IT PROJECTS (UNDER CAO/FOIS) FIRST QUARTER REVIEW ******** PROGRESS AND CONCERNS.

Slides:



Advertisements
Similar presentations
Transportation Funding Alternatives and Outreach
Advertisements

Symantec 2010 Windows 7 Migration Global Results.
BEST PROCUREMENT PRACTICES ON INDIAN RAILWAYS BY M. P. JUNEJA ADDL
A 2030 framework for climate and energy policies Marten Westrup
1 Nia Sutton Becta Total Cost of Ownership of ICT in schools.
Jarvis plc 2007 Half Year Results Presentation 27 November 2007.
Electricity and Natural Gas Supply, Reserves, and Resource Adequacy CMTA Energy Conference Energy: Growing Californias Economy William J. Keese California.
Negotiating the Internet: Equipment and Beyond David Bankowski IT Manager, Electronic Communications 25 July 2008 Insert graphic.
1 OAS Financial Management Challenges and Program- Budget Implications 1 SECRETARIAT FOR ADMINISTRATION AND FINANCE October 2008.
Quality Education Investment Act of 2006 (QEIA) 1 Quality Education Investment Act (QEIA) of 2006 County Superintendents Oversight and Technical Assistance.
The USAID/Egypt-funded Administration of Justice Support Project: A Status Report World Bank December 2, 2008.
Eileen T. Powell coreFLS Project Director Department of Veterans Affairs Washington, DC Presentation for Secretary of Veterans.
Performance of Hedges & Long Futures Positions in CBOT Corn Goodland, Kansas March 2, 2009 Daniel OBrien, Extension Ag Economist K-State Research and Extension.
China-EU Customs Cooperation: History, Implications and Outlook By Mr. ZHU Gaozhang Director General of International Cooperation, GACC September 1 st,
What is valorisation ? Growth €
European Union Cohesion Policy
NexSAT NexSAT Steering Group Meeting - 8 June 2004 © 2004 European Organisation for the Safety of Air Navigation (EUROCONTROL) 1 Welcome to the 4th meeting.
HISPC-Illinois II The Public-Private Partnership Moves Forward on Privacy and Security.
1 Child Care Resource and Referral (CCR&R): FY 13 Contract Renewal Proposal Summary Presentation January 2012.
Adopted Budget Oakland Unified School District Javetta Robinson, CFO Terrie Williams, Executive Officer of Finance Board of Education Meeting.
KIPO’s Policies on IP Marketplace Choongjae Lee Intellectual Property Promotion Division KIPO (Korean Intellectual Property Office)
ECLAC Regional seminar to strengthen the use of administrative records to measure violence against women Port-of-Spain, Trinidad and Tobago 30 th November-1.
1 Implementing Internet Web Sites in Counseling and Career Development James P. Sampson, Jr. Florida State University Copyright 2003 by James P. Sampson,
Jeremy Siviter, IBI Group, Project Manager May 18th, 2011
WMS – Warehouse Management Systems
1 CIFTlab1.2 Software for Clinical Diagnostic Laboratories 1.
SAS 70 Third Party Report on Controls Overview and Timetable Finance / Audit Committee Meeting Austin, Texas January 14, 2003/ February 18, 2003.
Bangladesh European Union Capacity Building for Effective Response Management System Through e-Learning Options A SDC supported project Comprehensive Disaster.
The NASA Shared Services Center (NSSC) November 2007 National Aeronautics and Space Administration
September 2011 Supportability : The Difference between Profit and Loss in the Rail Industry Keith Jordan – Hitachi Rail Europe.
Technology Planning Requirements in Texas and the NISD Technology Plan Kelly Smith, Assistant Superintendent for Technology Services Diana Goering,
© 2008 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice Better business outcomes equal better.
