Cooling Update (27 March 2014)

Slides:



Advertisements
Similar presentations
Recap of heat loads and peak doses from HL-LHC Q1 to Q7 L.S. Esposito, F. Cerutti HL-LHC WP3 meeting, 22 May 2014.
Advertisements

D1 and MCBXC pressurized superfluid helium channels sizing for heat extraction Rob van Weelderen
24/01/08Energy deposition, LIUWG, Elena Wildner1 Upgrade phase 1: Energy deposition in the triplet Elena Wildner Francesco Cerutti Marco Mauri.
Neutrino Factory Mercury Flow Loop V. Graves C. Caldwell IDS-NF Videoconference March 9, 2010.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
LARP LQX and MQX Magnets Cryogenic Testing at Fermilab’s Industrial Building 1 Roger Rabehl Technical Division/Test & Instrumentation Department.
E. Todesco PROPOSAL OF APERTURE FOR THE INNER TRIPLET E. Todesco CERN, Geneva Switzerland With relevant inputs from colleagues F. Cerutti, S. Fartoukh,
MQXF Cold-mass Assembly and Cryostating H. Prin, D. Duarte Ramos, P. Ferracin, P. Fessia 4 th Joint HiLumi LHC-LARP Annual Meeting November 17-21, 2014.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
September 19/20, 2007 SIS 100 Magnet cooling and cryogenic distribution.
1 Hi-Lumi WP3 meeting Update on the Q1 to D1 cryostat Jan 28, 2014  Outline  Cryostat cross section options  Elliptical interconnect.
20to2T5m100cm Images Van Graves February 13, 2014.
Peter Spiller, COLMAT-Kick off meeting, Cryo-Collimator, CERN, COLMAT Kick-off meeting CERN Peter Spiller Cryo-Collimator (Catcher) for.
S. Claudet - 31st May 2007Power refrigeration for LHC Power refrigeration at 4.5K & 1.8K for the LHC S. Claudet, CERN AT-ACR.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
Cooling and thermal analysis HL-LHC/LARP International Review of the Inner Triples Quadrupoles (MQXF) Design: dec 2014 / CERN R. van Weelderen, G.
R. van Weelderen, LIUWG, IT upgrade phase I: Status of cryogenic scheme evolution (in work) Outline - Old & new layout - Design constraints.
4/27/06 1 US LHC ACCELERATOR RESEARCH PROGRAM brookhaven - fermilab – berkeley - slac US LARP Inner Triplet Cryogenics and Heat Transfer LARP Collaboration.
Heat loads and cryogenics L.Tavian, D. Delikaris CERN, Cryogenics Group, Technology Department Accelerators & Technology Sector Friday, October 15, 20101HE-LHC'10.
FCC Week 2015, Washington Cooling the FCC beam screens
The integration of 420 m detectors into the LHC
AT-VAC SPC Nicolaas KOS Beam Screens for Inner Triplet Magnets LHC Upgrade Phase 1 Nicolaas KOS  LHC Upgrade phase 1  Inner triplet BS Requirements.
Cryogenic scheme, pipes and valves dimensions U.Wagner CERN TE-CRG.
SPL cryomodule specification meeting, CERN 19th October 2010 SPL cryomodule specification: Goals of the meeting SPL cryomodule specification: Goals of.
E. Todesco LAYOUT FOR INTERACTION REGIONS IN HI LUMI LHC E. Todesco CERN, Geneva Switzerland Acknowledgements: B. Dalena, M. Giovannozzi, R. De Maria,
E. Todesco HL LHC LAYOUT FROM Interaction POINT TO SEPARATION DIPOLE E. Todesco CERN, Geneva Switzerland Acknowledgements: B. Dalena, M. Giovannozzi, R.
Crab cavities – cryogenics for SPS and LHC LHC-CC13, 6 th LHC Crab Cavity Workshop – CERN, Geneva, Switzerland 9-11 December 2013 K. Brodzinski on behalf.
Specific QXF cold- mass requirements to ensure a robust cooling by superfluid helium 4th Joint HiLumi LHC-LARP Annual Meeting: R. van Weelderen,
8/29/07K. C. Wu - Brookhaven National Lab1 Major Components in ILC IR Hall Interchangeable Detectors.
LHC Machine Advisory Committee Meeting no.19 QRL status 16 June 2006 G. Riddone, AT-ACR On behalf of the QRL team.
Cryogenics for SuperB IR Magnets J. G. Weisend II SLAC National Accelerator Lab.
Logo area HL LHC IT STRING M. Bajko CERN TE-TM and QXF Review.
Bruno Vullierme Sept LHC-CC09 - 3rd LHC Crab Cavity Workshop Slide 1 CRAB CAVITY INTEGRATION CRYOGENICS INSTALLATION.
ILC : Type IV Cryomodule Design Meeting Main cryogenic issues, L. Tavian, AT-ACR C ryostat issues, V.Parma, AT-CRI CERN, January 2006.
CERN, 11th November 2011 Hi-lumi meeting
SIS 100 Vacuum chamber Recooler String system Components
Magnet cryogenic system update.
D. Ramos, H. Prin, M. Moretti, C. Eymin, A. Temporal, V. Parma, S
Hervé Allain, R. van Weelderen (CERN)
Hervé Allain, R. van Weelderen (CERN)
HL-LHC IT STRING and Series test of SC link
SLHC –PP WP6 LHC IR Upgrade - Phase I.
Status of triplet cryostat and magnet support scheme
Hervé Allain, R. van Weelderen (CERN)
Proximity Cryogenics P&IDs meeting
A. Vande Craen, C. Eymin, M. Moretti, D. Ramos CERN
FCC Week 2017, Berlin Towards a conceptual design for FCC cryogenics
Status of cryostat integration and conceptual design
SPS cryogenic proximity equipment and SM18 validation
Cedric Garion, TE-VSC-DLM, WP12
Hervé Allain, R. van Weelderen (CERN)
Superconducting Links and Cold Powering components for HL-LHC
How does a cryogenic system cope with e-cloud induced heat load
DEBRIS IMPACT IN THE TAS-TRIPLET-D1 REGION
WP3 meeting Aug 21, 2015 V1.1 RECAP Francesco Cerutti.
Cooling Update (25 February 2014)
Generic Cryo HX Options
Cooling aspects for Nb3Sn Inner Triplet quadrupoles and D1
IT & D1 HeII cooling-variants
Update on beam screen issues
Upgrade phase 1: Energy deposition in the triplet
Cooling aspects for Nb3Sn Inner Triplet quadrupoles and D1
PROPOSAL OF APERTURE FOR THE INNER TRIPLET
Revised estimates of heat loads and radiation damage in the IT and D1
Cryostats Some ideas for the new Q1 to Q3 Hi-Lumi WP3 meeting
Cooling Update (27 March 2014)
Beam Screens Cooling Update (1st Oktober 2014)
Status of QQXF cryostat
Cryogenic management of the LHC Run 2 dynamic heat loads
Presentation transcript:

