study FDOT Project Number: Volusia County, Florida FDOT Project Number: Brevard County,
2040 LONG RANGE PLAN UPDATE 2040 LRTP Update – Needs Plan Development October 6, 2015 City of Lynn Haven.
Draft Congestion Management Process Plan October 7, 2015.
Financial Resources Overview February 11, Outlook 2040 LRTP Update Goals & ObjectivesNeedsAssessment DataForecastsFinancialResources CostFeasiblePlan.
BLACKWATER HERITAGE STATE TRAIL By Vernon Compton November 13, 2015 Emerald Coast Transportation Symposium.
Think Globally, Act Locally August 19, Introduction Why freight is important to central Ohio Global implications and impacts Highway system challenges.
How a Project Becomes a Project Michelle Ellias DOT SW Region Programming Engineer DNR/DOT Meeting December 4, 2012.
Federal Project No. BRLO 5951 (151) Bonita School Road Bridge Replacement September XX, 2013 Applicant: Santa Barbara County Public Works Transportation.
MED SR 18 Corridor Project MED PID October 13, 2015.
ALACHUA COUNTY TRANSPORTATION PRIORITIES FOR FLORIDA DEPARTMENT OF TRANSPORTATION WORK PROGRAM Fiscal Year 2013/14 – 2017/18 Presentation to Board of County.
ALACHUA COUNTY TRANSPORTATION PRIORITIES FOR FLORIDA DEPARTMENT OF TRANSPORTATION WORK PROGRAM Fiscal Year 2015 – 2019 Presentation to Board of County.
Visit Our Website at: Click to edit Master title style.
S.R. 520 (West Merritt Island Causeway) SR 520 (West Merritt Island Causeway) From West of Myrtice Avenue to S.R. 3 Courtenay Parkway FPID
Project Development and Environmental Study (PD&E) S.R. 30 (U.S.) 98 Gregory Street and Bayfront Parkway at 17 th Avenue Intersection Project Development.
POINCIANA PARKWAY TPO BOARD MEETING APRIL 12, 2012.
County Road 19(Manning Road) & County Road 22 Improvements Environmental Study/ Preliminary Design Report November 2008.
Alternative Alignments Public Meeting
Congestion Management Process / Performance Measures Report
Evaluation of Hard Shoulder vs
S.R. 30A / U.S. 98 / Panama City Beach Parkway
Central Polk Parkway PD&E Study
Intelligent Transportation Systems
U.S. 98 (State RoaD 30) Project Development & Environment (PD&E) Study
2010 Regional Intelligent Transportation Systems Plan: 2017 Progress Report on Implementation The Florida-Alabama, Okaloosa-Walton, and Bay County Transportation.
PROJECT LOCATION Project begins at Garden Lane (East of I-4)
Scoping for Performance-Based Solutions; CR E2 ACEC Conference March 5, 2012 Tom O’Keefe Metro District Program Delivery.
SR 60/Kennedy Boulevard and Jackson Street Resurfacing Projects
Florida Department of Transportation
Metropolitan Planning Organization
CR295A (Old Corry Field Road) Bridge #484092
SANDY SPRINGS CITY COUNCIL MEETING
Mr. Greg Slater, Administrator
2040 Deficiency Analysis Overview February 11, 2015
District Three Approach
Bi-County Parkway Evaluation of Impacts on Fairfax County Roads
Update on Kings Highway Corridor
September 25, 2018 District 5 SUN Trail Update
TRANSPORTATION SUMMIT
Heart of Florida Loop East Section
Stockton City Council December 6, 2007 Land Use Diagram Changes
MPO Board Presentation
Church Road Community Meeting
2045 LRTP Overview United Way of St Johns County May 10, 2019.
2045 LRTP Overview North District Citizens Planning Advisory Committee.
Public Workshop September 26, 2019.
West Cervantes Traffic Feasibility Study Jill Lavender, Transportation Planner Cory Wilkinson, AICP CEP, Project Manager Mary Morgan, PE, Engineer.
Presentation transcript:

CR184 (Quintette Road) Bridge #480045 Florida-Alabama Transportation Planning Organization   Board Chambers Santa Rosa County Commission 6495 Caroline St Milton, FL 32570 September 7, 2016 9:00 a.m.

Quintette Road Bridge – 0.56 miles

CR 184 (Quintette Road) Two-way, two-lane, minor collector ; 11.3 miles Intersects @ US29 in Escambia; 2.33 miles north of Muscogee Road and 2.1 miles south of Barrineau Park Road Intersects @ CR197A in Santa Rosa; 3.7 miles north of US90 and 620’ south of Berryhill Road Serves as major thoroughfare between Escambia and Santa Rosa Counties 7,600 Daily Traffic – 2015 502 Daily Freight Traffic – 2015 8,533 Daily Traffic – 2024

Quintette Road Bridge Concerns Bridge constructed in 1957 Classified Structurally Deficient (SD) by FDOT based on a substructure rating of 4. Held several discussions concerning the SD rating with FDOT staff about replacement and possible funding opportunities FDOT construction cost estimate is approx. $30 million Quintette Road was the only east-west connection between Escambia and Santa Rosa counties south of SR 4 following Hurricane Ivan (served as National Defense and Commerce Corridor) Major link for emergency mobilization SR4 (25 miles), US90 (14 miles), I-10 (18 miles) alternate routes, if bridge were closed Possible future Highway of Commerce as a component of the Escambia-Santa Rosa Beltway

Bridge concerns continued Serves as the major connector between the two counties  growth areas including the Midwest Sector Plan area in Escambia and the Five Points area in Santa Rosa County. Concern of having to post weight limits County Bridge with the main funding for replacement from limited County resources State-Federal Bridge Replacement program presently funded at $15 million statewide with max per project is $3,750,000. FDOT Off-System Bridge Replacement Policy – 25% Local Match Seeking TPO support for FDOT Bridge Replacement Funding and Prioritization

Questions David Forte, Division Manager Transportation & Traffic Operations Division Public Works Department Escambia County, Florida Shawn Ward, AICP, Long Range Planning Manager Development Services Department Santa Rosa County, Florida