LHCb Calorimeter upgrade

Slides:



Advertisements
Similar presentations
Target Operations A summary of Target Operation to Date Paul Hodgson The University of Sheffield.
Advertisements

1/9/2003 UTA-GEM Simulation Report Venkatesh Kaushik 1 Simulation Study of Digital Hadron Calorimeter Using GEM Venkatesh Kaushik* University of Texas.
Gauss: Generator Status Patrick Robbe, LAL Orsay, 6 Oct 2009.
Laboratoire de l’Accélérateur Linéaire (IN2P3-CNRS) Orsay, France Calorimeter upgrade meeting Olivier Duarte Upgrade calo FE review Comments : Digital.
1 S. E. Tzamarias Hellenic Open University N eutrino E xtended S ubmarine T elescope with O ceanographic R esearch Readout Electronics DAQ & Calibration.
1 5 December 2012 Laurent Roy Infrastructure / Electronics Upgrade -Cabling (long distance) -Rack and Crate (space, electrical distribution, cooling) -Detector.
Pixel Upgrade Status and Plan G.M. Bilei Firenze Mar. 6 th 2013.
1 Status of the calorimeter PMT’s time alignment LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Introduction Development status of the PMT time.
1 Control Software (CAT) Introduction USB Interface implementation Calorimeter Electronics Upgrade Meeting Frédéric Machefert Wednesday 5 th May, 2010.
Software Status  Last Software Workshop u Held at Fermilab just before Christmas. u Completed reconstruction testing: s MICE trackers and KEK tracker.
HCAL status and plans Yu. Guz.  Finally, no dead cells in the run However: There are unstable PMTs (mainly rate effect) Dark current.
The Enhanced RICH System for the LHCb Upgrade On behalf of the LHCb RICH Group Introduction Opto-Electronics and DAQ The Elementary Cell (EC) The Photon.
Configuration Management and Change Control Change is inevitable! So it has to be planned for and managed.
1 News and Miscellaneous UPO Mar Didier Contardo, Jeff Spalding o General news o ESP and Manpower needs o Cost scale for phase 2 o June Upgrade.
UTA GEM DHCAL Simulation Jae Yu * UTA DoE Site Visit Nov. 13, 2003 (*On behalf of the UTA team; A. Brandt, K. De, S. Habib, V. Kaushik, J. Li, M. Sosebee,
LBT Q Engineering Review DYB. 21-Dec-2007LBT Q Engineering Review Highlights (Q4/2007) Currently in Commissioning Phase Currently in Commissioning.
Online System Status LHCb Week Beat Jost / Cern 9 June 2015.
Development of Digital Hadron Calorimeter Using GEM Shahnoor Habib For HEP Group, UT Arlington Oct. 12, 2002 TSAPS Fall ’02, UT Brownsville Simulation.
S.MonteilCOMMISSIONING1 PS/SPD ELECTRONICS OUTLINE 1)STATUS OF PS/SPD FE BOARDS PRODUCTION 2)PHASES OF PS/SPD COMMISSIONING 1)LEDs AND DETECTORS 2)TUBES.
CERN September 29, 20041W.H.Trzaska HIP Jyväskylä T0 – TDR 22 nd LHCC meeting; Open Session CERN, September 29, 2004 W.H.Trzaska (for T0 collaboration)
1 Calorimeter electronics Upgrade Outcome of the meeting that took place at LAL on March 9th, 2009 Calorimeter Upgrade Meeting Barcelona March 10th-11st,
G. Carboni - Muon Meeting – Muon Meeting 12/ Agenda IntroductionGiovanni (30’) GEM and TDR AddendumWalter (20’) Update on M1 ratesAlessia.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
1 LHCb CALO commissioning meeting Anatoli Konoplyannikov /ITEP/ XCAL commissioning with LED Outline Scan data collected on HCAL and ECAL during.
Calorimeter Performance Paper Xavier Vilasís-Cardona Calo Meeting - Xvc1.
LHCb Calorimeter Meeting – 2 nd December 2015 Calorimeter upgrade update Universitat de Barcelona, Institut de Ciències del Cosmos ICC-UB Laboratoirede.
LHCb Software Week, 26th April /23 Tracking in LHCb E. Rodrigues, NIKHEF LHCb Software Week A Status Report.
STAR Collaboration Meeting, BNL – march 2003 Alexandre A. P. Suaide Wayne State University Slide 1 EMC Update Update on EMC –Hardware installed and current.
General Muon Meeting, 03-March-2014 Jay Hauser “Update on Phase 2 muon Technical Proposal”  Recent developments:  ME0 inserted into HGCAL as for other.
John MarshallPandora Development1 J.S. Marshall University of Cambridge.
Laboratoire de l’Accélérateur Linéaire, Orsay, France and CERN Olivier Callot 18 March 2003 Online Data Format and Condition Database Proposed data format.
Muon System Update: Next Steps Alessandro Cardini INFN Cagliari.
News and Misc Didier Contardo, Jeff Spalding UPO 3/2/12 1 UPO 2/2/12 o The MM, cost estimates and reporting o Milestones and scheduling o Chamonix Meeting.
Marco Cattaneo, 6-Apr Issues identified in sub-detector OO software reviews Calorimeters:18th February Tracking:24th March Rich:31st March.
Calorimeter global commissioning: progress and plans Patrick Robbe, LAL Orsay & CERN, 25 jun 2008.
1 ECS CALO LED Control System CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  Introduction  Calorimeter ECS LED monitoring.
Sergey BarsukElectromagnetic Calorimeter for 1 Electromagnetic Calorimeter for the LHCb experiment Perugia, Italy March 29 – April 2, 2004 ECAL CALO Sergey.
Software and TDAQ Peter Lichard, Vito Palladino NA62 Collaboration Meeting, Sept Ferrara.
August 24, 2011IDAP Kick-off meeting - TileCal ATLAS TileCal Upgrade LHC and ATLAS current status LHC designed for cm -2 s 7+7 TeV Limited to.
Sumary of the LKr WG R. Fantechi 31/8/2012. SLM readout restart First goal – Test the same configuration as in 2010 (rack TS) – All old power supplies.
CALO News Pascal Perret LPC Clermont 22 January 2012.
1 Calorimeter LED & LV - HV control systems LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Outline Status of the calorimeters LV & MV power supplies.
Guglielmo De Nardo University of Napoli and INFN
Cabling for LHCb Upgrade
SVT subchapters & editors
KEK news ( ) S.Tanaka.
PMT/CW Irradiation tests-2010
Recent progress of PureCsI+APD readout
Introduction LOI Hardware activities and GBT Simulations
ALICE analysis preservation
Physics Software Towards first Physics data Reconstruction Alignment
MICE Collaboration Meeting Saturday 22nd October 2005 Malcolm Ellis
Patrick Robbe, LAL Orsay, 13 May 2004
HCAL M&O-B Budget CMS Finance Board
LHCC referees’ questions, comments, requests
AIDA Alignment Package
Francesco Forti University and INFN, Pisa
Calorimeter Upgrade Session : News
Calorimeter Upgrade Meeting - News
Calorimeter upgrade meeting
Technical update 05 of April 2017
Commissioning of the ALICE-PHOS trigger
Tariffs Management (Wholesalers)
Training Module Introduction to the TB9100/P25 CG/P25 TAG Customer Service Software (CSS) Describes Release 3.95 for Trunked TB9100 and P25 TAG Release.
HL-LHC upgrade at IPHC news
Geant4 Documentation Geant4 Workshop 4 October 2002 Dennis Wright
OORich Implementation Status
VELO Software Update TELL1 Algorithms Error analysis
BES III Software: Short-term Plan ( )
IAS0600 DIGITAL SYSTEMS DESIGN
Presentation transcript:

LHCb Calorimeter upgrade TDR News Spares LHCb Calorimeter upgrade meeting Frédéric Machefert Laboratoire de l'Accélérateur Linéaire, Orsay

Outcome of the electronics review The outcome of the review is very positive No major problem with the foreseen implementation Thank you to All those who contributed to the review To the referees We have to think about the response of the group to the report Should be discussed today during the analog / digital sessions The document written will help us to write the electronics parts of the TDR to come But the format is not the same → some reshuffling is necessary

Agenda – Meeting of Sept 20th, 2013

Preparation of the Technical Design Report Introduction (1 page) (Frederic) Electronics Analog part (4 pages) (Barcelona) Digital part (2 pages for the FE and 2 pages for the control board) (Frederic+Christophe+Olivier) LLT (1 page) (Patrick) DAQ (TELL40...) (1 page) (Orsay) Auxiliary systems (HV, calibration, ...) (2 pages) (Yuri) Aging/radiation effects on the modules (3 pages, Yuri) including a section on the replacement of the modules during LS3 (Mechanics, Marie-Noëlle) (1 page) Performances Pile-up (2 pages) (Alexis) Particle identification without SPD/PRS (2 pages) (Dmitri) Installation, commissioning , responsibilities, organization, schedule, costs... Conclusions

Preparation of the Technical Design Report First Initial Draft of each section Latest Corrections First Draft 2nd Draft TB LHCC Circulation Circulation Oct, 11th Oct, 18th Oct, 25th Nov, 2nd Nov, 12th Nov, 26th The document can be accessed through svn (LHCbDocs) at And information on LHCbDocs can be found at : //svn.cern.ch/reps/lhcbdocs/Users/frederic/TDR_Sept2013/latest https://twiki.cern.ch/twiki/bin/view/LHCb/LHCbDocs

MC simulations SPD/PRS removal does not work in GAUSS and BRUNEL Some xml files concerning the SPD/PRS are required Plan is to keep them in the next release of GAUSS temporarily No arm, the files are useless But unfortunately, the software needs the files to be there The second problem is more annoying Brunel needs to access some containers for electron reconstruction The corresponding algorithms need some PRS/SPD information Hard coded in the software Brunel crashes abruptly Olivier works on this in order to be able to configure correctly the algorithms. We have 3 large samples which have been produced by Paul No SPD/PRS A simple trick → Brunel does not crash anymore But, electrons are not reconstructed 3 completed productions : event type 13102201 ( Bs_phigamma=DecProdCut ) Nu= 3.8, 7.6, 11.4 - ~100k events per sample.

Spares We plan to re-use a fraction of the present system The problem of the spares is more severe than for any new system Systems made by external companies PMT Power supplies (aging, cumulated radiation effects) Fan Systems made by the LHCb groups Do we have any tension on the boards that we want to keep HV, calibration system Plan to use PRS/SPD power supplies as spares We have ~300 PMT spares → some may be used by 2015 Contact taken with Hamamatsu It seems that the reference we used (R7899-20) is still available Question on some ambiguity on the type of window Price of a series of PMT Wait for the answer from Hamamatsu