GENERAL SERVICES DEPARTMENT State Purchasing Division SHARE e-Procurement Enhancement Project Certification-Implementation Phase April 22, 2009.
Department of Information Technology John F. Simms Bldg. Security Upgrade Implementation Certification Project Sponsor, Andrew Griego Project Manager,
July 31, Disclaimer: TREx under development, minor modifications may occur pending final release. Prepared for Education Service Center TREx Training.
How to commence the IT Modernization Process?
Investing in the Cascading Forecasting Process in Modernizing National Meteorological and Hydrological Services WB & WMO.
1 Functional Strategy – IS & IT Geoff Leese November 2006, revised July 2007, September 2008, August 2009.
Development of Assistive Technology role at the University of Strathclyde Chris McKenzie Assistive Technology Adviser
15 May 2006Collaboration Board GridPP3 Planning Executive Summary Steve Lloyd.
Annual Industry Accounts Overview George Smith & Nicole Mayerhauser Current Industry Analysis Division Bureau of Economic Analysis Industry Accounts Users’
1 Phase III: Planning Action Developing Improvement Plans.
NIMT at a Glance National Institute of Metrology (Thailand)
Employment Ontario Literacy and Basic Skills Performance Management Reports Training For Service Providers.
CARICOM. Ninth EDF Project Caribbean Integration Support Programme (CISP ) Statistics Component 34th MEETING OF THE STANDING COMMITTEE OF CARIBBEAN STATISTICIANS.
ESTIMATES Mrs.Nirupma Kumar Prof. Fin & Investment.
M ERP (Enterprise Resources Planning) M ERP (Enterprise Resources Planning) Session 9 - ERP Implementation Ir. Ekananta Manalif, MM, MKom (D2664)
Managing the Information Technology Resource Jerry N. Luftman
Chapter 10 Managing the Delivery of Information Services.
1 Disaster Recovery Planning & Cross-Border Backup of Data among AMEDA Members Vipin Mahabirsingh Managing Director, CDS Mauritius For Workgroup on Cross-Border.
CREW MANAGEMENT SYSTEM
1 Freight Operations Information System COM/CCM’s Conference
IT Projects with CAO/FOIS
October 24, 2000Milestones, Funding of USCMS S&C Matthias Kasemann1 US CMS Software and Computing Milestones and Funding Profiles Matthias Kasemann Fermilab.
" Ensuring Services, Empowering People “ Bihar Right To Public Services Act, Sandip Shekhar Priadarshi Admimistrative Officer BPSM General Administrative.
IT Applications in Freight business B.V.L.Narayana RSC/BRC.
1 REVIEW OF RAPDRP PART A PROGRESS IN KARNATAKA Aug 2015 RESTRUCTURED ACCELERATED POWER DEVELOPMENT AND REFORMS PROGRAMME (R-APDRP)
TRAIN MANAGEMENT SYSTEM ON MUMBAI SUBURBAN SECTION OF CENTRAL RAILWAY
Tom MAZOUR IAEA, Division of Nuclear Power
T r a n s p a r e n t f a s t r e l i a b l e
An Introduction to World Bank Organization and Operations Jean-Charles Crochet Senior Transport Economist World Bank.
1 IT PROJECTS (UNDER CAO/FOIS) PROGRESS AND CONCERNS AUGUST 2006.
BENEFITS ACCRUED ON IMPLEMENTATION OF E-PROCUREMENT SYSTEM.
Illinois Century Network Illinois Broadband Opportunity Partnership – East Central Project.
BNL Tier 1 Service Planning & Monitoring Bruce G. Gibbard GDB 5-6 August 2006.
Portfolio Committee on Appropriations Quarter 1 Expenditure and Performance 24 August 2012 The Presidency Department of Performance Monitoring and Evaluation.
Solar PV Tender Overview Ministry of Livestock, Fisheries and Rural Development Department of Rural Development Place - Sule Shangri-La Hotel Date- 4 -
Managing the Delivery of Information Services
M ERP (Enterprise Resources Planning)
INFORMATION SYSTEMS PLAN
Presentation transcript:

IT PROJECTS (UNDER CAO/FOIS) FIRST QUARTER REVIEW ******** PROGRESS AND CONCERNS

APPROACH 1. PRESENT PROJECT SPECIFIC DETAILS WITH AREAS REQUIRING BOARD’S INTERVENTION 2. SHARE OUR VISION ON GENERAL ISSUES- INFRASTRUCTURE,TRAINING AND INSTITUTIONALISION

IMPORTANT PROJECTS 1.FOIS 2.COA 3.ICMS 4.CMS

GENERAL ISSUES V-SAT EXPANSION INFRASTRUTURE -BLDGS TRAINING SETTING UP OF CONTROLS

ISSUES-FOIS V-SAT INSTALLATION AT 203 TMS SITES EQUIPMENTS AVAILABILITY RAILWAY’S INVOLVEMENT CHANGED TRAFFIC PATTERN

FOIS TMS Module 524* locations on IR 212 locations on VSAT 324 locations online covering 376 sites 126 locations printing RR online covering 176 sites Around 1100 PCs and 400 printers supplied so far 668 PCs and 612 printers under supply *(3 locations of SR – 1 as P2, 1 closed, 1 HOM port location didn’t commission at all.)

TMS VSAT locations 212 TMS locations have to be commissioned on VSATs by IRPMU Railway Board’s target was June IRPMU’s revised target is Sept VSATs have been installed upto of these were commissioned upto June 2006 The target for July 2006 is for commissioning 64 locations on VSAT Target for 118 (64+53) locations is 15 th Aug locations have been commissioned upto

IMPACT ON TARGET- FOIS V-SAT DEPENDENT TMS SITES(212) WILL TAKE LONGER TO STABLISE RESPONSE TIME ISSUES (1500 vs700 msecs) CHANGE IN HUB FROM VENDOR’S TO OUR OWN (Realignment of each dish)

DECISION/ASSITANCE- FOIS Nomination of 2 Rates Inspectors by each zone to CAO/FOIS for verification of referential database and testing of software changes due to rates circulars Board’s directive for AT/generator supply from station to TMS site

STATUS-COA Pilot project under trial at Madurai and Trivandrum divisions of SR DOMs/SrDOMs visiting TVC/MDU and their reports being sent to CRIS continuously for necessary changes/enhancements Tender for customization of software for IR under finalization in CRIS. Tender for hardware and roll out to 23 divisions also under finalization in CRIS (Phase I) Strategy for roll out – In three phases Phase I – SR, SCR, SWR, CR, ECOR, SECR Phase II – WR, WCR, NCR, NR, NWR Phase III – SER, ER, ECR, NER. NFR

ISSUES-COA Integration with dataloggers Links with RFID/GPS based tracking systems Integration with FOIS, COIS, CMS and other public interface systems like NTES, Call centers etc Record keeping of Control chart information – policy for archival

IMPACT ON TARGET- COA Board’s target for IR (76 locations) – Mar 2007 Latest review with CRIS indicates that software and hardware may become available by Dec 2006 Roll 7 divisions per month Mar divisions Jun divisions Dec divisions

DECISION/ASSITANCE- COA Telecom and C&IS directorates to decide terms and conditions for acquisition of interface software from Datalogger suppliers Safety and C&IS directorates to help freeze archival policy

STATUS-ICMS Enhanced scope  Punctuality Module  Implemented on IR. Migrated module will be given for testing by the end of July 2006  Coaching Stock Management Module  Being implemented in three phases  Software ready and under field trials at Nizamuddin & Chennai  Ready for roll out  Timetabling Module  Time table simulation module’s system requirements under discussion

STATUS-ICMS Enhanced scope (contd)  Coaching Stock Maintenance Module  Scope of Mechanical module has been enhanced from capturing of coaching depot maintenance related activities to automation of C&W department  It covers 154 depots & 975 coaching locations.  Scope of Electrical Maintenance module defines only 8 technical modules developed by NR under MIS projects. It also does not give assessment of hardware & user specifications.

ICMS – Coaching Stock Management Module Phase I – 114 terminals at 41 locations Target for implementation 31 st Aug 2006 Phase II - 78 terminals at 34 locations Target for implementation 31 st Oct 2006 Phase III terminals at58 locations Target for implementation 31 st Dec 2006 Training 186 staff from 136 locations trained so far Training labs being set up to take care of additional training needs Equipment Thin clients and printers supplied to all locations Datacom equipment- 57 LAN extenders supplied. Rest under supply UPSs to be procured by zonal railways – implementation held up for want of UPSs 14 locations commissioned – NR-1, WR-9, SECR-3 & SR locations have been provided connectivity.

ISSUES-ICMS Purchase of UPS – zonal railways Supply of datacom equipment by CRIS Freezing the scope of Mechanical & Electrical Maintenance Modules – Railway Board 450 pair modemsPO placed. Supply in a month 144 pair LAN extenders Supply completed 112 routersTC negotiation

IMPACT ON TARGET- ICMS Three months delay due to supply of UPS and datacom equipment Mar 2007Phase I & II – 192 locations Jun 2007All 320 locations

DECISION/ASSITANCE- ICMS C&IS directorate to facilitate freezing of scope for Mechanical & Electrical Maintenance Modules in view of dropping of work from MIS C&IS directorate to sanction & release funds for time tabling module.