Cooling Update (27 March 2014) Rob van Weelderen, Cryogenic Group, Technology Department, CERN

Overview Fluka Heat Loads + Explicit Design Margins 1.9 K Heat load limits for IT with – double HX in Q1 to Q3 + intermediate pumping 1.9 K Heat load limits for D1 – CP with –single HX and with/without intermediate pumping Beamscreen cooling

Placing of cryo-equipment considered (variant 4) Additional low pressure pumping ? actively cooled: 2 x HX actively cooled: 1 x HX ? Phase-separator & Piping entries/exits Phase-separator & Piping entries/exits QRL-jumper SM & QRL-jumper Phase-separator Piping entries/exits Q1,Q2a,Q2b,Q3: actively cooled for about 41 m, double-HXs needed CP,D1 : actively cooled for about 16 m, single-HXs desired

D1 & IT: Fluka heat loads However these values have to be augmented due to additional loads  Courtesy L. S. ESPOSITO

D1 & IT: Fluka + additional heat loads Heat Loads (W) 50 cm gap in ICs 50 cm gap in ICs3 Magnet cold mass Beam screen Q1A + Q1B 110 150 Q2A + orbit corr. 105 50 Q2B + orbit corr. 130 70 Q3A + Q3B 160 60 CP 45 D1 (160 mm) 100 Interconnects 25 85 beam-screen contact load 27 -27 static heat load cryostat ends 16 electron cloud image currents ? Total 771 633 Q1-Q2A ~ 247 W, Q2B-Q1B ~ 322 W, D1+CP ~ 202 W, Beam screens ~ 633 W Image currents 0.5 W/m on BS (tbc) What will be our design choice? Propose + 20 % margin: ~ 925 W at 1.9 K, ~ 759 W at BS beam-screen contact load 0.5 W/m static heat load cryostat ends 16 W electron cloud 150 image currents ?

Minimal need (569 W) Practical T-regulation limit, (800 W) Hard limit, HX overflowing (1000 W)

D1 + CP (~14.9 m long) needed 202 W without contingency "Power (W)" "Double HX ID (mm)" "single HX ID (mm)" 50 24 32 100 44 150 38 53 200 61 250 49 300 350 57 400 - Limited by vapour velocity (green is ok) - No good regulation possible/HX-area (red, forbidden) Using a full length double HX: 250 W at 2x49 mm ID, 2x58 mm Yoke-holes Using a full length single HX : 125 W at 1x49 mm ID, 1x58 mm Yoke-hole Not enough! "Power (W), 6m 1HX" "single 6m long HX ID (mm)" 40 35 45 50 55 60 65 70 75 - Intermediate pumping between CP and D1 and with single HX, limited by HX-area