STATUS-CMS Detailed estimate of Rs crores sanction by Railway Board. 302 lobbies to be covered, out of which 261 are integrated lobbies. Target for completion

STATUS-CMS Application under development and testing for Freight module Coaching, shunting and pilot module Suburban module Site Preparation Lump sum Rs 1,31,728 for major and Rs 82,890 for minor lobbies Target for readiness Aug 2006 Terminal Equipment Under vetting Target of Phase I supply - Dec 2006 Datacom Equipment Under vetting. Will be procured through CRIS Training Core group and core implementers will be trained at CRIS Core group identified on all 16 zonal railways Training labs being set up at 5 locations

ISSUES - CMS Difference in interpretation of Board’s circulars by zonal railways in calculation of running allowance

IMPACT ON TARGET- CMS Board’s target – 302 sites by Mar 2007 Latest review with CRIS indicates software and hardware will be available only by Dec Going by the FOIS and other roll out experience, commissioning of 30 sites per month would be a reasonable target March sites Dec sites

DECISION/ASSITANCE- CMS Nomination of Committee of ED s of Electrical, Mechanical, Personnel & Finance for practice to be adapted for computation of running allowance and other issues / business reengineering

GENERAL ISSUES- V-SAT HECL CONTRACT-235(+ OR- 25%) TOTAL NEED HUB CAPACITY-500 (CAN GO UPTO 1000) TRANSPONDER HIRING ISSUE

Problems relating to the VSAT Network Poor Application Response Time owing to High Round Trip Time (RTT) RTT varies between 1600 – 2400 ms for a 1000 Byte Packet Size vis-à-vis the desirable value of ms. High Delay Variation i.e. Jitter leading to inconsistency in the Application Response Time.

VSAT Issues Contd.. Voice communication facility not yet provided at the VSAT sites. Video Conference requirement between CRIS & zonal Rly. Hqrs. not addressed. Requirement of providing connectivity to a FOIS location using a terrestrial link from the VSAT based location not met. Backhaul Link Failure leads to total outage of all VSAT based locations. For instance, complete failure from 14:00 hrs on to 10:20 hrs of

VSAT Service Levels VSAT Network to operate using Shared Hub Services from HECL till Railway owned Hub is commissioned. Service Level Agreement w.r.t. Quality of Service (QoS) not available with the user Bandwidth Allocations/ Channel Access Mechanism on the Outbound & Inbound channels not known Status report of Captive Hub Project not available.

VSAT Migration to our own HUB Migration Plan for shifting the Remote VSATs to our own HUB needs to be worked out while specifying the following parameters: -Service disruption due to re-alignment of Antenna/Tx-Rx Frequency at each remote site. -Time required for establishing end-to-end connectivity between remote site and the FOIS datacentre -Overall Stabilization of the VSAT Network

GENERAL ISSUES - INFRASTRUTURE INVESTMENT SPACE-BLDG MANPOWER DISASTER TOLERANCE

GENERAL ISSUES - TRAINING CURRICULAM IN TRAINING INSTITUTES- TRAFFIC,MECHANICAL,ELECTRICAL -MPP DTE’S ROLE ADDITIONALTRAINING CENTERS –5 (DLI,SC,BB,HWH,TPJ)

Growth of IT projects in IR IR’s capital budget for IT is Rs. 273 crore in It is projected to increase to about Rs. 900 crore to Rs crore by 2010 – 2011 To make this scale of operation possible, requirement of space and other facilities for CRIS and FOIS organization needs to be significantly increased

Statement of Expenditure of the Projects under CAO/FOIS YEAREXPENDITURE (Rs. in Crores) 2000 – – – – – –

Anticipated increase in strength of FOIS and space requirement Year Approx IT budget (Rs. Crore) FOIS manpower (total) Manpower based in HQ Bare seating space (sq m) Support space Training areas, central control room etc. Total space requirement (sq m)

SPACE - CRIS location

SPACE – Area with Railways

Required facilities for expansion Secure areas in red Restricted areas in orange Open access in green

THANK YOU